Great Bear Gold Project

Comment Search Mobile

Comment Search

Skip to filters

160 results

Attachment Letter from the Métis Nation of Ontario Regarding the Great Bear Gold Project

  • Great Bear Gold Project
  • Author: Administrator on behalf of Métis Nation of Ontario
  • Reference number: 120
  • Submitted: 2026-08-19 - 6:47 PM
  • See the attached submission / Veuillez consulter la pièce jointe  
  • Attachment included
  • Suite 1100 – 66 Slater Street, Ottawa ON K1P 5H1 | Tel: 613-798-1488 | Fax: 613-722-4225 | metisnation.org I write on behalf of the MNO (“MNO) in connection with the approval of the Impact Assessment in respect of the Project, which was filed with the Impact Assessment Agency of Canada by Great Bear Resources Ltd. (“GBR”) on or about March 31, 2026 pursuant to the Impact Assessment Act (the “Authorization”). This letter confirms that the MNO: 1. understands the potential effects of the Project and the Authorization on the rights, interests, and claims of the NWOMC and MNO citizens as represented by the Métis Nation of Ontario, including those Aboriginal and Treaty rights, interests, and claims recognized and affirmed under Section 35 of the Constitution Act, 1982 (“Métis Section 35 Rights”); 2. acknowledges that any potential effects of the Project on Métis Section 35 Rights have been satisfactorily accommodated by GBR, including through the Community Benefit Agreement; 3. MNO supports, and does not oppose, the Project (including the advancement thereof) and the issuance of the Authorization to GBR; and 4. encourages the prompt granting of the Authorization without further delay. We trust the foregoing clearly sets out the position of MNO in respect of the Project and the Authorization. Métis Nation of Ontario Office of the Chief Executive Officer July 30, 2026 Great Bear Gold Project Impact Assessment Agency of Canada 55 York Street, 6th Floor By mail and email: greatbear@iaac-aeic.gc.ca Dear Impact Assessment Agency: RE: Great Bear Gold Project (the “Project”)

Report

Attachment Ministry of Environment, Conservation, and Parks (MECP) Provincial Authority Advice Record - Great Bear Gold Project Impact Statement

  • Great Bear Gold Project
  • Author: Administrator on behalf of Ministry of Environment, Conservation, and Parks
  • Reference number: 119
  • Submitted: 2026-08-13 - 9:55 AM
  • See the attached submission / Veuillez consulter la pièce jointe  
  • Attachment included
  • Enclosure 1: Provincial Authority Advice Record – Great Bear Gold Project Impact Statement (Batch 1, 2 and 3) Ministry or Organization Contact Information Submission Date Ministry/Organization Ministry of the Environment, Conservation and Parks Lead Contact, Title, Work Unit May Lyn Trudelle, Senior Program Support Coordinator, Environmental Assessment Branch Email, Phone MayLyn.Trudelle@ontario.ca 437.855.6117 Alternate Contact, Title, Work Unit Nick Colella, A\Supervisor, EA Program Support Unit, Environmental Assessment Branch Email, Phone Nick.Colella@ontario.ca 416.358.9934 1. Taking into account the Project Context and Targeted Questions for Batch 2 and 3 that IAAC has shared, the entire Impact Statement submission (Batch 1, 2 and 3) and provide views for IAAC’s consideration in the analysis of the Project’s effects and preparation of the Impact Assessment Report (Table 1) or identify potential outstanding information requirements in the Impact Statement (Table 2). You may also wish to provide IAAC with advice to the proponent to support regulatory efficiency (Table 3). Tables 1, 2 and 3 (attached) provide additional guidance to support your review. 2. As per the Cooperation Plan1, consider all the mechanisms in place to manage potential federal effects. If your ministry is responsible for, or aware of, any relevant provincial regulatory, policy or other instruments and measures (i.e. complementary measures2) that may help manage the project’s potential adverse federal effects, please specify and describe applicability to the project and any known limitations to managing effects. Name of Ministry / Organization Responder Title of ...

Report

Attachment Ministry of Citizenship and Multiculturalism (MCM) Provincial Authority Advice Record - Great Bear Gold Project Impact Statement

  • Great Bear Gold Project
  • Author: Administrator on behalf of Ministry of Citizenship and Multiculturalism
  • Reference number: 109
  • Submitted: 2026-06-08 - 4:48 PM
  • See the attached submission / Veuillez consulter la pièce jointe  
  • Attachment included
  • Ministry of Citizenship and Multiculturalism Heritage Planning Unit Heritage Operations Branch Citizenship, Inclusion and Heritage Division 16th Flr, 56 Wellesley St W Toronto, ON M5S 2S3 Tel.: 437.240.2379 Ministère des Affaires civiques et du Multiculturalisme Planification relative au patrimoine Opérations relatives au patrimoine Division des affaires civiques, de l’inclusion et du patrimoine 16e étage, 56 rue Wellesley Ouest Toronto, ON M5S 2S3 Tél.: 437.240.2379 June 8, 2026 EMAIL ONLY Amy Sen A/Director, Ontario Region Impact Assessment Agency of Canada 600-55 York Region Toronto, ON M5J 1R7 GreatBear@iaac-aeic.gc.ca MCM File : 0018673 Proponent : Great Bear Resources Ltd. (subsidiary of Kinross Gold Corp.) Subject : Impact Statement (Batch 3) Project : Great Bear Gold Project Location : Kenora District, ON Dear Amy Sen: Thank you for your letter dated April 14, 2026, requesting review of Batch 3 of the Impact Statement for the Great Bear Gold Project and the two enclosure forms. We understand that these materials are intended to support project planning and impact assessment in accordance with requirements under the Impact Assessment Act. MCM’s interest in this project relates to its mandate of conserving Ontario’s cultural heritage, which includes: • archaeological resources, including land and marine; • built heritage resources, including bridges and monuments; and • cultural heritage landscapes. Project Summary Kinross Gold Corporation is proposing the construction, operation, decommissioning and abandonment of a new open-pit and underground gold mine with an on-site metal mill, located 23 kilometres southeast ...
  • Attachment included
  • Enclosure 1: Provincial Authority Advice Record – Great Bear Gold Project Impact Statement (Batch 3) Please submit the completed form by May 29, 2026, via email at GreatBear@iaac-aeic.gc.ca. Ministry or Organization Contact Information Submission Date June 8, 2026 Ministry/Organization Ministry of Citizenship and Multiculturalism (MCM) Lead Contact, Title, Work Unit Karla Barboza, Team Lead, Heritage Planning Unit Anastasia Abrazhevich, Heritage Planner, Heritage Planning Unit Email, Phone karla.barboza@ontario.ca 416.660.1027 Anastasia.abrazhevich@ontario.ca 437.240. 2379 Alternate Contact, Title, Work Unit James Hamilton, Manager, Heritage Planning Unit Email, Phone james.hamilton@ontario.ca 416.995.8404 1. Taking into account the Project Context and Targeted Questions that IAAC has shared, review Batch 3 of the Impact Statement and provide views for IAAC’s consideration in the analysis of the project’s effects and preparation of the Impact Assessment Report (Table 1) or identify potential outstanding information requirements in the Impact Statement (Table 2). You may also wish to provide IAAC with advice to the proponent to support regulatory efficiency (Table 3). Tables 1, 2 and 3 (attached) provide additional guidance to support your review. 2. As per the Cooperation Plan1, consider all the mechanisms in place to manage potential federal effects. If your ministry is responsible for, or aware of, any relevant provincial regulatory, policy or other instruments and measures (i.e. complementary measures2) that may help manage the project’s potential adverse federal effects, please specify and describe applicability to the project and any known limitations ...

Report

Attachment Ministry of Energy and Mines (MEM) Provincial Authority Advice Record - Great Bear Gold Project Impact Statement

  • Great Bear Gold Project
  • Author: Administrator on behalf of Ministry of Energy and Mines
  • Reference number: 106
  • Submitted: 2026-06-05 - 11:10 AM
  • See the attached submission / Veuillez consulter la pièce jointe  
  • Attachment included
  • 1 Ministry of Energy and Mines (MEM) Mineral Development Branch 933 Ramsey Lake Road, B6 Sudbury ON P3E 6B5 Tel.: (705) 670-5798 Fax: (705) 670-5803 Toll Free: 1-888-415-9845, Ext 5798 ministère de l'Énergie et des Mines (MEM) Direction de l’exploitation des minéraux 933, chemin du lac Ramsey, étage B6 Sudbury ON P3E 6B5 Tél. : 705 670-5798 Téléc. : 705 670-5803 Sans frais : 1 888 415-9845, poste 5798 MEMORANDUM: June 3, 2026 To: Colin Hovi Mineral Exploration and Development Consultant, MEM From: Andrea Hanson, M.Sc., P.Geo. Geoscience Rehabilitation Specialist, MEM Re: Great Bear Project, Kinross – Commitments Review As requested, I have conducted a cursory review of the following documents pertaining to the Great Bear Advanced Exploration Project: • Water Quality Estimate Update Report (WSP, August 2025) • Groundwater Model Memo (WSP, October 2025) • 2026 Supplementation Well Pumping Test Results memo (WSP, March 2026) • AEX ISW Groundwater Monitoring Plan (WSP, November 2025) • AEX Predicted Drainage Chemistry Comparison (WSP, September 2025) • Advanced Exploration Program Metal Leaching and Acid Rock Drainage Assessment Report (WSP, September 2025) • ML/ARD Monitoring Plan – Kinetic Testing (WSP, September 2025) The objective of this review was to assess whether these documents align with the groundwater and ARD/ML commitments made by the proponent in the November 2024 Closure Plan (Section 4.4). This review is limited to evaluating alignment with commitment statements. A detailed technical review of datasets and models was not undertaken. 1. Commitment Summary The proponent committed to ...
  • Attachment included
  • Enclosure 1: Provincial Authority Advice Record – Great Bear Gold Project Impact Statement (Batch 3) Please submit the completed form by DATE, via email at GreatBear@iaac-aeic.gc.ca. Ministry or Organization Contact Information Submission Date Ministry/Organization Lead Contact, Title, Work Unit Email, Phone Alternate Contact, Title, Work Unit Email, Phone 1. Taking into account the Project Context and Targeted Questions that IAAC has shared, review Batch 3 of the Impact Statement and provide views for IAAC’s consideration in the analysis of the project’s effects and preparation of the Impact Assessment Report (Table 1) or identify potential outstanding information requirements in the Impact Statement (Table 2). You may also wish to provide IAAC with advice to the proponent to support regulatory efficiency (Table 3). Tables 1, 2 and 3 (attached) provide additional guidance to support your review. 2. As per the Cooperation Plan1, consider all the mechanisms in place to manage potential federal effects. If your ministry is responsible for, or aware of, any relevant provincial regulatory, policy or other instruments and measures (i.e. complementary measures2) that may help manage the project’s potential adverse federal effects, please specify and describe applicability to the project and any known limitations to managing effects. Name of Ministry / Organization Responder Title of Responder Date 1 https://iaac-aeic.gc.ca/050/evaluations/document/158179 2 Complementary measures are additional authorities of government officials or programs that may be used to mitigate effects that may be beyond the care and control of the ...
  • Attachment included
  • Enclosure 1: Provincial Authority Advice Record – Great Bear Gold Project Impact Statement (Batch 3) Please submit the completed form by DATE, via email at GreatBear@iaac-aeic.gc.ca. Ministry or Organization Contact Information Submission Date Ministry/Organization Ontario Ministry of Energy and Mines Lead Contact, Title, Work Unit Stephen Miller, Mineral Exploration and Development Consultant, Mineral Development Branch Email, Phone stephen.a.miller@ontario.ca, 807-633-9655 Alternate Contact, Title, Work Unit Email, Phone 1. Taking into account the Project Context and Targeted Questions that IAAC has shared, review Batch 3 of the Impact Statement and provide views for IAAC’s consideration in the analysis of the project’s effects and preparation of the Impact Assessment Report (Table 1) or identify potential outstanding information requirements in the Impact Statement (Table 2). You may also wish to provide IAAC with advice to the proponent to support regulatory efficiency (Table 3). Tables 1, 2 and 3 (attached) provide additional guidance to support your review. 2. As per the Cooperation Plan1, consider all the mechanisms in place to manage potential federal effects. If your ministry is responsible for, or aware of, any relevant provincial regulatory, policy or other instruments and measures (i.e. complementary measures2) that may help manage the project’s potential adverse federal effects, please specify and describe applicability to the project and any known limitations to managing effects. Ontario Ministry of Energy and Mines Raymond McCarthy Name of Ministry / Organization Responder Rehabilitation Specialist – Surface ...

Report

Attachment Lac Seul First Nation (LSFN) and Wabauskang First Nation (WFN) Technical Review Comments - Great Bear Gold Project Impact Statement

  • Great Bear Gold Project
  • Author: Administrator on behalf of Lac Seul First Nation
  • Reference number: 104
  • Submitted: 2026-06-02 - 10:52 AM
  • See the attached submission / Veuillez consulter la pièce jointe  
  • Attachment included
  • Impact Statement and Closure Plan for the Great Bear Gold Project Technical Review June 2, 2026 Submitted by: Lac Seul First Nation Wabauskang First Nation Lac Seul First Nation and Wabauskang First Nation Review of Great Bear Impact Statement | 2 Executive Summary The proposed Great Bear Gold Project (Great Bear; the Project) owned by Kinross Gold Corp (Kinross; the Proponent) is in the heart of the shared Traditional Territories of Lac Seul First Nation (LSFN) and Wabauskang First Nation (WFN; collectively; Nations). LSFN & WFN have undertaken a technical review of the Impact Statement (IS) and the preliminary Closure Plan (CP) for the Great Bear Project with a focus on identifying potential adverse impacts to our Treaty and Aboriginal rights and interests from the proposed Project and proposing means by which the Proponent and/or the Crown may avoid, mitigate or accommodate those potential impacts. While our Nations are acutely aware of the potential adverse impacts to our Treaty and Aboriginal rights and interests from the Project, we are committed to engaging in good faith with both the Proponent and the Crown. This review is one component of our extensive ongoing engagement on the Project. The findings of this technical review and the subsequent responses from the Proponent will be incorporated into our ongoing Anishinaabe-Led Impact Assessment (ALIA) for the Great Bear Gold Project. Our ALIA is a Nation-led process wherein our Nations are engaging internally with our members, and externally with other nations, individuals, and corporations, to consider and assess how this Project may impact Anishinaabe Aki. The ALIA process is grounded in, and ...

Report

Attachment Stop the mine!

  • Great Bear Gold Project
  • Author: Nicole Corrado
  • Reference number: 100
  • Submitted: 2026-05-29 - 11:41 PM
  • Project phase: Impact Statement
  • Participation notice: Public notice - Comments invited on the summary of the Impact Statement
  • Please say NO to the Gold Project.  Gold mining involves the use of cyanide, which is deadly to all life.  Indigenous peoples live here.  Their homes would be destroyed, and they would be subject to the toxicity of mining.  The mine would also destroy the habitats of fish, birds, woodland caribou, pine martens, and plenty of other animals. During this climate emergency, we can not afford to destroy forests and wildlife habitat.     Gold mining is harmful to all life, and to the planet.  Forcing fish and birds to be exposed to the effluent, and cutting them up to test them for selenium and other pollutants is cruel and outdated.  Canada is phasing out toxicity testing on animals.  Please switch to animal free methods of testing effluent and other substances.  For wild fish and birds, please stop lethal sampling and switch to humane non lethal bio monitoring like is done in humans. https://www.change.org/p/stop-testing-sewer-water-on-laboratory-fish   Please do not build another gold mine.  We are in the midst of a climate crisis. This proposal, which would damage and destroy the homes of black bears, caribou, birds, fish, and many animals, is terrible.  And gold mines destroy all sorts of animals in laboratory testing of their effluents, and in lethal sampling of birds, fish, frogs, etc.  We do not need more gold mines. Please preserve the trees at this location.  Please do not build on an area that has a lot of trees, and do not build on a wetland either.  Please do not harm animals with this project. Please do not use animal testing for pollution monitoring.  It mentions that ...

Report

Attachment Great Bear Gold Project – Asubpeeschoseewagong Netum Anishinabek Comments on Great Bear Gold Project Impact Statement (Reference Number 85832)

  • Great Bear Gold Project
  • Author: Asubpeeschoseewagong Netum Anishinabek
  • Reference number: 99
  • Submitted: 2026-05-29 - 4:16 PM
  • Project phase: Impact Statement
  • Participation notice: Public notice - Comments invited on the summary of the Impact Statement
  • Please see attached the preliminary submissions filed on behalf of Asubpeeschoseewagong Netum Anishinabek (Grassy Narrows First Nation) on the Great Bear Gold Project Impact Statement and five expert reports:  - Appendix 'A' - Dr. Kevin Morin, “Great Bear Gold Project – Review of the Impact Statement (IS)”, dated May 27, 2026.  - Appendix 'B' -  Dr. Branfireun – Great Bear Project – Impact Statement dated May 29, 2026  - Appendix 'C' - Source Environmental Associates Inc. - Technical Memorandum: Review of the Great Bear Project Impact Statement – Preliminary Technical Review Comments, dated May 28, 2026  -Appendix 'D' - Source Environmental Associates Inc. ...
  • Attachment included
  • Canadian Environmental Law Association T 416 960-2284 • 1-844-755-1420 • F 416 960-9392 • 55 University Avenue, Suite 1500 Toronto, Ontario M5J 2H7 • cela.ca May 29, 2026 VIA EMAIL AND REGISTRY Great Bear Gold Project Impact Assessment Agency of Canada 55 York Street, 6th Floor Toronto, Ontario M5J 1R7 Email: GreatBear@iaac-aeic.gc.ca Re: Great Bear Gold Project – Asubpeeschoseewagong Netum Anishinabek Comments on Great Bear Gold Project Impact Statement (Reference Number 85832) Please be advised that we are co-counsel for Asubpeeschoseewagong Netum Anishinabek (“ANA” or “Grassy Narrows First Nation”) in relation to the Great Bear Gold Project (Reference Number 85832). Our client’s preliminary comments and concerns about the Great Bear Gold Project Impact Statement are set out below. ANA will submit supplementary submissions at a later date and reserves the right to provide further comments as more information becomes available. ANA notes that this Impact Statement has been filed with the Impact Assessment Agency of Canada (“Agency”) and the impact assessment process has continued despite ANA’s repeated requests for a pause in the assessment to resolve long-standing and unresolved substantive, procedural, and consultation issues, including deficient assessment of baseline conditions, unreliable methods for predicting mercury impacts, and adverse effects on the health, well-being and constitutional rights of ANA. The Impact Statement is incomplete, inadequate, and unpersuasive. It does not adequately address the mandatory factors in s.22 of the Impact Assessment Act, SC 2019, c 28, s 1 (“IAA”), nor does it contain all of the ...
  • Attachment included
  • TECHNICAL MEMORANDUM ____________________________________________________________________________ Date: May 28, 2026 To: Joseph B. Fobister, Lead Negotiator (Grassy Narrows Land Protection Team), David Sone (ANA Advisor), Jackie Esmonde (Legal Counsel) and Sydney Lang (Legal Counsel) of the ANA Advisory Team From: Fraser Riddolls (B.Sc., B.I.T.) and Emily MacMillan (MLWS, B.I.T, AAg) Subject: Additional Technical Review Comments on Fisheries, Aquatics, Migratory Birds, and HHERA - Great Bear Project Impact Statement Introduction Source Environmental Associates Inc. (Source) was retained by Asubpeeschoseewagong Netum Anishinabek (ANA) to review the Great Bear Project Impact Statement submitted in support of the proposed Great Bear Gold Project. This memorandum provides additional technical review comments from Source on fisheries and aquatic resources, fish habitat offsetting and compensation, migratory bird-related issues associated with proposed offsetting measures and selected human health and ecological risk assessment (HHERA) topics relevant to aquatic resources, traditional foods, and downstream receptors. The comments are intended to identify technical deficiencies, information gaps, uncertainties, and areas where additional assessment or clarification may be required before the potential effects of the Project can be adequately understood from ANA's review perspective. These comments supplement Source's broader technical review memorandum and focus on the following materials: • Section 8 – Analysis of Changes to Fish and Fish Habitat; • Section 9 – Analysis of Changes to Migratory Birds; • Section 15 – Cumulative Effects Assessment; • Appendix L-1 – Aquatic ...
  • Attachment included
  • 1 May 28, 2026 Brief opinion on the Great Bear Gold Project Impact Statement risk assessment (Appendix N) by WSP From April, 2026. I am a Principal at the firm I founded, NEK Associates LTD, and a Senior Research Scientist at the Harvard Center for Risk Analysis. I bring nearly 40 years experience to the design and implementation of human health and ecological risk assessments, focused on integrated, risk-based modeling approaches to support sustainable environmental decision making. I recently completed a series of reports and associated publications on behalf of the World Bank on exposure to methylmercury from artisanal scale gold mining. I have published peer reviewed papers on fish consumption and probabilistic risk modeling. I served on the Board of Scientific Counselors at the U.S. EPA for six years and was Chair for the last three. I am a member of the Scientific Advisors on Risk Assessment for the European Commission and serve as frequent peer reviewer under EU environmental grant programs. I served as Treasurer and President for the Society for Risk Analysis (SRA) where I am also a Fellow, and served as Treasurer and on the Board of Directors for the Society for Environmental Toxicology and Chemistry (SETAC). I received my A.B. cum laude from Harvard College, and my Sc.M. and Sc.D. from Harvard University in Environmental Science and Risk Management. Overall, this report relies on a flawed risk assessment and underlying modeling to conclude that project impacts on human and ecological health will be negligible. Comments and observations I made previously still stand and remain unaddressed. While the report predicts exceedances of regulatory thresholds for impacts of ...
  • Attachment included
  • May 29, 2026 To: J. Esmonde, Cavalluzzo LLP From: Dr. Brian Branfireun, London, Canada (bbranfir@uwo.ca) RE: Great Bear Project – Impact Statement (https://iaac-aeic.gc.ca/050/evaluations/document/166124) 1) Introduction I was asked to review the above Impact Statement documents for the Kinross/Great Bear Gold Pro ject and provide an expert opinion. I have also reviewed the report of Dr. K. Morin (May 2026) re lated to this same Impact Statement, as his expertise in geochemistry- and mine-related processes is relevant and complementary to mine. I have provided expert opinion on many submissions and memos related to dimensions of this project leading up to this Impact Statement, and this document largely relies on those prior submissions which will be referred to here where appropriate, in the in terest of brevity. Given the extensive technical scope of the IS documents I am unable to comment on many aspects as they are outside of my area of expertise. As such I am focussing on the compon ents of the Impact Statement which concern themselves with sulphate release from the Project, the evaluation of mercury methylation in receiving ecosystems, and the potential exposure to biota. 2) Summary of Opinions 1) Despite a substantial shift in the degree of acknowledgement of the sulphate – mercury methyla tion issue by the Proponent, the Proponent’s ultimate conclusion of little to no impact on methylmercury levels in fish (or consumers) by the proposed Project is arrived at through a flawed conceptualization of the processes involved, flawed field methodologies, and oversimplified mod- elling that combine to minimize project effects. 2) The minimization of the Project impact on mercury ...
  • Attachment included
  • TECHNICAL MEMORANDUM ____________________________________________________________________________ Date: May 28, 2026 To: Joseph B. Fobister, Lead Negotiator (Grassy Narrows Land Protection Team), David Sone (ANA Advisor), Jackie Esmonde (Legal Counsel) and Sydney Lang (Legal Counsel) of the ANA Advisory Team From: Martin Eunseo Shin (M.A.Sc., E.I.T.), Rina Freed (Ph.D., P.Eng.), Fraser Riddolls (B.Sc., B.I.T.), Sally Turnbull (B.Sc.) Subject: Review of the Great Bear Project Impact Statement – Preliminary Technical Review Comments Introduction Source Environmental Associates Inc. (Source) was retained by Asubpeeschoseewagong Netum Anishinabek (ANA) to review the Great Bear Project Impact Statement submitted in support of the proposed Great Bear Gold Project. The Great Bear Project herein represents a transition from the previously reviewed Advanced Exploration (AEX) Program to a proposed full-scale mining operation. The project includes both underground mine and open pit development, mine water management infrastructure, waste rock and ore handling facilities, water treatment systems, closure and reclamation components, and associated infrastructure with the potential to affect groundwater, surface water, aquatic ecosystems, and downstream receiving environments. This memorandum provides Source’s preliminary technical review comments on the Impact Statement and associated supporting documents. The review focuses on technical deficiencies, information gaps, uncertainties, and environmental risks, particularly with respect to: • Water quality and contaminant loading; • Groundwater and surface water interactions; • Mine water management and treatment; • ...
  • Attachment included
  • Great Bear Gold Project - Review of the Impact Statement (IS) prepared for: Grassy Narrows Lands Protection Team c/o Cavalluzzo Attn: Ms. Jackie Esmonde prepared by: Kevin A. Morin, Ph.D., P.Geo., L.Hydrogeo. Minesite Drainage Assessment Group www.MDAG.com contact@MDAG.com May 27, 2026 Great Bear Gold Project - Review of the Impact Statement (IS) 2 TABLE OF CONTENTS List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Report Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 1. Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 2. Major Irrefutable Errors Invalidating the Great Bear Impact Statement. . . . . . . . . . . . . . . . . . 14 2.1 The Nature and Likely Origin of the Major Irrefutable Errors in the Great Bear Impact Statement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 2.2 Major Irrefutable Errors in the Great Bear Water Balance Invalidates All Estimates of Water Flows and Associated Qualities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 2.3 Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 3. Many Grave and Major Errors in the Great Bear Groundwater Model That Grossly Underestimate Impacts on ...

Report

Attachment Grassy Narrows Preliminary Comments on Great Bear Gold Project Impact Statement

  • Great Bear Gold Project
  • Author: Grassy Narrows First Nation
  • Reference number: 98
  • Submitted: 2026-05-29 - 3:50 PM
  • Project phase: Impact Statement
  • Participation notice: Public notice - Comments invited on the summary of the Impact Statement
  • As a First Nation living immediately downstream from this project, we will live with the consequences for many generations to come. It is our children who will drink the water, eat the fish, pick the wild rice, swim, and learn what it means to be Anishinaabe on this river whose waters will carry the effluent from this gold mine if it is built. It is our people who will search in vain for moose and caribou to hunt on the landscape that has had its forests fragmented and degraded by access roads, clearcuts, seismic lines, pits, trenches, clearings, and mines. It is our people who will be impacted if the tailings dam fails. It is our people who will be poisoned when toxics leach into the water. It is our people whose fear and anxiety, already far too high and fatal due to the mercury crisis, will be heightened by the threat this mining project poses to our wellbeing. Grassy Narrows does not consent to the Great Bear Gold Project. And Grassy Narrows does not consent to the IS which contains inaccurate, insufficient, unreliable, and scientifically indefensible information about the impacts that are most dangerous to us, the first downstream community. The IS does not accurately nor sufficiently capture and assess the potential impacts of the Project on our environment, health, way of life, and ability to exercise our inherent, Aboriginal and Treaty rights, including the cumulative impacts of the Project and past, present, and future industrial activities. We urge IAAC not to move forward with the IA until Great Bear has provided a revised IS that meaningfully considers and incorporates our concerns including our Preliminary Land Use and Occupancy Study, the ETR and Grassy Narrows’ experts have had an ...
  • Attachment included
  • May 29, 2026 Attention: Anjala Puvanathan (Director, Ontario Region) (greatbear@iaac-aeic.gc.ca) Impact Assessment Agency of Canada Ontario Region 600-55 York Street Toronto, ON M5J 1R7 RE: Grassy Narrows Preliminary Comments on Great Bear Gold Project Impact Statement On behalf of Asubpeeschoseewagong Anishinabek (“ANA” or Grassy Narrows First Nation”), we write to share with you Grassy Narrows’ preliminary submission with respect to the Impact Statement (“IS”) prepared by Great Bear/Kinross for the Great Bear Gold Project. This submission is in addition to the expert reports identifying major deficiencies with the IS and risks of the Project, the comments on the IS from our legal counsel, and our previous submissions on the Project that we have shared with you. Grassy Narrows continues to be extremely concerned that Kinross wants permission to put more dangerous pollution into our life-giving river. The purpose of the Impact Assessment (“IA”) is to evaluate the potential environmental, economic, health, and social impacts of the Great Bear Gold Project. We do not believe that the IS prepared by Kinross provides the Impact Assessment Agency of Canada (“IAAC”) with accurate, sufficient, reliable, and scientifically defensible information to proceed with the Impact Assessment. We believe, based on what our experts tell us and our own traditional knowledge and experience, that the Project will cause unbearable and irreparable impacts on our environment, health, and rights. Grassy Narrows has already suffered far too much from the cumulative impacts of industry that has been forced on our lands, waters, and people with terrible consequences. Our people are sick, our fish ...

Attachment ORA comments on the Great Bear Gold Project, Summary of the Impact Statement

  • Great Bear Gold Project
  • Author: Ontario Rivers Alliance
  • Reference number: 97
  • Submitted: 2026-05-29 - 7:45 AM
  • Project phase: Impact Statement
  • Participation notice: Public notice - Comments invited on the summary of the Impact Statement
  • The Ontario Rivers Alliance (ORA) is a not-for-profit grassroots organization with a mission to protect, conserve and restore Ontario riverine ecosystems. ORA advocates for effective policy and legislation to ensure that development affecting Ontario rivers is environmentally and socially sustainable. See ORA's full comments in the attached file.
  • Attachment included
  • 379 Ronka Road Worthington, ON P0M3H0 LindaH@OntarioRiversAlliance.ca OntarioRiversAlliance.ca “A World of Healthy River Ecosystems” 29 May 2026 Impact Assessment Agency of Canada Place Bell Canada, 160 Elgin Street, 22nd Floor Ottawa, ON K1A 0H3 By email: GreatBear@iaac-aeic.gc.ca Re: Great Bear Gold Project, Summary of the Impact Statement IAAC Reference Number: 85832 Dear Agency Team: The Ontario Rivers Alliance (ORA) is a not-for-profit grassroots organization with a mission to protect, conserve and restore Ontario riverine ecosystems. ORA advocates for effective policy and legislation to ensure that development affecting Ontario rivers is environmentally and socially sustainable. ORA has closely monitored the Great Bear Gold Project throughout each phase of the Impact Assessment process. These comments, submitted at the Impact Statement (IS) Summary stage as the third of four public comment opportunities, represent ORA's first formal submission to this assessment. We have engaged at this stage because the IS Summary places the proponent's full evidence base before the Agency and the public, and it is here that the substantive gaps in that evidence base are most visible and most consequential to address before the technical record is closed. The proposed project is a large-scale open-pit and underground gold mine located within Treaty 3 territory, 23 kilometres southeast of Red Lake, Ontario, in the Chukuni River watershed. It would operate for 26 years, process 15,000 tonnes of ore per day, discharge treated effluent to the Chukuni River, and retain approximately 345 hectares of tailings behind three dams in perpetuity. The Chukuni ...

Report

Attachment Northwestern Ontario Métis Community Comments on the Impact Statement for the Great Bear Gold Project

  • Great Bear Gold Project
  • Author: Administrator on behalf of Northwestern Ontario Métis Community
  • Reference number: 114
  • Submitted: 2026-05-29
  • Project phase: Impact Statement
  • Participation notice: Public notice - Comments invited on the summary of the Impact Statement
  • La version française suit: Administrator Note: Please see the attached submission and notice of confidential Indigenous Knowledge received from the Northwestern Ontario Métis Community (document reference number 113). Note de l'administrateur : Veuillez consulter la pièce jointe et l'avis concernant le savoir autochtone confidentiel reçu de la communauté métisse du Nord-Ouest de l'Ontario (numéro de référence du document 113). 
  • Attachment included
  • Regional Councillor For the Northwestern Ontario Métis Community 1 May 29, 2026 Dietrich MacRae-Maahs Project Manager Great Bear Gold Project Impact Assessment Agency of Canada Sent via email: greatbear@iaac-aeic.gc.ca Dear Dietrich MacRae-Maahs: Re: Northwestern Ontario Métis Community’s Review of Kinross Gold Corporation’s Impact Statement for the Great Bear Gold Project This letter is submitted to the Impact Assessment Agency of Canada (“IAAC”) by the Northwestern Ontario Métis Community (“NWOMC”). On April 14, 2026, IAAC began a 45-day comment period for the Impact Statement submitted by Kinross Gold Corporation (“the Proponent”; “Kinross”), for the Great Bear Gold Project (the “Project”), having determined that the Impact Statement met the necessary requirements for the conduct of the impact assessment. The NWOMC completed a technical review of the Impact Statement with a focus on determining the adequacy of the Proponent’s assessment of impacts of the Project to the NWOMC’s s. 35 rights. In general, the NWOMC’s review found several discrepancies between the Impact Statement conclusions and the NWOMC’s Traditional Knowledge and Land Use Study (“TKLUS”) conclusions. Additional consideration of the NWOMC’s rights and perspectives, as well as additional mitigation measures, should be incorporated into the Impact Statement to address the discrepancy. This letter summarizes: (1) the NWOMC’s comments on the Impact Statement, and (ii) the NWOMC’s proposed additional mitigation measures. The NWOMC engaged MNP LLP to conduct a review of the Impact Statement and the draft Closure Plan. Below is a summary of key comments, along with the following enclosures: ...

Report

Attachment Great Bear Impact Statement Response

  • Great Bear Gold Project
  • Author: Evolution Mining
  • Reference number: 96
  • Submitted: 2026-05-28 - 2:59 PM
  • Project phase: Impact Statement
  • Participation notice: Public notice - Comments invited on the summary of the Impact Statement
  • Please see attached PDF on behalf of Evolution Mining, Red Lake Operations 
  • Attachment included
  • Evolution Mining Limited Evolution Mining Gold Operations Ltd. CN: 1175320-7 (A subsidiary of Evolution Mining Limited ABN 74 084 669 036) Red Lake Operations P +807 735 2077 15 Eric Radford Way, Bag 2000 Balmertown, ON P0V 1C0 Canada Registered Office 66 Wellington Street West TD Bank Tower Suite 5300 Toronto, ON M5K 1E6 Canada www.evolutionmining.com.au 1 May 28, 2026 Kinross Great Bear Impact Statement Re: Impact Statement Response: Socio-Economic, Infrastructure and Regional Capacity Considerations - Great Bear Gold Project The Great Bear Gold Project Impact Statement presents a comprehensive overview of the proposed project, including anticipated economic benefits, environmental mitigation measures, Indigenous engagement activities, and community investment initiatives. The document clearly demonstrates significant effort toward consultation, environmental baseline work, and incorporation of Indigenous knowledge into the assessment process. However, while the Impact Statement provides substantial technical details regarding the mine footprint and environmental mitigation measures, many of the most significant operational, social, and reputational risks associated with the Project are likely to emerge not from the direct mine footprint itself, but rather from broader regional and cumulative socio-economic pressures. These include: • Regional labour competition • Housing availability and affordability • Community expectations regarding benefits • Municipal infrastructure and service strain • Long-term relationship management with Indigenous Nations and local governments The current impact statement appears to lack ...

Report

Attachment Ministry of Natural Resources (MNR) Provincial Authority Advice Record - Great Bear Gold Project Impact Statement

  • Great Bear Gold Project
  • Author: Administrator on behalf of Ministry of Natural Resources
  • Reference number: 103
  • Submitted: 2026-05-27 - 10:52 AM
  • See the attached submission / Veuillez consulter la pièce jointe  
  • Attachment included
  • Enclosure 1: Provincial Authority Advice Record – Great Bear Gold Project Impact Statement (Batch 3) Please submit the completed form by May 29, 2026 via email at GreatBear@iaac-aeic.gc.ca. Ministry or Organization Contact Information Submission Date May 29, 2026 Ministry/Organization Ministry of Natural Resources Lead Contact, Title, Work Unit Hailey Heyens, Regional Planner, LUPSIS Email, Phone Hailey.Heyens@ontario.ca, 807-324-0156 Alternate Contact, Title, Work Unit Catherine Dashnay, Resource Development Planning Coordinator, LUPSIS Email, Phone Catherine.Dashnay@ontario.ca, 807-220-2384 1. Taking into account the Project Context and Targeted Questions that IAAC has shared, review Batch 3 of the Impact Statement and provide views for IAAC’s consideration in the analysis of the project’s effects and preparation of the Impact Assessment Report (Table 1) or identify potential outstanding information requirements in the Impact Statement (Table 2). You may also wish to provide IAAC with advice to the proponent to support regulatory efficiency (Table 3). Tables 1, 2 and 3 (attached) provide additional guidance to support your review. 2. As per the Cooperation Plan1, consider all the mechanisms in place to manage potential federal effects. If your ministry is responsible for, or aware of, any relevant provincial regulatory, policy or other instruments and measures (i.e. complementary measures2) that may help manage the project’s potential adverse federal effects, please specify and describe applicability to the project and any known limitations to managing effects. Hailey Heyens Name of Ministry / Organization Responder Regional Planner Title ...

Report

Attachment Northwest Training and Adjustment Board Letter of Support and Workforce Planning Considerations

  • Great Bear Gold Project
  • Author: Northwest Training and Adjustment Board
  • Reference number: 95
  • Submitted: 2026-05-19 - 3:38 PM
  • Project phase: Impact Statement
  • Participation notice: Public notice - Comments invited on the summary of the Impact Statement
  • Please find attached the Northwest Training and Adjustment Board’s letter of support for the Great Bear Gold Project. NTAB recognizes the project’s potential economic and workforce impacts for Northwestern Ontario and looks forward to continued engagement with Kinross Gold as planning and development move forward.
  • Attachment included
  • www.ntab.on.ca Northwest Training and Adjustment Board 113-100 Casimir Avenue Dryden • Ontario • P8N 3L4 Tel: 807.223.3813 May 19, 2026 Impact Assessment Agency of Canada 55 York Street, 6th Floor Toronto, Ontario M5J 1R7 Telephone: 416-952-1576 Email: GreatBear@iaac-aeic.gc.ca Dear Sir or Madam, SUBJECT: GREAT BEAR GOLD PROJECT On behalf of the Northwest Training and Adjustment Board (NTAB), I am pleased to express our support for the advancement of the Great Bear Gold Project, owned by Kinross Gold Corporation. NTAB recognizes the significant economic and workforce opportunities this project may create for Northwestern Ontario through employment, skills development, and regional business growth. We also appreciate the project’s ongoing engagement with Indigenous communities, municipalities, training partners, and regional stakeholders. As the Project advances, continued coordination around workforce availability, training alignment, and regional service capacity will be important to supporting long-term success and maximizing local benefit. NTAB looks forward to continued collaboration in supporting regional workforce planning and labour market development related to the Project. We are pleased to provide this letter of support and look forward to continued engagement with Kinross Gold and the Great Bear Gold Project. Sincerely, Afreen Shabbir, Junior Executive Director mailto:GreatBear@iaac-aeic.gc.ca?subject=CIAR%2C%20Information%20Request

Report

Attachment Pakwash Lake Owners Association, Formal Stakeholder Impact Submission addition

  • Great Bear Gold Project
  • Author: Pakwash Lake Camp
  • Reference number: 93
  • Submitted: 2026-05-11 - 11:53 AM
  • Project phase: Impact Statement
  • Participation notice: Public notice - Comments invited on the summary of the Impact Statement
  • The concerns from mining operations of the water/ecosystem. There is one other major concern that I would  like to add to our previous submittion; that is controle and monitor ammonium nitrate entering the discharge water from spilled/wasted/undetonated explosives used in mining (ammonium nitrate is a major component of most blasting agents).  I am aware from my time in the mining industry that this is a potential significant issue if not adequately addressed. Ammonium nitrate (NH4NO3) dissolves rapidly in water, releasing ammonium (NH4+) and nitrate (NO3-) ions. While nitrate is relatively safe, elevated ammonium levels, especially at high pH and temperature, are highly toxic to fish, causing gill damage, respiratory distress, and death. High levels can lead to rapid mortality, often causing "brown blood disease" or severe gill damage. Effects on Fish and Aquatic Life Ammonium/Ammonia Toxicity: The "ammonium" component is highly pH-dependent. At higher pH (alkaline) and temperatures, ammonium (NH4+) converts to ammonia (NH3), which is significantly more toxic. Ammonia causes tissue damage, particularly to gills, leading to difficulty breathing, listlessness, and potential death. Nitrate Toxicity: While less toxic than ammonia, high nitrate concentrations ((NO3-) from blasting compound wastage can stress fish, causing poor growth, weakened immune systems, and long-term health issues. Fish Kill Symptoms: Fish affected by ...

Report

Attachment Pakwash Lake Owners Association, Formal Stakeholder Impact Submission

  • Great Bear Gold Project
  • Author: Pakwash Lake Camp
  • Reference number: 92
  • Submitted: 2026-05-11 - 11:30 AM
  • Project phase: Impact Statement
  • Participation notice: Public notice - Comments invited on the summary of the Impact Statement
  •   FORMAL STAKEHOLDER IMPACT SUBMISSION DATE: May 11, 2026 TO: Impact Assessment Agency of Canada (GreatBear@iaac-aeic.gc.ca (mailto:GreatBear@iaac-aeic.gc.ca)) RE: Project 85832 – Great Bear Project – Formal Stakeholder Impact Statement FROM: Kim Budweg, Owner, Pakwash Lake Camp; Representative, Pakwash Lake Owners Association SUBJECT: Stakeholder Submission – Environmental Protection, Monitoring, and Enforceable Thresholds INTRODUCTION As a primary downstream stakeholder, I am submitting this response regarding the proposed Great Bear Project and its potential effects on the Pakwash Lake–Chukuni River watershed and the regional tourism economy. Having reviewed the Impact Statement, I acknowledge that it generally addresses several core requirements under the Impact Assessment Act, including: · Identification of valued ecosystem components · Description of potential pathways of environmental effects · Consideration of mitigation measures · Assessment of cumulative effects These elements appear to have been developed through consultation and technical study. However, the effectiveness of the proposed mitigation measures is fundamentally dependent on robust monitoring, transparent reporting, and enforceable thresholds tied to clear ...

Report

Attachment GBG Comment Brief

  • Great Bear Gold Project
  • Author: ParadigmForge AI Inc.
  • Reference number: 91
  • Submitted: 2026-04-28 - 6:19 PM
  • Project phase: Impact Statement
  • Participation notice: Public notice - Comments invited on the summary of the Impact Statement
  • Cover Letter — Comments on the Summary of the Impact Statement, Great Bear Gold Project To: Impact Assessment Agency of Canada Re: Great Bear Gold Project — IAAC Registry Project #85832 Consultation closing: 2026-05-29, 23:59 ET Submitter: ParadigmForge AI Inc. Submission date: 4/28/2026 To the Impact Assessment Agency of Canada, ParadigmForge AI Inc. respectfully submits the attached comment brief on the summary of the proponent’s Impact Statement for the Great Bear Gold Project, published April 14, 2026 on the Canadian Impact Assessment Registry. The brief is filed under ParadigmForge’s own name, from ParadigmForge’s own chair, as a non-Indigenous Canadian regulatory-intelligence company participating in the public record of this proceeding in its institutional capacity. Nothing in this submission purports to speak for any First Nation, Métis community, Indigenous governing body, or rights-holder; the named rights-holder communities in this assessment — Asubpeeschoseewagong Netum Anishinabek (Grassy Narrows First Nation), Lac Seul First Nation, Wabauskang First Nation, the Métis Nation of Ontario (Region 1), and Grand Council Treaty #3 — remain the only authoritative voices on the nature, scope, and impact of their own rights, on the content of their own communications to the Crown, and on the adequacy, as a matter between rights-holder and Crown, of the Crown’s conduct toward them. The posture under which this brief enters the record. ParadigmForge’s position is that Canadian ...
  • Attachment included
  • Comments on the Summary of the Impact Statement — Great Bear Gold Project Filed with: Impact Assessment Agency of Canada Project: Great Bear Gold Project (Kinross Gold Corporation) IAAC Registry: Project #85832 Proponent: Kinross Gold Corporation Location: 23 km southeast of Red Lake, Ontario (Treaty 3 territory) Comment period closes: 2026-05-29, 23:59 ET Submitted by: ParadigmForge AI Inc. Submission date: [to be inserted] Institutional posture declaration This submission is filed under the ParadigmForge Submission Protocol, the operational expression of the Living Processes Doctrine adopted by ParadigmForge AI Inc. in April 2026. Every regulatory, quantitative, or structural claim in this submission carries a section-level citation to the primary source with effective date; every claim resolves, through ParadigmForge’s provenance architecture, to the specific retrieved evidence chunk that supports it; every submission is stress-tested through a fifty-two-indicator adversarial validation suite and a cross-jurisdictional conflict detector before entering the record. The chair from which this submission is made — what this submission purports to do, and what it does not purport to do — is declared in the positioning section that follows; readers on files where the chair is particularly sensitive are asked to read the positioning section before the substantive content. The full Protocol is published at paradigmforge.ai/doctrine/protocol and the Doctrine it realises at paradigmforge.ai/doctrine; a reader who wishes to verify this submission’s compliance with either can do so through the published reference documents. Section 0 — Analytical Methodology The four ...

Report

Attachment Concerns with the Great Bear Resources Gold Project

  • Great Bear Gold Project
  • Author: Ayicia Nabigon
  • Reference number: 90
  • Submitted: 2026-04-16 - 11:02 PM
  • Project phase: Impact Statement
  • Participation notice: Public notice - Comments invited on the summary of the Impact Statement
  • As a resident of northern Ontario, I have too often experienced and seen the harmful effects of gold mining in our home. I have several concerns with the impact statement that I would like to highlight.  In section 3.4 of the document, the company states that they gave presentations to Lac Seul First Nation, Asubpeeschoseewagong Netum Anishnabek, Waubaskang First Nation, and the Northwestern Ontario Metis Community about "potential health effects to Indigenous people" and hosted workshops related to "fish habitat offsetting, Species at Risk, mine closure scenarios, and effects assessment". In presentations to Government Agencies, the company shared presentations on "migratory birds, water management, aquatic effects and fish and fish habitat offset measures, and also included methylmercury bioaccumulation modelling in fish and consumption of fish by Indigenous people. I have concerns about whether the information shared with government agencies was the same information that was shared with Indigenous communities. While the company engaged in Traditional Use and Knowledge consultation with communities, where concerns including health of fish, methyl-mercury contamination, and water protection were raised, they do not include the details about whether these topics (that were presented to government agencies) were shared in detail with the affected communities. The maps in Section 5 do not show the position of the mine in relation to the larger watershed of the region. The maps are not detailed enough to see how the tailings facility(ies) may impact the surrounding waterways, and is not detailed enough to give communities a sense of areas that could be ...

Report

Attachment Comments on the Great Bear Gold Project from Sante Enviro Health – February 20, 2026

  • Great Bear Gold Project
  • Author: Sante Enviro Health Inc.
  • Reference number: 83
  • Submitted: 2026-02-20 - 11:08 AM
  • Project phase: Impact Statement
  • Please see attachments for Comments on Great Bear Gold Project from Sante Enviro Health Inc.
  • Attachment included
  • Sante Enviro Health Inc. Pa ge 1 Comments on the Great Bear Gold Project from Sante Enviro Health – February 20, 2026 In the last few years in Canada, the increase of wildfires, specifically in these remote areas, in scope and length of the wildfire season and intensity of fires, time of the season, makes it a very high priority for emergency preparedness. Access for firefighters, or any kind of emergency response team, requires adept planning, and should be an integral part of any mining operation. Outreach to those most directly impacted and involved with emergency preparedness systems must be done in advance, akin to fire drills, to better prepare all involved, not just the first responders. This planning takes place at all three levels of government, federal, provincial and municipal. Coordination is imperative to have a smooth and effective response for any given emergency. For Kinross as well, any unimagined consequences of a flood or wildfire on their mining territory could be catastrophic. A flood or wildfire may be an event that is not that frequent but if it occurs its consequences would be catastrophic, particularly if not planned for appropriately. Therefore imagined scenarios would be the best approach in these changing climatic conditions. To add to the requirements that must be provided by the proponent: Requesting descriptions and risk assessments that consider multiple scenarios is essential but providing the underlying methods of how their assessments were done, with ensuing results, and with explanation of how they arrived at their modelling results would be important. How and why the proponent chose their method should also be ascertained. Sante Enviro Health ...
  • Attachment included
  • As of 2023, Kinross was still doing surface exploration drilling at the Great Bear Gold site. From 2017 to the end of 2022, the site had 1167 borehole drilled totaling more than 560 km in length. Table 1 below summarises the drilling activities at the site since 2017. . Table 1 Ref: Kinross Gold Corporation Great Bear Gold Project Ontario, Canada NI 43-101 Technical Report Effective Date: December 31, 2022 Issue Date: February 13, 2023 Google Earth satellite imagery (Figure1) taken from a scene over the Great Bear site in September 2023 shows a mosaic of drill pads. Diamond-bit core drilling at these pads have generated drilling muds that contain lubricants, water and rock cuttings from deep geological horizons. An example of drilling mud deposit on at least one drill pad at the Great Bear site is shown figure 2. This picture was taken in July 2021, consulting company for Kinross, AGP Mining Consultants. Fig. 2 Source: AGP (2021) Figure 12-1: Drill hole collars DHZ-060 and 061 (right, Hinge Zone) in Kinross Gold Corporation Great Bear Gold Project Ontario, Canada NI 43-101 Technical Report Effective Date: December 31, 2022 Issue Date: February 13, 2023 Year Company Holes Metres 2017 Great Bear Resources Ltd 9 1,093.00 2018 Great Bear Resources Ltd 70 16,578.60 2019 Great Bear Resources Ltd 164 68,869.00 2020 Great Bear Resources Ltd 192 110,673.50 2021 Great Bear Resources Ltd 305 138,253.10 Jan-Feb 2022 Great Bear Resources Ltd 30 19,616.10 Rest of 2022 Great Bear Resources Ltd 397 206,976.00 tot 1167 562,059.30 Drill mud deposits Fig.1 Visible drill pads at the Great Bear Gold site- Scene dated September 17th ...

Report

Attachment Letters to the Impact Assessment Agency of Canada from the Kinross Gold Corporation, Wabauskang First Nation and Lac Seul First Nation regarding referral of the impact assessment process for the Great Bear Gold Project to a review panel

  • Great Bear Gold Project
  • Author: Administrator on behalf of Kinross Gold Corporation, Wabauskang First Nation and Lac Seul First Nation
  • Reference number: 78
  • Submitted: 2024-09-03 - 6:43 PM
  • Project phase: Impact Statement
  • Participation notice: Public Notice - Public Comments Invited on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce ci-jointe   
  • Attachment included
  • Chief Bill Petiquan Wabauskang First Nation Chief Clifford Bull Lac Seul First Nation <Original signed by> <Original signed by>
  • Attachment included
  • Great Bear Resources Ltd. A Kinross Company 104 Howey Street Red Lake, ON P0V 2M0 www.kinross.com 3 Sept 2024 The Hon. Steven Guilbeault Minister of Environment and Climate Change 200 Sacré-Coeur Boulevard Gatineau QC K1A 0H Impact Assessment Agency of Canada Ontario Region 600-55 York Street Toronto, Ontario MSJ 1R7 Attention: Anjala Puvanathan (Director, Ontario Region) Re: Great Bear Resources Ltd. ("Great Bear") – Great Bear Gold Project ("Project") – Response to Asubpeeschoseewagong Netum Anishinabek ("ANA") Request for Review Panel – Supplemental Comment For the reasons set out in Great Bear letter dated 9 July 2024, Great Bear maintains that a Review Panel is not required for this Project. We understand that Lac Seul First Nation (“LSFN”) and Wabauskang First Nation (“WFN”) have filed or will file a submission in which they also explain that they also do not see a Panel review as necessary. LSFN and WFN explain that they have designed an Anishinaabe-led Assessment (“ALA”) process to complement an Agency-led review of the Great Bear Project, rather than a Panel review. Great Bear has agreed to assist LSFN and WFN on this ALA and will respect the outcome of that review. Great Bear would be pleased to elaborate on any of the points in this letter. Regards, Luke Crosby Great Bear Resources Ltd., A Kinross Gold Company cc. Joseph Fobister, Land Protection Team Lead, Asubpeeschoseewagong Netum Anishinabek Mike Fobister, Land Protection Team Coordinator, Asubpeeschoseewagong Netum Anishinabek Jackie Esmonde, Land Protection Team Legal ...

Report
Date modified: