Attachment Letters to the Impact Assessment Agency of Canada from the Kinross Gold Corporation, Wabauskang First Nation and Lac Seul First Nation regarding referral of the impact assessment process for the Great Bear Gold Project to a review panel

  • Great Bear Gold Project
  • Author: Administrator on behalf of Kinross Gold Corporation, Wabauskang First Nation and Lac Seul First Nation
  • Reference number: 78
  • Submitted: 2024-09-03 - 6:43 PM
  • Project phase: Impact Statement
  • Participation notice: Public Notice - Public Comments Invited on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce ci-jointe   
  • Attachment included
  • Chief Bill Petiquan Wabauskang First Nation Chief Clifford Bull Lac Seul First Nation <Original signed by> <Original signed by>
  • Attachment included
  • Great Bear Resources Ltd. A Kinross Company 104 Howey Street Red Lake, ON P0V 2M0 www.kinross.com 3 Sept 2024 The Hon. Steven Guilbeault Minister of Environment and Climate Change 200 Sacré-Coeur Boulevard Gatineau QC K1A 0H Impact Assessment Agency of Canada Ontario Region 600-55 York Street Toronto, Ontario MSJ 1R7 Attention: Anjala Puvanathan (Director, Ontario Region) Re: Great Bear Resources Ltd. ("Great Bear") – Great Bear Gold Project ("Project") – Response to Asubpeeschoseewagong Netum Anishinabek ("ANA") Request for Review Panel – Supplemental Comment For the reasons set out in Great Bear letter dated 9 July 2024, Great Bear maintains that a Review Panel is not required for this Project. We understand that Lac Seul First Nation (“LSFN”) and Wabauskang First Nation (“WFN”) have filed or will file a submission in which they also explain that they also do not see a Panel review as necessary. LSFN and WFN explain that they have designed an Anishinaabe-led Assessment (“ALA”) process to complement an Agency-led review of the Great Bear Project, rather than a Panel review. Great Bear has agreed to assist LSFN and WFN on this ALA and will respect the outcome of that review. Great Bear would be pleased to elaborate on any of the points in this letter. Regards, Luke Crosby Great Bear Resources Ltd., A Kinross Gold Company cc. Joseph Fobister, Land Protection Team Lead, Asubpeeschoseewagong Netum Anishinabek Mike Fobister, Land Protection Team Coordinator, Asubpeeschoseewagong Netum Anishinabek Jackie Esmonde, Land Protection Team Legal ...

Report

Attachment From the Ministry of Environment, Conservation, and Parks - Species at Risk Branch to the Impact Assessment Agency of Canada: Comments on the draft Tailored Impact Statement Guidelines and draft Cooperation Plan

  • Great Bear Gold Project
  • Author: Administrator on behalf of Ministry of Environment, Conservation, and Parks
  • Reference number: 66
  • Submitted: 2024-06-13 - 12:03 PM
  • Project phase: Planning
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • See the attached submission / Veuillez consulter la pièce jointe
  • Attachment included
  • CIAR #: 85832 Great Bear Gold Project Page 1 of 4 Comment Form - Draft Tailored Impact Statement Guidelines and Draft Cooperation Plan – Provincial Review Team Great Bear Gold Project Deadline: June 5, 2024 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (https://iaac-aeic.gc.ca/050/evaluations/proj/85832?culture=en-CA). Documents can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Registry directly at registry-registre@iaac-aeic.gc.ca. Please note that all comments submitted using this form will be posted on the Canadian Impact Assessment Registry website for the Project. Please note that this is your opportunity to provide input to the Tailored Impact Statement Guidelines. Ministry: Ministry of Environment Conservation and Parks IA Contact: Michelle Schott Telephone: (807)456-2727 Email: Michelle.schott@ontario.ca Section 1 – Draft Tailored Impact Statement Guidelines: 1. Please review the draft Tailored Impact Statement Guidelines (the Guidelines) sections that are applicable to your ministry’s mandate. 2. Using the table below, given the context of the Project, please provide any comments and include your recommendation for how the final Guidelines should be adapted to address any comments. • Please indicate any corrections, additions or deletions that should be made to the text. Please provide a clear context and rationale for your recommendations. • Please consider that expert advice should be commensurate to the situational context of the Project and informed by risk-based prudence and evidence in ...

Report

Attachment Great Bear Gold Project - Comments - Draft Tailored Impact Guidelines & Draft Public Participation Plan

  • Great Bear Gold Project
  • Author: Catherine Doucet
  • Reference number: 56
  • Submitted: 2024-06-07 - 11:36 PM
  • Project phase: Planning
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • Please see the attached files which provide the comments. Great Bear Gold Project - Comments - Draft Tailored Impact Guidelines - Catherine Doucet Great Bear Gold Project - Comments - Draft Public Participation Plan  - Catherine Doucet Borehole, drilling muds, and surface water contamination risks at the Great Bear Gold Project Thank you. Catherine Doucet
  • Attachment included
  • 1 Comments on the Draft Public Participation Plan for the Great Bear Gold Project Submitted by Catherine Doucet June 7, 2024 Overall, the Draft Public Participation Plan is very precise on presenting timelines and explaining what the process involves. Also, all the ways that interested parties may become involved. This allows for anyone impacted by the project to engage at all of the stages of the Impact Assessment process. It allows for being informed and clearly delineating how to participate. This should always be done as early on as is possible to provide an opportunity for the public to be engaged. They will then be included in considering the many and varied impacts that are associated with the project. Public participation tools - Page 5 The tools provided for the public appear quite comprehensive. There are multiple entry points for potential commenters to be engaged in the process, encapturing all ways that the public nowadays accesses services. In The Draft Public Participation Plan - Identification of participants on page 4, it is not clear how the Public Participation Plan distribution list is constructed. The highlighted text on page 4 of the 12 page document needs clarity. Public Participation Plan distribution list Communities and organizations included in the Public Participation Plan distribution list (Appendix 1 of the Public Participation Plan) were identified by the Agency as potentially having an interest in this impact assessment. The list was informed by previous participants in the Planning Phase for the Project; participants identified in documents provided by the proponent; and participants identified by the Agency in proximity to the ...
  • Attachment included
  • As of 2023, Kinross was still was still doing surface exploration drilling at the Great Bear Gold site. From 2017 to the end of 2022, the site had 1167 borehole drilled totaling more than 560 km in length. Table 1 below summarises the drilling activities at the site since 2017. . Table 1 Ref: Kinross Gold Corporation Great Bear Gold Project Ontario, Canada NI 43-101 Technical Report Effective Date: December 31, 2022 Issue Date: February 13, 2023 Google Earth satellite imagery (Figure1) taken from a scene over the Great Bear site in September 2023 shows a mosaic of drill pads. Diamond-bit core drilling at these pads have generated drilling muds that contain lubricants, water and rock cuttings from deep geological horizons. An example of drilling mud deposit on at least one drill pad at the Great Bear site is shown figure 2. This picture was taken in July 2021, consulting company for Kinross, AGP Mining Consultants. Fig. 2 Source: AGP (2021) Figure 12-1: Drill hole collars DHZ-060 and 061 (right, Hinge Zone) in Kinross Gold Corporation Great Bear Gold Project Ontario, Canada NI 43-101 Technical Report Effective Date: December 31, 2022 Issue Date: February 13, 2023 Year Company Holes Metres 2017 Great Bear Resources Ltd 9 1,093.00 2018 Great Bear Resources Ltd 70 16,578.60 2019 Great Bear Resources Ltd 164 68,869.00 2020 Great Bear Resources Ltd 192 110,673.50 2021 Great Bear Resources Ltd 305 138,253.10 Jan-Feb 2022 Great Bear Resources Ltd 30 19,616.10 Rest of 2022 Great Bear Resources Ltd 397 206,976.00 tot 1167 562,059.30 Drill mud deposits Fig.1 Visible drill pads at the Great Bear Gold site- ...
  • Attachment included
  • 1 Comments on the Draft Tailored Impact Statement Guidelines Submitted by Catherine Doucet June 7, 2024 The Impact Assessment Agency of Canada (IAAC), in its Draft Tailored Impact Statement Guidelines has provided a thorough list of most of the aspects needed to ensure that Kinross’s Great Bear Gold Project will be ‘climate change ready’. Section 13 – Effects of Potential Accidents or Malfunctions In Section 13.1, Risk Assessment, the proponent must ‘provide an explanation of how these events were identified (e.g. information sources, recognized risk assessment methodology, professional expertise, similar project, participants’ input)’. Overall, the points that are elucidated by IAAC in Section 13.1 – Risk assessment, are very comprehensive, requiring the identification of risks from any accidents, specifically, should they occur in close proximity to the mine site. Similarly for Section 14, Effects of the Environment on the Project, the same process should be applied. The same detail should be expected when the ‘Effects of the Environment on the Project’ are reviewed and analysed and written. Section 13.2 Mitigation Measures The various types of severe weather events, especially those brought on by climate change, point to the urgent need for rapid mitigation plans that are versatile and timely. Obviously, prevention and proper, priorly set up mitigation plans have the possibility of lowering the impact of any particular climate event. The mitigation measures itemized in Section 13.2 Mitigation Measures in the Draft Guidelines are quite thorough taking into account all potentially affected parties. Section 13.3 Emergency Management Detailed descriptions for ...

Report

Attachment Grassy Narrows First Nation comments on draft IEPP for the Great Bear Gold Project IA

  • Great Bear Gold Project
  • Author: Grassy Narrows First Nation
  • Reference number: 55
  • Submitted: 2024-06-07 - 5:04 PM
  • Project phase: Planning
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • Please see comments attached.
  • Attachment included
  • June 7, 2024 Attention: Anjala Puvanathan (Director, Ontario Region) (greatbear@iaac-aeic.gc.ca) Impact Assessment Agency of Canada Ontario Region 600-55 York Street Toronto, ON M5J 1R7 RE: Great Bear Gold Project – Comments on IAAC draft Indigenous Engagement and Partnership Plan On behalf of Asubpeeschoseewagong Anishinabek (“ANA” or Grassy Narrows First Nation”), we write to share with you Grassy Narrows’ preliminary comments on the draft Indigenous Engagement and Partnership Plan (“IEPP”) for the Great Bear Gold Project Impact Assessment. We have not had enough time or capacity support funding to complete a more fulsome review of the IEPP. As you know, Grassy Narrows is simultaneous being asked to respond to multiple permit applications from various provincial ministries regarding this Project. At the same time, Grassy Narrows was only given 30 days to review and provide comments on the IEPP and other documents like the draft Tailored Impact Statement Guidelines. That is not enough time. The Agency takes nearly a month to respond to short letters from ANA, even though it has extensive capacity and experience with this process. We have repeatedly asked the Agency for additional time, which is reflected in the draft IEPP itself, and these requests have been denied. We have also not received a response to our substantial concerns with the Project. We repeat our request that the Impact Assessment process be paused until the concerns and barriers expressed in our previous letters have been resolved and Grassy Narrows’ consent for the Impact Assessment process is obtained. This pause is necessary given these significant concerns, as well as to correct procedural missteps that ...

Report

Attachment Great Bear Gold Project - Provincial Authority Advice on Draft Tailored Impact Statement Guidelines and Draft Cooperation Plan

  • Great Bear Gold Project
  • Author: Ontario Ministry of Citizenship and Multiculturalism
  • Reference number: 54
  • Submitted: 2024-06-07 - 4:47 PM
  • Project phase: Planning
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • Amy Sen,  Please find attached the Minsitry of Citizenship and Multiculturalism's comments on the Draft Tailored Impact Statement Guidelines and Draft Cooperation Plan. Please do not hesitate to contact me with any questions or concerns. Regards, Joseph Harvey Heritage Planner | Heritage Branch | Citizenship Inclusion and Heritage Division Ministry of Citizenship and Multiculturalism | Ontario Public Service 613.242.3743  | Joseph.Harvey@ontario.ca (mailto:Joseph.Harvey@ontario.ca)  
  • Attachment included
  • CIAR #: 85832 Great Bear Gold Project Page 1 of 9 Comment Form - Draft Tailored Impact Statement Guidelines and Draft Cooperation Plan – Provincial Review Team Great Bear Gold Project Deadline: June 7, 2024 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (https://iaac-aeic.gc.ca/050/evaluations/proj/85832?culture=en-CA). Documents can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Registry directly at registry-registre@iaac-aeic.gc.ca. Please note that all comments submitted using this form will be posted on the Canadian Impact Assessment Registry website for the Project. Please note that this is your opportunity to provide input to the Tailored Impact Statement Guidelines. Ministry: Ministry of Citizenship and Multiculturalism (MCM) IA Contact: Joseph Harvey, Heritage Planner, Heritage Planning Unit Karla Barboza, Team Lead, Heritage Planning Unit Telephone: 613-242-1027 (Joseph) 416-660-1027 (Karla) Email: Joseph.harvey@ontario.ca Karla.barboza@ontario.ca Section 1 – Draft Tailored Impact Statement Guidelines: 1. Please review the draft Tailored Impact Statement Guidelines (the Guidelines) sections that are applicable to your ministry’s mandate. 2. Using the table below, given the context of the Project, please provide any comments and include your recommendation for how the final Guidelines should be adapted to address any comments. • Please indicate any corrections, additions or deletions that should be made to the text. Please provide a clear context and rationale for your ...

Report

Attachment Grassy Narrows First Nation - Comments on draft TISG for Great Bear Gold Project

  • Great Bear Gold Project
  • Author: CELA
  • Reference number: 53
  • Submitted: 2024-06-07 - 4:36 PM
  • Project phase: Planning
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • Please see the attached comments filed by CELA counsel on behalf of Grassy Narrows First Nation in relation to the draft Tailored Impact Statement Guidelines for the Great Bear Gold Project.  Grassy Narrows First Nation submits that the draft TISG is inadequate, unacceptable, and requires substantial revision before it can be finalized and issued to the proponent in this case. In short, the draft TISG is premature, inappropriate, overgeneralized, and overlooks or glosses over significant environmental issues that have been raised by Grassy Narrows First Nation during the planning phase to date. Accordingly, Grassy Narrows First Nation concludes the draft TISG should not be finalized and issued at this time.
  • Attachment included
  • Canadian Environmental Law Association T 416 960-2284 • 1-844-755-1420 • F 416 960-9392 • 55 University Avenue, Suite 1500 Toronto, Ontario M5J 2H7 • cela.ca June 7, 2024 BY EMAIL & VIA THE REGISTRY Great Bear Gold Project Impact Assessment Agency of Canada 55 York Street, 6th Floor Toronto, Ontario M5J 1R7 Email: GreatBear@iaac-aeic.gc.ca RE: IMPACT ASSESSMENT OF GREAT BEAR GOLD PROJECT [REFERENCE NUMBER 85832] – COMMENTS ON DRAFT TAILORED IMPACT STATEMENT GUIDELINES Please be advised that we are co-counsel for Asubpeeschoseewagong Anishinabek (“ANA” or “Grassy Narrows First Nation”) in relation to the above-noted designated project. Our client’s preliminary comments and concerns about the draft Tailored Impact Statement Guidelines (“TISG”) dated May 8, 2024 for the Great Bear Gold Project are set out below. In summary, ANA submits that the draft TISG is inadequate, unacceptable, and requires substantial revision before it can be finalized and issued to the proponent in this case. In ANA’s view, the draft TISG is premature, inappropriate, overgeneralized, and overlooks or glosses over significant environmental issues that have been raised by ANA during the planning phase to date. Moreover, despite its constitutionally protected rights, ANA’s views on the draft TISG have been belatedly solicited by the Agency within the same short deadline (June 7, 2024) that applies to stakeholders, non-governmental organizations, and members of the public. ANA strongly objects to being force-fit into this truncated “one-size-fits-all” type of engagement, which does not recognize ANA’s unique circumstances, needs, and priorities and does not provide ...
  • Attachment included
  • Riverbank Mercury Methylation Study Technical Report May 14, 2024 Submitted by: Dr. Brian Branfireun, PhD (Professor) Western University The numerical data presented in this report are validated and certified. The interpretations are based on best available information at this time, and may be subject to change pending further information and expert input. The opinions expressed in this report are the opinions of the author and should not be represented as the opinions of ANA, the EWRR Panel, or any other party. Brian Branfireun at London, Canada. May 14, 2024 1 Plain-Language Summary As part of a larger study of where methylmercury is produced in the Wabigoon River system, a laboratory experiment was done to determine if the water that is discharged from the Dryden Mill to the Wabigoon River makes the methylmercury contamination problem in the Wabigoon River ecosystem worse than it would otherwise be. This water does not contain additional mercury, however it does have high levels sulphate and organic matter; both are ingredients that are well-known to feed the bacteria that produce methylmercury from inorganic mercury in the environment. Mercury contaminated sediments were added to small bottles, and water with different chemistries were added to the bottles, including different levels of pure sulphate, and different levels of Mill effluent. Bottles were sampled at different times over a month, and methylmercury and other chemistry was measured in the experimental water. The results of the experiment showed that when added to mercury contaminated ...
  • Attachment included
  • 4879-5418-7904, v. 1 ANA PRELIMINARY CONCERNS ABOUT THE GREAT BEAR GOLD PROJECT Table of Contents I. The Context ............................................................................................................. 8 Who is Grassy Narrows ............................................................................................... 8 Social and Cultural Impacts of Crown Law and Policy. ................................................ 8 The Cumulative Effects of the Mercury Crisis and Industrial Activities Impacts. .......... 9 II. Ongoing Breaches of Crown Obligations: The 1978 Memorandum of Understanding, Honour of the Crown, and Fiduciary Duty ..................................... 11 1978 MOU and Dishonourable Conduct. ................................................................... 11 The Crown’s unmet fiduciary duties ........................................................................... 12 The Crown’s abandonment of negotiations required by the 1978 MOU ..................... 12 Ontario has failed to accurately identify the ANA Area of Interest on mining activities. ................................................................................................................................... 13 Grassy Narrows Laws Have Not Been Respected. .................................................... 15 III. The Crown Must Address Capacity Barriers ...................................................... 16 IV. The Great Bear Gold Project: The Crown’s failure to inform, meaningfully consult, and gain our consent for project activities. ............................................... 18 The Great Bear Gold Project falls within Grassy Narrows’ Interim Area of ...

Report

Attachment Enclosure 1 DFO submission

  • Great Bear Gold Project
  • Author: Department of Fisheries and Oceans (DFO)
  • Reference number: 52
  • Submitted: 2024-06-07 - 4:10 PM
  • Project phase: Planning
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • Please see DFO's comments in the attached document. 
  • Attachment included
  • CIAR #: 85832 Great Bear Gold Project Page 1 of 15 Comment Form – Draft Permitting Plan and Draft Tailored Impact Statement Guidelines – Federal Review Team Great Bear Gold Project Response required by: June 5, 2024 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (https://iaac-aeic.gc.ca/050/evaluations/proj/85832?culture=en-CA). Documents can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Registry directly at registry-registre@iaac-aeic.gc.ca. All comments submitted using this form will be posted on the Registry website for the Project. Please note that this is your opportunity to customize the draft Tailored Impact Statement Guidelines. Department/Agency: Fisheries and Oceans Canada IA Contact: Jenny Espitia Contreras and Natalie Boyd Telephone: 587-338-9219 Email: Melanie.Campbell@dfo- mpo.gc.ca Section 1 – Draft Permitting Plan: 1. Confirm that all applicable legislative and regulatory oversight that may apply to the Project, under the authority of your department or agency, is accurately listed in the draft Permitting Plan. Insert response here: The information regarding an Authorization under the Fisheries Act is accurate; however, the details provided are less detailed than those provided for other regulatory agencies (i.e., Environment and Climate Change Canada and Transport Canada).  Section 3.2 discusses the development and implementation of a fish habitat compensation plan – section 3.1 should contain similar text or it should be removed from section 3.2 for consistency. If text is added to section 3.1, DFO ...

Report

Attachment From the Northwestern Ontario Métis Community to the Impact Assessment Agency of Canada: Comments on the draft Tailored Impact Statement Guidelines and draft Indigenous Engagement and Partnership Plan

  • Great Bear Gold Project
  • Author: Administrator on behalf of Métis Nation of Ontario
  • Reference number: 67
  • Submitted: 2024-06-07 - 2:01 PM
  • Project phase: Planning
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • See the attached submission / Veuillez consulter la pièce jointe
  • Attachment included
  • Regional Councillor For the Northwestern Ontario Métis Community June 7, 2024 Impact Assessment Agency of Canada (IAAC) c/o Elyse Batista, Crown Consultation Coordinator Ontario Region 600-55 York Street Toronto ON M5J 1R7 Delivered via Email RE: Review of the Draft Version Tailored Impact Statement Guidelines and Draft Version of the Indigenous Engagement and Partnership Plan for the Great Bear Gold Project dated May 8, 2024 Dear Elyse Batista, The Métis Nation of Ontario (“MNO”) has conducted a review of the Draft Version of the Tailored Impact Statement Guidelines (“TISG”) dated May 8, 2024 and the Draft Version of the Indigenous Engagement and Partnership Plan dated May 8, 2024 for sufficiency in outlining the requirements of the Northwestern Ontario Métis Community (“NWOMC” also referred to as “Region 1”) represented by the Regional Consultation Committee (“RCC”). It is our understanding that the main objective of a TISG is to provide the proponent with directions and requirements for the preparation of an Impact Statement and are tailored during the Planning Phase. Further, it is our understanding that the main objective of the IEPP is to outline the opportunities and methods of Crown consultation with the NWOMC and other Indigenous groups throughout the assessment process for the Great Bear Gold Project. Overall, the comments note that substantial research and consultation must be undertaken in order to meet the requirements of the TISG and IEPP. Capacity, in terms of available NWOMC leadership and citizens, MNO staff, and funding for studies and reviews, will be the biggest challenge for the NWOMC to meaningfully participate in this ...

Report

Attachment Enclosure 1 - ESDC Comments on the Tailored Impact Statement Guidelines - Great Bear Gold Project

  • Great Bear Gold Project
  • Author: Employment and Social Development Canada
  • Reference number: 51
  • Submitted: 2024-06-07 - 1:09 PM
  • Project phase: Planning
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • Please see attached -- ESDC Comments on the Tailored Impact Statement Guidelines for the Great Bear Gold Project.
  • Attachment included
  • CIAR #: 85832 Great Bear Gold Project Page 1 of 3 Comment Form – Draft Permitting Plan and Draft Tailored Impact Statement Guidelines – Federal Review Team Great Bear Gold Project Response required by: June 7, 2024 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (https://iaac-aeic.gc.ca/050/evaluations/proj/85832?culture=en-CA). Documents can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Registry directly at registry-registre@iaac-aeic.gc.ca. All comments submitted using this form will be posted on the Registry website for the Project. Please note that this is your opportunity to customize the draft Tailored Impact Statement Guidelines. Department/Agency: Employment and Social Development Canada Telephone: IA Contact: Kathy Kingsbury Email: kathy.kingsbury@hrsdc- rhdcc.gc.ca Draft Tailored Impact Statement Guidelines: Department – Comment ID (e.g., ECCC-01) Draft Guidelines Section Context and Rationale (provide an explanation of your comments) Recommendation: provide text to be inserted or deleted. Be specific on the location within the draft Guidelines that the text would be added/deleted. ESDC-01 7.0 – Assessment Methodology It is recommended that baseline information on childcare within the broader communities be provided, in addition to baseline information being requested on childcare for Indigenous Peoples, in order to determine the current status of childcare within those communities. Text to be inserted in section 7.2 Selection of valued components (pp. 27-28): Other health, social and economic conditions that may ...

Report

Attachment Indigenous Services Canada's comments on the draft Tailored Impact Statement Guidelines for the Great Bear Gold Project

  • Great Bear Gold Project
  • Author: Indigenous Services Canada
  • Reference number: 50
  • Submitted: 2024-06-07 - 12:11 PM
  • Project phase: Planning
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • Please see Indigenous Services Canada's comments on the draft Tailored Impact Statement Guidelines for the Great Bear Gold Project. 
  • Attachment included
  • CIAR #: 85832 Great Bear Gold Project Page 1 of 8 GCDOCS # 125102822 May Comment Form – Draft Permitting Plan and Draft Tailored Impact Statement Guidelines – Federal Review Team Great Bear Gold Project Response required by: June 5, 2024 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (https://iaac-aeic.gc.ca/050/evaluations/proj/85832?culture=en-CA). Documents can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Registry directly at registry-registre@iaac-aeic.gc.ca. All comments submitted using this form will be posted on the Registry website for the Project. Please note that this is your opportunity to customize the draft Tailored Impact Statement Guidelines. Department/Agency: Indigenous Services Canada IA Contact: Regional Coordinator, Special Programs Telephone: 807-624-1565 Email: aaron.dorland@sac-isc.gc.ca danielle.jeddore2@sac-isc.gc.ca graham.irvine@sac-isc.gc.ca Section 1 – Draft Permitting Plan: 1. Confirm that all applicable legislative and regulatory oversight that may apply to the Project, under the authority of your department or agency, is accurately listed in the draft Permitting Plan. Insert response here: Indigenous Services Canada (ISC) is not responsible for approving or issuing licences, permits or authorizations for the assessments of large, proposed projects. 2. Indicate whether your department or agency has identified any power that it will be unable to exercise to allow the Project to proceed, in whole or in part. For more information, please refer to subsection 17(1) of the IAA. ...

Report

Attachment Health Canada's comments on the draft Tailored Impact Statement Guidelines for the Great Bear Gold Project

  • Great Bear Gold Project
  • Author: Health Canada
  • Reference number: 49
  • Submitted: 2024-06-06 - 2:22 PM
  • Project phase: Planning
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • Please see Health Canada’s comments on the draft Tailored Impact Statement Guidelines for the Great Bear Gold Project.   
  • Attachment included
  • CIAR #: 85832 Great Bear Gold Project Page 1 of 16 Comment Form – Draft Permitting Plan and Draft Tailored Impact Statement Guidelines – Federal Review Team Great Bear Gold Project Response required by: June 7, 2024 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (https://iaac-aeic.gc.ca/050/evaluations/proj/85832?culture=en-CA). Documents can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Registry directly at registry-registre@iaac-aeic.gc.ca. All comments submitted using this form will be posted on the Registry website for the Project. Please note that this is your opportunity to customize the draft Tailored Impact Statement Guidelines. Department/Agency: Health Canada IA Contact: Dae Young Lee Email: ia-on-ie-on@hc-sc.gc.ca Section 1 – Draft Permitting Plan: 1. Confirm that all applicable legislative and regulatory oversight that may apply to the Project, under the authority of your department or agency, is accurately listed in the draft Permitting Plan. Not applicable 2. Indicate whether your department or agency has identified any power that it will be unable to exercise to allow the Project to proceed, in whole or in part. For more information, please refer to subsection 17(1) of the IAA. Not applicable https://iaac-aeic.gc.ca/050/evaluations/proj/85832?culture=en-CA mailto:registry-registre@iaac-aeic.gc.ca CIAR #: 85832 Great Bear Gold Project Page 2 of 16 Section 2 – Draft Tailored Impact Statement Guidelines: 1. Please review the draft Tailored Impact Statement ...

Report

Attachment Pakwash Lake Owners Association and Kimberly Budweg of Pakwash Lake Camp May 8, 2024 to June 7, 2024 - Open Comments

  • Great Bear Gold Project
  • Author: Pakwash Lake Camp
  • Reference number: 48
  • Submitted: 2024-06-05 - 8:24 PM
  • Project phase: Planning
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • Follow up from previous submission and Meeting with Kinross Great Bear dated March 28, 2024 Kinross -Great Bear Project Since the 3rd meeting with Kinross regarding the future mine,  The majority of our concerns will see the greatest impact on our Pakwash Lake, Chukuni River Waterways , wildlife, fisheries, vegetation and ecosystem once the Mining Operation advances into full production with it’s open pit, underground exploration, and fully operation Large capacity Mill 2025-2029. The Chukuni and Pakwash Lake Water basin sees a huge variation in water elevation over the years.  Information can be seen here LWCB.com (http://lwcb.com/) has the up to date water basin elevations, aswell as past years floods, and droughts. chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.lwcb.ca/pdf/PakwashLake.pdf Chukuni River flow percentiles data:https://www.lwcb.ca/percentiles/PctReport-ChukuniRiver-Flow-PdEnding2015.pdf You’ll see it’s split up by quarter-month (or approximately every week).  The maximum flows are at the top of the tables and the minimum are at the bottom.  For average flow, look at the 50th percentile, or the line in the middle of the table. 1.  a) Our Request for Kinross, to Identify The Anderson’s Family Trapline RL87 N068 as Stakeholders.      b) Our Request for Kinross to Identify Pakwash Lake Owners Association as a ...

Report

Attachment Gold Mining kills animals

  • Great Bear Gold Project
  • Author: Nicole Corrado
  • Reference number: 46
  • Submitted: 2024-06-04 - 12:22 PM
  • Project phase: Planning
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • Please say NO to the Great Bear Gold Project.  Gold mining involves the use of cyanide, which is deadly to all life.  Indigenous peoples live here.  Their homes would be destroyed, and they would be subject to the toxicity of mining.  The mine would also destroy the habitats of fish, birds, woodland caribou, pine martens, and plenty of other animals. During this climate emergency, we can not afford to destroy forests and wildlife habitat.     Gold mining is harmful to all life, and to the planet.  Forcing fish and birds to be exposed to the effluent, and cutting them up to test them for selenium and other pollutants is cruel and outdated.  Canada is phasing out toxicity testing on animals.  Please switch to animal free methods of testing effluent and other substances.  For wild fish and birds, please stop lethal sampling and switch to humane non lethal bio monitoring like is done in humans. https://www.change.org/p/stop-testing-sewer-water-on-laboratory-fish   Please do not build another gold mine.  We are in the midst of a climate crisis. This proposal, which would damage and destroy the homes of black bears, caribou, birds, fish, and many animals, is terrible.  And gold mines destroy all sorts of animals in laboratory testing of their effluents, and in lethal sampling of birds, fish, frogs, etc.  We do not need more gold mines. Please preserve the trees at this location.  Please do not build on an area that has a lot of ...

Report

Attachment God mining is harmful to all life

  • Great Bear Gold Project
  • Author: Nicole Corrado
  • Reference number: 45
  • Submitted: 2024-06-04 - 12:17 PM
  • Project phase: Planning
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • Please say NO to the Springpole Gold Project.  Gold mining involves the use of cyanide, which is deadly to all life.  Indigenous peoples live here.  Their homes would be destroyed, and they would be subject to the toxicity of mining.  The mine would also destroy the habitats of fish, birds, woodland caribou, pine martens, and plenty of other animals. During this climate emergency, we can not afford to destroy forests and wildlife habitat.     Gold mining is harmful to all life, and to the planet.  Forcing fish and birds to be exposed to the effluent, and cutting them up to test them for selenium and other pollutants is cruel and outdated.  Canada is phasing out toxicity testing on animals.  Please switch to animal free methods of testing effluent and other substances.  For wild fish and birds, please stop lethal sampling and switch to humane non lethal bio monitoring like is done in humans. https://www.change.org/p/stop-testing-sewer-water-on-laboratory-fish   Please do not build another gold mine.  We are in the midst of a climate crisis. This proposal, which would damage and destroy the homes of black bears, caribou, birds, fish, and many animals, is terrible.  And gold mines destroy all sorts of animals in laboratory testing of their effluents, and in lethal sampling of birds, fish, frogs, etc.  We do not need more gold mines. Please preserve the trees at this location.  Please do not build on an area that has a lot of ...

Report

Attachment Women and Gender Equality Canada (WAGE)'s Federal Authority Advices on the Draft TISG Guidelines and Draft Permitting Plan (Great Bear Gold Project)

  • Great Bear Gold Project
  • Author: WAGE
  • Reference number: 44
  • Submitted: 2024-06-04 - 8:15 AM
  • Project phase: Planning
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • Attached is WAGE's comments on the draft TISG Guidelines. WAGE does not have any comments on the Draft Permitting Plan.
  • Attachment included
  • CIAR #: 85832 Great Bear Gold Project Page 1 of 11 Comment Form – Draft Permitting Plan and Draft Tailored Impact Statement Guidelines – Federal Review Team Great Bear Gold Project Response required by: June 7, 2024 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (https://iaac-aeic.gc.ca/050/evaluations/proj/85832?culture=en-CA). Documents can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Registry directly at registry-registre@iaac-aeic.gc.ca. All comments submitted using this form will be posted on the Registry website for the Project. Please note that this is your opportunity to customize the draft Tailored Impact Statement Guidelines. Department/Agency: Women and Gender Equality Canada IA Contact: Denise Gareau, Director, GBA Plus Directorate, Research Results & Delivery and Center of Expertise Branch Telephone: 819-938-1132 Email: FEGC.EvaluationImpacts- ImpactsAssessment.WAGE@fegc- wage.gc.ca Section 1 – Draft Permitting Plan: 1. Confirm that all applicable legislative and regulatory oversight that may apply to the Project, under the authority of your department or agency, is accurately listed in the draft Permitting Plan. Insert response here: WAGE does not hold any regulatory power, functions, or duties. Based on the project’s potential effects relating to women and the advancement of gender equality, the following are potential effects within federal jurisdiction on which WAGE focus: ▪ Section 2 of the Impact Assessment Act: (c) With respect to the Indigenous people of Canada, an impact on: ...

Report

Attachment From the Ministry of Mines to the Impact Assessment Agency of Canada: Comments on the draft Tailored Impact Statement Guidelines and draft Cooperation Plan

  • Great Bear Gold Project
  • Author: Administrator on behalf of Ontario Geological Survey Ministry of Mines
  • Reference number: 79
  • Submitted: 2024-06-03 - 3:46 PM
  • Project phase: Impact Statement
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • See the attached submission / Veuillez consulter la pièce ci-jointe
  • Attachment included
  • CIAR #: 85832 Great Bear Gold Project Page 1 of 2 Comment Form - Draft Tailored Impact Statement Guidelines and Draft Cooperation Plan – Provincial Review Team Great Bear Gold Project Deadline: June 5, 2024 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (https://iaac-aeic.gc.ca/050/evaluations/proj/85832?culture=en-CA). Documents can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Registry directly at registry-registre@iaac-aeic.gc.ca. Please note that all comments submitted using this form will be posted on the Canadian Impact Assessment Registry website for the Project. Please note that this is your opportunity to provide input to the Tailored Impact Statement Guidelines. Ministry: IA Contact: Telephone: Email: Section 1 – Draft Tailored Impact Statement Guidelines: 1. Please review the draft Tailored Impact Statement Guidelines (the Guidelines) sections that are applicable to your ministry’s mandate. 2. Using the table below, given the context of the Project, please provide any comments and include your recommendation for how the final Guidelines should be adapted to address any comments. • Please indicate any corrections, additions or deletions that should be made to the text. Please provide a clear context and rationale for your recommendations. • Please consider that expert advice should be commensurate to the situational context of the Project and informed by risk-based prudence and evidence in the proponent’s Detailed Project Description1 and Response to the Summary of Issues2, with a strong ...

Report

Attachment Transport Canada Comment form Draft TISG and Permitting Plan - Great Bear Gold Project

  • Great Bear Gold Project
  • Author: Transport Canada
  • Reference number: 43
  • Submitted: 2024-05-22 - 1:11 PM
  • Project phase: Planning
  • Participation notice: Public notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and Public Participation Plan
  • Transport Canada's response to IAAC request for comments on the Draft TISG and Permitting Plan is attached.
  • Attachment included
  • CIAR #: 85832 Great Bear Gold Project Page 1 of 2 UNCLASSIFIED / NON CLASSIFIÉ Comment Form – Draft Permitting Plan and Draft Tailored Impact Statement Guidelines – Federal Review Team Great Bear Gold Project Response required by: June 5, 2024 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (https://iaac-aeic.gc.ca/050/evaluations/proj/85832?culture=en-CA). Documents can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Registry directly at registry-registre@iaac-aeic.gc.ca. All comments submitted using this form will be posted on the Registry website for the Project. Please note that this is your opportunity to customize the draft Tailored Impact Statement Guidelines. Department/Agency: Transport Canada IA Contact: Jeremy Craigs Telephone: 416-428-3394 Email: Jeremy.craigs@tc.gc.ca Section 1 – Draft Permitting Plan: 1. Confirm that all applicable legislative and regulatory oversight that may apply to the Project, under the authority of your department or agency, is accurately listed in the draft Permitting Plan. Insert response here: Confirmed. 2. Indicate whether your department or agency has identified any power that it will be unable to exercise to allow the Project to proceed, in whole or in part. For more information, please refer to subsection 17(1) of the IAA. Insert response here: Transport Canada has not identified any power that it will be unable to exercise to allow the Project to proceed, in whole or in part at this time. ...

Report

Attachment Great Bear Gold Project - IAAC application - Comments on Initial Project Description (IPD)

  • Great Bear Gold Project
  • Author: Catherine Doucet
  • Reference number: 19
  • Submitted: 2023-09-18 - 7:42 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on the Summary of the Initial Project Description
  • Great Bear Gold Project – IAAC application – Comments on Initial Project Description (IPD) Submitted by Catherine Doucet – September 18, 2023 Impact of a flood or wildfire on the mine operations: Overview Emergency preparedness and response Accidental events/malfunctions Potential for climate change related issues in this boreal forest region where the mine is proposed, particularly recent wildfires Flooding events, specifically at a nearby dam This application of submitting comments on the Initial Project Description of a Designated Project (IPD) for the Great Bear Gold Project is based primarily on the potential impacts of this project related to emergency preparedness and response and potential resulting malfunctions, both through error or lack of detailed plans. The focus is primarily on these impacts resulting from the increasing risk of climate change. All potential scenarios should be accounted for including recent boreal forest wildfires and flooding, specifically at the nearby dam. Any dangerous materials that are stored at the mining site could result in perilous results in the event of either wildfires or flooding events. The Pipeline corridor providing Enbridge natural gas that will be used for this project runs parallel to the project. The increased risk from wildfires must be considered in relation to this natural gas source. Wildfire risk management plans should be part of the emergency preparedness and response but have not been found in the IPD. There does not appear to be a section in the IPD on emergency preparedness and ...

Report

Attachment Ontario Ministry of Citizenship and Multiculturalism - Great Bear Gold Project - Comments on the Initial Project Description

  • Great Bear Gold Project
  • Author: Ontario Ministry of Citizenship and Multiculturalism
  • Reference number: 18
  • Submitted: 2023-09-18 - 5:00 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on the Summary of the Initial Project Description
  • Natalie Boyd,  Please see attached comments on the Initial Project Description for the Great Bear Gold project. Attached items include; Provincial Authority Advice Record (PAAR) Table 1 of PAAR MCM Comment table Please do not hesitate to contact myself if you have any questions. Thanks, Joseph Harvey | Heritage Planner Citizenship, Inclusion and Heritage Division | Heritage Branch | Heritage Planning Unit Ministry of Citizenship and Multiculturalism 613.242.3743 Joseph.Harvey@ontario.ca (mailto:Joseph.Harvey@ontario.ca)  
  • Attachment included
  • File 0018673 -Great Bear Gold Project (Initial Project Description) MCM Comments 1 Item Document Section Given Text MCM Comments 1. General n/a Please ensure that the terminology and framework is aligned with the federal EA process and associated guidance (such as the Technical Guidance for Assessing Physical and Cultural Heritage or any Structure, Site or Thing, and Standards and Guidelines for the Conservation of Historic Places in Canada). 2. General Ministry name “Ministry of Tourism, Culture and Sport (MTCS)” Effective October 17, 2022, responsibility for administration of the Ontario Heritage Act and provision of advisory services related to heritage have been transferred from the Ministry of Tourism, Culture and Sport (MTCS) to the Ministry of Citizenship and Multiculturalism (MCM). Responsibility for the Ontario Heritage Act and associated Provincial functions is now held by MCM. All references to MTCS should be replaced with the new Ministry name. 3. C7.1 (Site History) p. 34 Site History Indigenous Peoples have been active across northwestern Ontario since prior to the arrival of Europeans. The Project site is located within the traditional territories of Lac Seul First Nation and Wabauskang First Nation. Indigenous knowledge will be conducted by Indigenous Nations to provide further information regarding historic and current land uses. A Stage 1 archaeology study has been prepared for Project site and local vicinity (NAA 2023). There are no known archaeology sites in ...
  • Attachment included
  • 1 Table 1: Key Issues to inform decision-making The Agency asks that provincial ministries or agencies align expert advice with the Agency’s approach to tailoring, which focuses on key issues or effects that are likely to be relevant to the public interest decision. In identifying key issues, provincial authorities should be mindful of the Project’s context (size, scope, location), Indigenous knowledge and perspectives, and public concerns. Key issues that may be relevant to the public interest decision include: • effects that may be significant, based on provincial experts’ knowledge and experience with past projects; • effects that may impact Indigenous peoples and their rights, based on Indigenous knowledge and perspectives or experience with past projects; • effects on key species or habitats (e.g. at risk, important to Indigenous communities, commercial importance, provide important ecosystem function); • issues or effects that may result from novel project activities, components or technology; • effects with large uncertainties, including in the effectiveness of mitigation measures; • transboundary effects where mitigation measures are limited; • positive effects, including where project may support other governmental priorities, including reconciliation with Indigenous peoples; and • key concerns raised by Indigenous or local communities. Effects that are anticipated to be minor or which can be managed using well understood mitigation measures, existing guidance, and/or other regulatory processes may have simplified information requirements or may be removed entirely. Measured advice from provincial authorities on key issues and solutions —and on the scope and detail of any ...
  • Attachment included
  • 1 The Ministry of Citizenship and Citizenship and Multiculturalism (MCM) will review any technical cultural heritage studies related to this Project to ensure compliance with the Ontario Heritage Act and more generally support fulfilment of due diligence related to heritage. MCM has an interest in undertakings such as this under its mandate to develop policies and programs for the conservation of Ontario’s cultural heritage. As a government review agency, MCM reviews various applications and associated technical studies, including those under an environmental assessment process to ensure compliance with the Ontario Heritage Act and fulfillment of due diligence related to cultural heritage more generally. To meet its obligations related to the conservation of cultural heritage resources, including their identification, protection and wise management, the proponent retains qualified persons to prepare technical cultural heritage studies (e.g., archaeological assessments, cultural heritage evaluations, heritage impact assessments). It is these studies that MCM reviews. Under its mandate to conserve Ontario’s cultural heritage, MCM applies the following processes and approvals to address potential adverse effects on cultural heritage resources, including archaeological resources, built heritage resources and cultural heritage landscapes. Karla Barboza, Team Lead – Heritage, Heritage Planning Unit (karla.barboza@ontario.ca) 613-242-3743 joseph.harvey@ontario.ca 5th Flr, 400 University Ave., Toronto Ontario Ministry of Citizenship and Multiculturalism (MCM) Joseph Harvey, Heritage Planner, Heritage Planning Unit Enclosure: Provincial Authority Advice Record ...

Report

Attachment Great Bear Gold Project - Initial Project Description - ISC Comments

  • Great Bear Gold Project
  • Author: Indigenous Services Canada
  • Reference number: 14
  • Submitted: 2023-09-15 - 10:16 AM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on the Summary of the Initial Project Description
  • See attached, comments on IPD from Indigenous Services Canada.
  • Attachment included
  • GCDOCS # 117077890 Enclosure 1: Federal Authority Advice Record Response due by September 13, 2023 Great Bear Gold Project Agency File: 85832 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page1. Letters and forms can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Agency at GreatBear@iaac-aeic.gc.ca. Department/Agency Indigenous Services Canada Lead Contact Julia Gregory, Policy Analyst; Lands and Economic Development Full Address 10 WELLINGTON ST Gatineau, Quebec K1A 0H4 Email Julia.gregory@sac-isc.gc.ca Telephone 438-465-8693 Alternate Contact Nicole Cerpnjak, Health Impact Assessment Coordinator, Impact Assessment and Health Program nicole.cerpnjak@sac-isc.gc.ca 1. (a) Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Great Bear Gold Project (the Project) to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function. No. Indigenous Services Canada (ISC) is not responsible for approving or issuing licenses, permits or authorization for the assessments of large, proposed projects. (b) Please describe any Indigenous or public consultation that will be undertaken in relation to the excise of that power, duty or function, including when it would take place. Not applicable. 1 https://iaac-aeic.gc.ca/050/evaluations/proj/85832 mailto:Julia.gregory@sac-isc.gc.ca mailto:nicole.cerpnjak@sac-isc.gc.ca GCDOCS # 117077890 2. Is your department or agency in possession of specialist ...

Report

Attachment RE: Submitting Comments

  • Great Bear Gold Project
  • Author: Administrator on behalf of Crown Indigenous Relations and Northern Affairs Canada (CIRNAC)
  • Reference number: 16
  • Submitted: 2023-09-14 - 3:27 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on the Summary of the Initial Project Description
  •  Please see the attached submission 
  • Attachment included
  • GCDOCS # 116507932 Enclosure 1: Federal Authority Advice Record Response due by September 13, 2023 Great Bear Gold Project Agency File: 85832 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page1. Letters and forms can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Agency at GreatBear@iaac-aeic.gc.ca. Department/Agency Crown Indigenous Relations and Northern Affairs Canada (CIRNAC) Lead Contact James Neary Full Address 25 EDDY ST, Gatineau, Quebec K1A OH4 Email james.neary@rcaanc-cirnac.gc.ca Telephone 613-355-7285 Alternate Contact Michael Rowan michael.rowan@rcaanc-cirnac.gc.ca and Jessica Steffano jessica.steffano@rcaanc-cirnac.gc.ca 1. (a) Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Great Bear Gold Project (the Project) to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function. (b) Please describe any Indigenous or public consultation that will be undertaken in relation to the excise of that power, duty or function, including when it would take place. It is not probable that Crown-Indigenous Relations and Northern Affairs Canada (CIRNAC) will exercise a power or perform a duty or function related to the Project to enable it to proceed as CIRNAC is not a regulatory department with respect to the proposed project. CIRNAC facilitates communication and coordination of expertise within the department to external departments and agencies involved in impact assessment processes in Canada. 1 ...

Report

Attachment NRCan Responses: FAAR 13 September, 2023

  • Great Bear Gold Project
  • Author: Kathy McPherson
  • Reference number: 11
  • Submitted: 2023-09-13 - 7:48 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on the Summary of the Initial Project Description
  • Please see attached, NRCan's completed Federal Authority Advice Record.  This version is preliminary in nature as further expertise will be added in the coming week.  An updated version will follow.   Thank you for the opportunity to review, Kathy McPherson
  • Attachment included
  • UNCLASSIFIED - NON CLASSIFIÉ Enclosure 1: Federal Authority Advice Record Response due by September 13, 2023 Great Bear Gold Project Agency File: 85832 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page1. Letters and forms can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Agency at GreatBear@iaac-aeic.gc.ca. Department/Agency Natural Resources Canada Lead Contact Kathy McPherson/Shelley Ball Full Address 580 Booth Street, Ottawa Email shelley.ball@NRCan-RNCan.gc.ca, Kathy.mcpherson@ NRCan-RNCan.gc.ca Telephone Alternate Contact 250-361-7045 1. (a) Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Great Bear Gold Project (the Project) to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function. Yes, NRCan could issue a licence for the manufacturing and the storage of explosives under the Explosives Act to allow the project to proceed. Blasting will be done using an ammonium - nitrate/fuel oil explosive and/or an emulsion explosive. (p. 18) The project will require surface and underground explosives storage facilities for the project. 1 https://iaac-aeic.gc.ca/050/evaluations/proj/85832 UNCLASSIFIED - NON CLASSIFIÉ (b) Please describe any Indigenous or public consultation that will be undertaken in relation to the excise of that power, duty or function, including when it would take place. No Indigenous consultation will be required (with respect to the Explosives Act) as ...