Titre du commentaire
The public needs a full impact assessment of the project and a public hearing.
Présenté par
Carole Reed
Texte du commentaire

One serious concern i have is that transportation is not included in the project description.

Another concern is that the alternatives proposed in the NWMO project are either worse than those in the proposed plan or non-existent.

A third concern is that, according to Chief Michele Solomon, Fort William First Nation, “the voices of opposition have not been considered in the selection process scenario.”

What other technologies did NWMO consider, and how can we be assured that the ones NWMO chose are the best?

I feel strongly that the January 5 to February 4 comment period is too short. The timeline for the assessment of this project must be expanded to include more time for the public to study the proposal and future comment periods.

Thank-you

Date et heure de soumission
2026-01-28 16 h 15
Avis public
Avis public - Période de consultation publique sur le résumé de la description initiale du projet et possibilité d'aide financière
Phase
Planification
Numéro de référence
177
Date de modification :