Attachment Federal Authority Advice Request for the York Factory First Nation Ten Shillings Aerodrome Project - due May 26, 2025

  • York Factory First Nation Ten Shilling Aerodrome Project
  • Author: Administrator on behalf of Indigenous Services Canada
  • Reference number: 14
  • Submitted: 2025-05-27 - 3:56 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce ci-jointe  
  • Attachment included
  • Federal Authority Advice Record (FAAR) FAAR Response must be submitted by May 26, 2025 York Factory First Nation Ten Shilling Aerodrome Project – York Factory First Nation Registry File: 89488 Department/ Agency Indigenous Services Canada (ISC) Lead Contact Ayonniyi Jonathan Dehinbo (Sr. Environmental Specialist) Nicole Cerpnjak (Health Impact Assessment Coordinator) Full Address 200 – 365 Hargrave Street, Winnipeg, MB, R3B 3A3 200 Eglantine Driveway (Tunney’s Pasture), Ottawa, ON Email Ayonniyi.dehinbo@sac-isc.gc.ca nicole.cerpnjak@sac-isc.gc.ca Telephone 431-334-6471 873-353-8044 Alternate Contact ISC – Manitoba Region Shelly Johnson (Sr. Environmental Specialist) shelly.johnson@sac-isc.gc.ca Phone: 204-227-3891 ISC - First Nations and Inuit Health Branch Constantine Tikhonov (Section Head) constantine.tikhonov@sac-isc.gc.ca 1. a) Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the project to enable it to proceed? Indigenous Services Canada (ISC) does not anticipate exercising a power or perform a duty or function related to the Project. If yes, specify the Act of Parliament and that power, duty or function . b) Please describe any Indigenous or public consultation that will be undertaken in relation to the exercise of that power, duty or function, including when it would take place. c) Indicate if the power, duty or function will be required to construct the project. Please choose from Required, Potential, Likely, Unlikely, or Not Required as appropriate 2. Is your department or agency in possession of specialist or expert ...

Report

Attachment SUBMISSION: ECCC's FAAR Response to IPD for YFFN Ten Shilling Aerodrome

  • York Factory First Nation Ten Shilling Aerodrome Project
  • Author: Administrator on behalf of Environment and Climate Change Canada
  • Reference number: 11
  • Submitted: 2025-05-26 - 6:32 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce ci-jointe  
  • Attachment included
  • Federal Authority Advice Record (FAAR) FAAR Response must be submitted by May 26, 2025 York Factory First Nation Ten Shilling Aerodrome Project – York Factory First Nation Registry File: 89488 Department/Agency Environment and Climate Change Canada Lead Contact Leah Dirk, Acting EA Officer Full Address 11 Innovation Blvd Saskatoon, SK S7N 3H5 Email Leah.Dirk@ec.gc.ca EASouthPNR@ec.gc.ca Telephone (306) 514-2363 Alternate Contact EASouthPNR@ec.gc.ca 1. a) Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function . ECCC does not expect that it will be required to exercise a power or perform a duty or function related to the Project to enable it to proceed. Once the scope of the Project and of the assessment are established by the Agency, this may change as additional activities or Project components could come into scope. Please note the following requirements that may apply to this Project: Species at Risk Act permits For species listed in Schedule 1 of the Species at Risk Act (SARA) as Extirpated, Endangered or Threatened, a permit may be required from ECCC (section 73 of SARA) for activities that affect a listed terrestrial wildlife species, the residences of its individuals or any part of its critical habitat where those prohibitions are in place. Such permits may only be issued: if all reasonable alternatives to the activity that would reduce the impact on the species have been considered and the best solution has been adopted; all feasible measures will be taken to minimize the ...
  • Attachment included
  • Environmental Protection Operations Directorate Prairie & Northern Region ECCC File: 4194-10-5/3312 9250 49 Street Edmonton, AB T6B1K5 IAAC Registry: 89488 May 26, 2025 Sent via email: Impact Assessment Agency of Canada tenshilling@iaac-aeic.gc.ca RE: 89488 – York Factory First Nation Ten Shilling Aerodrome Project – Environment and Climate Change Canada’s (ECCC) Federal Authority Advice Record (FAAR) To the Impact Assessment Agency of Canada (IAAC): Environment and Climate Change Canada have completed a review of the Initial Project Description for the York Factory First Nation Ten Shilling Aerodrome Project proposed by York Factory First Nation. We are providing comments for IAAC’s consideration. Our expert advice is based on ECCC’s mandate in the context of subsection 36(3) of the Fisheries Act, the Species at Risk Act, the Migratory Birds Convention Act, 1994, the Canadian Environmental Protection Act, 1999, and their relevant regulations. Please contact, Leah Dirk, Acting Environmental Assessment Officer at 306-514-2363 or Leah.Dirk@ec.gc.ca if you have any questions or concerns. Sincerely, Jody Small Regional Director, Prairie and Northern Region cc: Cari-Lyn Epp, A/Unit Head, Environmental Assessment South PNR, ECCC Attachment(s): 20250526_YFFN Ten Shilling Aerodrome_FAAR_ECCC_FINAL <Original signed by>

Report

Attachment Manitoba Métis Federation- Comment on the summary of Initial Project Description for the York Factory First Nation Ten Shilling Aerodrome Project

  • York Factory First Nation Ten Shilling Aerodrome Project
  • Author: Administrator on behalf of Manitoba Métis Federation
  • Reference number: 13
  • Submitted: 2025-05-26 - 5:09 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce ci-jointe  
  • Attachment included
  • w w w . m m f . m b . c a York Factory Ten Shilling Aerodrome - Initial Project Description Review MMF – National Government of the Red River Métis May 26, 2025 MMF – Ten Shilling Aerodrome: Initial Project Description Review | 2 1.0 Introduction York Factory First Nation (the Proponent) has submitted an Initial Project Description (IPD) proposing to construct an aerodrome near York Factory, Manitoba, at the confluence of the Hayes River and Ten Shilling Creek (Figure 1). The Project (also referred to as Ten Shilling Aerodrome), would include the construction and operation of a 1530 m long gravel runway, up to 30 m wide, as well as an associated taxiway, parking apron, and other ancillary infrastructure for lighting, signage, and other aerodrome activities (Figure 2). The project site is remote, and as a result, electricity for aerodrome activities will be provided by on-site generators. Specifically, at this stage, the Project will include the following: • Mobilization of equipment to the Project; • Construction surveying; • Tree clearing; • Stripping; • Earthworks – cut to fill with grading and compaction; • Install either soil cement or granular base; • Construct ancillary facilities; • Installation of airfield lighting and electrical works (generator powered); • Runway inspection; and • Runway operation. Currently, Ten Shilling Creek is only accessible via helicopter, boat, and a seasonal clearing referred to as the CAT trail. Construction of the aerodrome would require equipment to access the area via the CAT Trail; however, it may require additional supports and equipment via helicopter and/or boat. Operational ...

Report

Attachment NRCan Federal Authority Advice Request for the York Factory First Nation Ten Shillings Aerodrome Project - due May 26, 2025

  • York Factory First Nation Ten Shilling Aerodrome Project
  • Author: Administrator on behalf of Natural Resources Canada
  • Reference number: 10
  • Submitted: 2025-05-26 - 3:25 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce ci-jointe  
  • Attachment included
  • UNCLASSIFIED - NON CLASSIFIÉ 26 May 2025 CIAR:89488 Chinenye Ewelike Impact Assessment Agency of Canda Prairie and Northern Region Submitted by email: tenshilling@iaac-aeic.gc.ca Subject: Natural Resources Canada Federal Authority Advice Record Response for York Factory Ten Shilling Aerodrome Project On May 5, 2025, Natural Resources Canada (NRCan) received a request from the Impact Assessment Agency of Canada (the Agency) to review the Ten Shilling Aerodrome Initial Project Description and complete the Federal Authority Advice Record (FAAR). Pursuant to section 23 of Impact Assessment Act (IAA 2019), NRCan has been asked to identify any specialist or expert information with respect the project. NRCan reviewed the Initial Project Description and identified an expertise in habitat connectivity for woodland caribou. However, NRCan will only provide the expertise and participate in the assessment process if requested by Environment and Climate Change Canada (ECCC). Details of NRCan’s response can be found in the Appendix A: York Factory First Nation Ten Shilling Aerodrome Project Federal Authority Advice Record. If you have any questions, comments, or concerns, please contact Natalie.Robinson@nrcan- rncan.gc.ca Sincerely, Natalie Robinson Senior Impact Assessment Impact Assessment Division, Office of the Chief Scientist Natural Resources Canada CC: Annie Monpetit, Acting Team Lead, Christina Clarke, Acting Director, Office of Chief Science, Natural Resources Canada Appendix A Federal Authority Advice Record https://iaac-aeic.gc.ca/050/evaluations/proj/89488 mailto:tenshilling@iaac-aeic.gc.ca UNCLASSIFIED - NON CLASSIFIÉ Appendix A: ...

Report

Attachment Health Canada Review - Federal Authority Advice Record York Factory First Nation Ten Shilling Aerodrome Project

  • York Factory First Nation Ten Shilling Aerodrome Project
  • Author: Administrator on behalf of Health Canada
  • Reference number: 12
  • Submitted: 2025-05-26 - 2:10 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce ci-jointe  
  • Attachment included
  • Unclassified / Non classifié S2aFederal Authority Advice Record (FAAR) FAAR Response must be submitted by May 26, 2025 York Factory First Nation Ten Shilling Aerodrome Project – York Factory First Nation Registry File: 89488 Department/Agency Health Canada Lead Contact David Kitchen Regional Manager (Manitoba, Saskatchewan & Nunavut) Environmental Health Program (EHP) Regulatory Operations & Enforcement Branch (ROEB) Full Address 391 York Ave, Winnipeg, MB, R3C 4W1 Email ia-mbsk-ei-mbsk@hc-sc.gc.ca Telephone Alternate Contact Ashley James, ashley.james@hc-sc.gc.ca, / 306-914-0380 1. a) Is i t p robable that your department or agency may be required to exerc ise a power o r perf o rm a duty o r f unct ion related to the p ro jec t to enab le it to p roceed? If yes, spec if y the Act o f Parl iament and that power, duty o r f unct ion . Not Applicable b) Please describe any Indigenous or public consultation that will be undertaken in relation to the exercise of that power, duty or function, including when it would take place. Not Applicable c) Indicate if the power, duty or function will be required to construct the project. Please choose from Required, Potential, Likely, Unlikely, or Not Required as appropriate Not Required 2. Is your department o r agency in possession of special ist or expert inf ormation or knowledge in its area of expertise that may be relevant to the conduct of an impact assessment o f the Pro jec t? Yes Spec if y the spec ial is t o r expert inf o rmat ion o r knowledge . As federal authority, Health Canada (HC) will provide specialist or expert information and knowledge in the ...

Report

Attachment Federal Authority Advice Request for the York Factory First Nation Ten Shillings Aerodrome Project - due May 26, 2025

  • York Factory First Nation Ten Shilling Aerodrome Project
  • Author: Administrator on behalf of Parks Canada
  • Reference number: 15
  • Submitted: 2025-05-26 - 11:31 AM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce ci-jointe  
  • Attachment included
  • Federal Authority Advice Record (FAAR) FAAR Response must be submitted by May 26, 2025 York Factory First Nation Ten Shilling Aerodrome Project – York Factory First Nation Registry File: 89488 Department/Agency Parks Canada Lead Contact Email Telephone Felipe Casasanta Mostaço, felipe.casasantamostaco@pc.gc.ca, 438-355-6731 Jennifer McCarter, jennifer.mccarter@pc.gc.ca, 226-820-6415 Alternate Contact Katherine Cumming, katherine.cumming@pc.gc.ca, 431-373-1340 1. a) Is i t p robable that your department or agency may be required to exerc ise a power o r perf o rm a duty o r f unct ion related to the p ro jec t to enab le it to p roceed? If yes, spec if y the Act o f Parl iament and that power, duty o r f unct ion . No. b) Please describe any Indigenous or public consultation that will be undertaken in relation to the exercise of that power, duty or function, including when it would take place. N/A c) Indicate if the power, duty or function will be required to construct the project. Please choose from Required, Potential, Likely, Unlikely, or Not Required as appropriate N/A 2. Is your department o r agency in possession of special ist or expert inf ormation or knowledge in its area of expertise that may be relevant to the conduct of an impact assessment o f the Pro jec t? Spec if y the spec ial is t o r expert inf o rmat ion o r knowledge . Parks Canada fulfils its mandate through the management and administration of Canada's national heritage protected areas. Parks Canada has specialist and expert information related to: • Management of protected areas, including national parks, national historic sites, ...

Report

Attachment York Factory First Nation Ten Shilling Aerodrome Project

  • York Factory First Nation Ten Shilling Aerodrome Project
  • Author: Administrator on behalf of Nicole Corrado
  • Reference number: 9
  • Submitted: 2025-05-25 - 11:44 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited on the Summary of the Initial Project Description
  • The killing of wildlife is not sustainable.  ? Currently, there are no laws mandating that Wildlife Management Programs at airports be humane and non lethal.  That means that virtually any legal method can be used.   (https://can01.safelinks.protection.outlook.com/?)   https://www.change.org/p/ask-airports-to-stop-killing-deer-and-turkeys-and-stop-trapping-coyotes    I am quite concerned with the requirements for a “wildlife control agent” at an airport to hold a firearm permit.  The laws thankfully do not mandate the killing of animals, but it does not forbid it either.  Firearms can carry non lethal repellents or lethal ammunition.  https://laws-lois.justice.gc.ca/eng/regulations/sor-96-433/page-22.html#h-989170    Please amend the laws to mandate that wildlife management is only done in a humane, cruelty free no kill manner, by an animal protection organization rather than a trapper, hunter or exterminator.     Wildlife airplane strikes kill animals and humans alike.  This is why it is essential that every airport has a wildlife program.  Airports can use any legal method of animal management. Transport Canada mandates that every airport has a “wildlife management” plan that mandates firearms training.  While this could be for non lethal humane hazing with noise, most airports trap and shoot animals. Montreal Trudeau International Airport hires Falcon Environmental Services to fly captive bred birds of prey around, along with birds.  Wildlife injured by the hawks are killed using shears, rather than receiving ...

Report

Attachment Federal Authority Advice Request for the York Factory First Nation Ten Shillings Aerodrome Project - due May 26, 2025

  • York Factory First Nation Ten Shilling Aerodrome Project
  • Author: Administrator on behalf of Women and Gender Equality Canada
  • Reference number: 8
  • Submitted: 2025-05-23 - 3:15 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce ci-jointe  
  • Attachment included
  • Non classifié - Unclassified Federal Authority Advice Record (FAAR) FAAR Response must be submitted by May 26, 2025 York Factory First Nation Ten Shilling Aerodrome Project – York Factory First Nation Registry File: 89488 Department/Agency Women and Gender Equality Canada (WAGE) Lead Contact Miga Chultem, Director, GBA Plus Directorate, Strategic Policy Branch Full Address 22 Eddy Street, 10th Floor Gatineau, QC J8X 2V6 Email FEGC.EvaluationImpacts-ImpactsAssessment.WAGE@fegc-wage.gc.ca Telephone 819-938-1132 Alternate Contact Megan Kirby, Policy Officer, GBA Plus Directorate, Strategic Policy Branch Megan.Kirby@fegc-wage.gc.ca 1. a) Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function . b) Please describe any Indigenous or public consultation that will be undertaken in relation to the exercise of that power, duty or function, including when it would take place. c) Indicate if the power, duty or function will be required to construct the project. Please choose from Required, Potential, Likely, Unlikely, or Not Required as appropriate 1. a) WAGE does not hold any regulatory power, functions, or duties. b) N/A. c) Not Required. 2. Is your department or agency in possession of specialist or expert inf ormation or knowledge in its area of expertise that may be relevant to the conduct of an impact assessment of the Project? Specify the specialist or expert information or knowledge. WAGE holds expertise in the application of GBA Plus (as ...

Report

Attachment Federal Authority Advice Request for the York Factory First Nation Ten Shillings Aerodrome Project - due May 26, 2025

  • York Factory First Nation Ten Shilling Aerodrome Project
  • Author: Administrator on behalf of Fisheries and Oceans Canada
  • Reference number: 7
  • Submitted: 2025-05-22 - 5:29 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce ci-jointe  
  • Attachment included
  • Federal Authority Advice Record (FAAR) FAAR Response must be submitted by May 26, 2025 York Factory First Nation Ten Shilling Aerodrome Project – York Factory First Nation Registry File: 89488 Department/Agency Fisheries and Oceans Canada Lead Contact Lisa Wren, Team Leader, Triage and Planning Full Address 867 Lakeshore Road, Burlington, ON L7S 1A1 Email Lisa.Wren@dfo-mpo.gc.ca Telephone 905-973-8392 Alternate Contact Sheeva Nakhaie, Sheeva.Nakhaie@dfo-mpo.gc.ca 1. a) Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function. A Fisheries Act paragraph 35(2)(b) Authorization will be required if the project is likely to cause the harmful alteration, disruption, or destruction to fish habitat and/or a Fisheries Act paragraph 34.4(2)(b) Authorization if the project is likely to result in the death of fish. Based on the information provided, it is our understanding that there will be no in -water works related to this project. As such, it is not likely that Fisheries and Oceans Canada (DFO) would be required to exercise a power or perform a duty of function to allow this project to proceed. Should works be proposed that may impact fish and fish habitat (including, for example, water crossings that may be required to access the site), we recommend that the proponent submit a Request for Review for DFO which outlines the specific impacts of the project on fish and fish habitat for review under the Fisheries Act. DFO also reviews projects for effects to listed aquatic species at risk, any part of ...

Report

Attachment Transport Canada Federal Authority Advice Record for the York Factory First Nation Ten Shillings Aerodrome Project

  • York Factory First Nation Ten Shilling Aerodrome Project
  • Author: Administrator on behalf of Transport Canada
  • Reference number: 6
  • Submitted: 2025-05-20 - 3:02 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce ci-jointe  
  • Attachment included
  • Federal Authority Advice Record (FAAR) FAAR Response must be submitted by May 26, 2025 York Factory First Nation Ten Shilling Aerodrome Project – York Factory First Nation Registry File: 89488 Department/Agency Transport Canada Lead Contact Jackie Barker Full Address 344 Edmonton Street, Winnipeg, Manitoba, R3P 2G5 Email Jackie.barker@tc.gc.ca Telephone 204-979-1739 Alternate Contact 1. a) Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function . b) Please describe any Indigenous or public consultation that will be undertaken in relation to the exercise of that power, duty or function, including when it would take place. Transport Canada (TC) oversees and regulates civil aviation in Canada and is responsible for administering the Aeronautics Act and its associated Canadian Aviation Regulations (CARs), which will apply to the construction and operation of the proposed Ten Shillings Aerodrome. However, this regulatory oversight does not constitute TC exercising a power or performing a duty or function. To construct a new aerodrome, a proponent must provide for consultation, in accordance with Canadian Aviation Regulation (CAR 307). The intent of the Regulation is to compel consultation in advance of an aerodrome work that will result in sustained and regular impact on interested parties as identified in the Regulation. CAR 307 identifies the requirement to consult to include anyone seeking to undertake a prescribed aerodrome work at a certified or non-certified aerodrome, ...