Transportation, storage concerns

Reference Number
932
Text

My name is Leigh Potvin. I'm a lifelong resident of Thunder Bay, a parent, and I'm concerned about the DGR.
There were  600 comments made on
the Initial Project Description. The draft guidelines do not require
enough information about the NWMO's project. I am concerned that the containers for storing waste have not been test to failure. I'm also concerned about transportation and the potential for damage, contamination, and spills.  Thedraft guidelines should and must require a
detailed description of long-distance transportation plan, must require a detailed description of the NWMO's used fuel packaging plant and deep geological repository. 
keep the north nuclear free and nuclear waste out of the north.

Submitted by
Leigh Potvin
Phase
Planning
Public Notice
Public Notice - Comments invited and information sessions on the draft Integrated Tailored Impact Statement Guidelines and draft Public Participation Plan
Attachment(s)
N/A
Date Submitted
2026-05-10 - 5:47 PM
Date modified: