Port au Port-Stephenville Wind Power and Hydrogen Generation Project

Comment Search Mobile

Comment Search

Skip to filters

50 results

Attachment Designation Request for the Proposed Port au Port-Stephenville Wind Power and Hydrogen Generation Project under the Impact Assessment Act

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of World Energy
  • Reference number: 25
  • Submitted: 2023-10-17
  • Updated: 2023-10-19 - 3:05 PM
  • Rationale: Comment updated for administrative purposes
  •   Please see the attached submission
  • Attachment included
  • ATTACHMENT: July 14, 2023 Federal Authority Advice Record: Designation Request under the IAA Response due by August 3, 2023 Port au Port-Stephenville Wind Power and Hydrogen Generation Project (also known as Project Nujio’qonik) Department/Agency Women and Gender Equality Canada (WAGE) Lead Contact Denise Gareau, Director, GBA Plus Directorate, Research, Data, and Intersectionality (RDI) Branch Full Address 22 Eddy Street, 10th Floor Gatineau, QC J8X 2V6 Email FEGC.EvaluationImpacts-ImpactsAssessment.WAGE@fegc-wage.gc.ca Telephone 819-938-1132 Alternate Departmental Contact Jessica Bialek, A/Senior Analyst, GBA Plus Directorate, Research, Data, and Intersectionality (RDI) Branch Jessica.Bialek@fegc-wage.gc.ca 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? No. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? No. 3. If your department or agency will exercise a power or perform a duty or function under any Act of Parliament in relation to the Project, will it involve public and Indigenous consultation? N/A. 4. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to any potential adverse effects within federal jurisdiction caused by the Project or adverse direct or incidental effects ...

Report

Attachment From World Energy GH2 to the Impact Assessment Agency of Canada re: Projuct Nujio'qonik Presentation Update

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of World Energy
  • Reference number: 8
  • Submitted: 2023-10-13 - 1:51 PM
  • Updated: 2023-10-17 - 2:49 PM
  • Rationale: Comment updated for administrative purposes
  •  Please see the attached submission
  • Attachment included
  • Project Nujio’qonik Harnessing Newfoundland and Labrador’s Wind Energy April 2023 Land Acknowledgment We respectfully acknowledge the land on which we gather as the ancestral homelands of the Beothuk. We also acknowledge the island of Newfoundland as the unceded, traditional territory of the Beothuk and the Mi'kmaq. We recognize all First Peoples who were here before us, those who live with us now, and the seven generations to come. • Project intro • Project milestones and timeline • Project design • Wind farms • Transmission • Infrastructure • Plant • Port • Environmental Assessment • Q&A Agenda Project intro Project Nujio’qonik • Project Nujio’qonik aims to be Canada’s first commercial green hydrogen/ammonia producer created from 3+ GW of renewable electricity through wind projects. The Mi’kmaw name for Bay St. George is Nujio’qonik. Pronounced ‘new-geo-ho-neek,’ it means ‘where the sand blows.’ Hydrogen Plant 6 7 8 • Onshore wind speeds: 9.7-11.4 • Deepwater port • Industrial water supply • Former industrial site for plant • Existing transmission corridors • Community support and partnerships Why Our West Coast? Stakeholder Engagement & Regional Economic Benefits • MOUs and partnerships • Community Office • Community Vibrancy Fund • Tax Revenues (regional & provincial) • Employment opportunities • Paid training opportunities • Significant increase in economic activity and spinoff Fund Management Project Areas Community Vibrancy Fund • $10 million Community Vibrancy Fund for the construction phase of three project areas • To be paid over three years, and equally divided across the project areas, commencing with construction. • ...

Report

Attachment SJCNL Letter

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of From the Social Justice Co-operative of Newfoundland and Labrador to the Minister of Environment and Climate Change re: Letter of Support for the Request to Designate the Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Reference number: 11
  • Submitted: 2023-09-29 - 5:27 PM
  • Updated: 2023-10-17 - 2:53 PM
  • Rationale: Comment updated for administrative purposes
  •  Please see the attached submission
  • Attachment included
  • Social Justice Co-operative of Newfoundland and Labrador P.O. Box 7283, St. John’s, NL A1E 3Y5 www.sjcnl.ca July 20, 2023 Hon. Steven Guilbeault (Steven.Guilbert@parl.gc.ca) Minister of Environment and Climate Change 200 Sacre-Coeur Boulevard Gatineau, QC, K1A 0H3 and Impact Assessment Agency of Canada Atlantic Region (atlanticregion-regiondelatlantique@iaac-aeic.gc.ca) 301-10 Barter’s Hill, St. John’s, NL, A1C 6M1 Headquarters 22nd Floor, 160 Elgin Street Ottawa, ON, K1A 0H3 Dear Minister Guilbeault, Re: Request for Designation under the Impact Assessment Act (IAA) with respect to the Port au Port Wind Power and Hydrogen Generation Project (Nujio’qonik GH2; World Energy GH2) Newfoundland and Labrador, submitted by the Environmental Transparency Committee (ETC) of the Port au Port Peninsula, NL. The project has been registered for the provincial Environmental Assessment process, Project # 2202. The Social Justice Co-operative NL (SJCNL) agrees that the above named activity should indeed require a federal Impact Assessment under the Impact Assessment Act and fully supports the local Environmental Transparency Committee (ETC) in its request for expedited designation as such. The Social Justice Co-operative NL (SJC) is a volunteer-led, member-owned, non-profit co-operative working to address issues of social, economic, and political inequality. Our vision is to reclaim care as a mechanism for building a just society, which includes an end to patriarchy, white supremacy, colonialism, imperialism, climate change, and our corrupt capitalist system. Our volunteers work within community as educators who speak to the structural causes of social injustice, as citizens who initiate and support social justice campaigns, ...

Report

Attachment From Centre for Long-term Environmental Action in Newfoundland to the Minister of Environment and Climate Change re: Letter of Support for the Request to Designate the Port au Port-Stephenville Wind Power and Hydrogen Generation Project

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of Linda Whalen
  • Reference number: 13
  • Submitted: 2023-09-29 - 11:25 AM
  • Updated: 2023-10-19 - 3:12 PM
  • Rationale: Comment updated for administrative purposes
  •   Please see the attached submission
  • Attachment included
  • 1 CLEANNL Est. 1992 Inc. 1996 11 May 2023 Hon. Steven Guilbeault (Steven.Guilbert@parl.gc.ca) Minister of Environment and Climate Change 200 Sacre-Coeur Boulevard Gatineau, QC, K1A 0H3 and Impact Assessment Agency of Canada Atlantic Region (atlanticregion-regiondelatlantique@iaac-aeic.gc.ca) 301-10 Barter’s Hill, St. John’s, NL, A1C 6M1 Headquarters 22nd Floor, 160 Elgin Street Ottawa, ON, K1A 0H3 Dear Minister Guilbeault, Re: Request for Designation under the Impact Assessment Act (IAA) with respect to the Port au Port Wind Power and Hydrogen Generation Project (Nujio’qonik GH2; World Energy GH2) Newfoundland and Labrador, submitted by the Environmental Transparency Committee (ETC) of the Port au Port Peninsula, NL. The project has been registered for the provincial Environmental Assessment process, Project # 2202. The Centre for Long-term Environmental Action in Newfoundland and Labrador (CLEANNL) agrees that the above named activity should indeed require a federal Impact Assessment under the Impact Assessment Act and fully supports the local Environmental Transparency Committee (ETC) in its request for expedited designation as such. We would seek an opportunity to participate in the federal IA process in keeping with our function as a community-based volunteer non-governmental organization that serves as a resource for environmental action in the province of Newfoundland and Labrador. 1 Centre for Long-term Environmental Action in Newfoundland and Labrador (CLEANNL) 34 Rennie’s Mill Road St. John’s NL A1C 3P8 mailto:atlanticregion-regiondelatlantique@iaac-aeic.gc.ca CLEANNL’S primary purpose since its establishment in 1992 has been to support local ...

Report

Attachment Administrator on behalf of Linda Whalen

2023-09-29 11:25
  • Reference number: 13
  • From: Linda Whalen Sent: Thursday, May 11, 2023 6:51:06 PM To: Ministre / Minister (ECCC) Subject: Letter of Support for IA Designation Request sent by Environmental Transparency Committee Sensitivity: Normal Attachments: IASupportLetterCLEANNL.docx ; You don't often get email from cleannl92@gmail.com. Learn why this is important Dear Minister and colleagues, Please see attached Letter of Support. Many thanks Linda Whalen for CLEANNL Board of Directors -- LD Sheppard Whalen, PhD President and CEO Centre for Long-term Environmental Action in Nf/Ld St. John's, NL A1C 3P8 mailto:cleannl92@gmail.com mailto:ministre-minister@ec.gc.ca https://aka.ms/LearnAboutSenderIdentification 1 CLEANNL Est. 1992 Inc. 1996 11 May 2023 Hon. Steven Guilbeault (Steven.Guilbert@parl.gc.ca) Minister of Environment and Climate Change 200 Sacre-Coeur Boulevard Gatineau, QC, K1A 0H3 and Impact Assessment Agency of Canada Atlantic Region (atlanticregion-regiondelatlantique@iaac-aeic.gc.ca) 301-10 Barter’s Hill, St. John’s, NL, A1C 6M1 Headquarters 22nd Floor, 160 Elgin Street Ottawa, ON, K1A 0H3 Dear Minister Guilbeault, Re: Request for Designation under the Impact Assessment Act (IAA) with respect to the Port au Port Wind Power and Hydrogen Generation Project (Nujio’qonik GH2; World Energy GH2) Newfoundland and Labrador, submitted by the Environmental Transparency Committee (ETC) of the Port au Port Peninsula, NL. The project has been registered for the provincial Environmental Assessment process, Project # 2202. The Centre for Long-term Environmental Action in Newfoundland and Labrador (CLEANNL) agrees that the above named activity should indeed require a federal Impact Assessment under the Impact ...

Report

Attachment From World Energy GH2 to the Impact Assessment Agency of Canada re: Projuct Nujio'qonik Presentation

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of World Energy
  • Reference number: 15
  • Submitted: 2023-09-29 - 11:09 AM
  • Updated: 2023-10-17 - 3:07 PM
  • Rationale: Comment updated for administrative purposes
  •   Please see the attached submission
  • Attachment included
  • Project Nujio'qonik Progress Update April 20, 2023 • Crown Lands bid • Evaluating EA Guidance for Onshore Wind Energy Generation and Green Hydrogen Production • Northland • Ongoing regulatory consultations on specific guideline requirements • MET Campaign • Schedule pressure Friend-sourcing Reliable Clean Energy “The Government of Canada is building relationships with key countries that are "going to create economic opportunities for Canadian businesses, like hydrogen on the east coast of Canada where we are looking to start shipping hydrogen to Germany by 2025.” - Jonathan Wilkinson, Minister of Natural Resources, Government of Canada G7 in Japan: April 2023 Freeland & EnergyNL Full Project Site Overview 7 Port au Port Infrastructure • 139-164 WTGs ( 6.1-7.2MW ) • Preliminary circuiting ( 34.5kV ) • Added / updated preliminary road / collector and transmission routing • Changed isthmus crossing to subsea cable vs duct bank – significantly eliminating congestion south of Port au Port • Update layout to removed WTGs and roads withing PPWS • Marine Landing Sites added for WTG logistics ( avoid congestion ) Changes / Updates 8 Port au Port • Avoids PPWS area • All within nominated areas 9 Port au Port – Subsea Cable • ~6km in length • Trenched 10 Previous Codroy Infrastructure • 139-164 WTGs ( 6.1-7.2MW ) • Preliminary circuiting ( 34.5kV ) • Added / updated preliminary road / collector and transmission routing • Update layout to removed WTGs and roads withing PPWS Changes / Updates 11 Project Location EIS Project Boundary 12 Active Sensor Summary – Port au Port 13 Overview of Activities in the Marine ...

Report

Attachment From World Energy GH2 to the Impact Assessment Agency of Canada re: Information for Designation Request

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of World Energy
  • Reference number: 16
  • Submitted: 2023-09-29 - 11:03 AM
  • Updated: 2023-10-19 - 2:31 PM
  • Rationale: Comment updated for administrative purposes
  •   Please see the attached submission
  • Attachment included
  • World Energy GH2 Inc. 87 Water St. St. John’s, NL A1C 1A5 May 19, 2023 Lauchie MacLean Project Manager, Atlantic Region Impact Assessment Agency of Canada lachlan.maclean@iaac-aeic.gc.ca Dear Mr. MacLean, Thank you for your letter of May 12, 2023, regarding a designation request for the Port au Port-Stephenville Wind Power and Hydrogen Generation Project, Newfoundland and Labrador. In your letter, you asked for further information in five areas: 1. Key activities and components being proposed and, if applicable, the relationship of the Project to existing infrastructure (e.g., distance to existing infrastructure, use of existing infrastructure); 2. Activities currently underway and estimated timelines for planning, approvals, construction, operation, and decommissioning; 3. A list of known or anticipated regulatory approvals (federal, provincial, municipal, other); 4. World Energy GH2 Inc.’s views regarding whether any of its proposed or potential future activities are described on the Project List; and 5. Any other information World Energy GH2 Inc. is able to provide that may be relevant in the Agency’s review. After a brief update on our project status, this letter addresses each of these below. Project Update Project Nujio’qonik was registered under the Newfoundland and Labrador Environmental Protection Act, SNL 2002 cE-14.2 (the Act) and the Environmental Assessment Regulations, 2003 (the Regulations) on June 21, 2022. After a public review of both the Registration Document and the draft Environmental Impact Statement (EIS) guidelines, final EIS guidelines were issued to World Energy GH2 by the Minister of Environment and Climate Change on December ...

Report

Attachment Sierra Club Canada Foundation supports Request for Designation for Port au Port-Stephenville Wind Power and Hydrogen Generation Project (also known as Project Nujio'qonik)

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of Sierra Club Canada Foundation
  • Reference number: 19
  • Submitted: 2023-08-29 - 8:31 AM
  •   Please see the attached submission
  • Attachment included
  • To: The Honourable Steven Guilbeault Minister of Environment and Climate Change Canada House of Commons Ottawa, ON K1A 0A6 Sent via email to Steven.Guilbeault@parl.gc.ca and Port au Port-Stephenville Wind Power and Hydrogen Generation Project Impact Assessment Agency of Canada 301-10 Barters Hill St. John's, Newfoundland and Labrador A1C 6M1 Telephone: 709-725-2725 Sent via email to: PortAuPort@iaac-aeic.gc.ca August 29, 2023 Re: Sierra Club Canada Foundation supports Request for Designation for Port au Port-Stephenville Wind Power and Hydrogen Generation Project (also known as Project Nujio'qonik) Dear Minister Guilbeault and Officials at the Impact Assessment Agency: Sierra Club Canada Foundation strongly supports the Request for Designation for the Port au Port-Stephenville Wind Power and Hydrogen Generation Project (also known as Project Nujio'qonik), which was sent to you and the Impact Assessment Agency on April 18, 2023 by the Environmental Transparency Committee of Port au Port, NL. Sierra Club Canada Foundation is a national grassroots organization that empowers people to be leaders in protecting, restoring and enjoying healthy and safe ecosystems. We are committed to supporting a movement for positive change in this critical decade for climate and biodiversity, 2020-2030. We champion climate solutions and a rapid transition to clean energy, fight for Sierra Club Canada Foundation – CRA Charity # 11914 9789 RR0001 PO Box 2007 Stn B, Ottawa Ontario K1P 5W3 Tel. (613) 241-4611, Toll Free 1-888-810-4204 scc-admin@sierraclub.ca / www.sierraclub.ca mailto:PortAuPort@iaac-aeic.gc.ca mailto:sccfoundation@sierraclub.ca environmental and social justice, work to protect and restore nature and endangered ...

Report

Attachment For input: Port au Port-Stephenville Wind Power and Hydrogen Generation Project under the Impact Assessment Act

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of Kean Shaw
  • Reference number: 36
  • Submitted: 2023-08-23 - 2:24 PM
  • Hi again,   Peter Curley will be the main contact going forward. He is our Atlantic IA Lead. Peter is cc’d.   I’ve updated our response to your questions, but pls do not consider these final until Monday. I’ve updated my comments in green font:       Has PSPC exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance, or land transfer) that would allow the Project to proceed in whole or in part?   Presently, PSPC has not exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance, or land transfer) that would allow the Project to proceed in whole or in part.   Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? (e.g. land transfer). If so, name the type of authorization and associated Act and identify whether it would involve public/indigenous consultation?   PSPC may be asked to take a course of action such as a lease of land. Where there is no formal agreement in place and solely preliminary discussions have been had to date, a need for public/indigenous consultation has not yet been considered. It should be noted that PSPC leases land to other Federal Departments at this site and thus may require a level of consultation with them.   Is your department participating in the provincial ...

Report

Attachment From the Province of Newfoundland and Labrador to the Impact Assessment Agency of Canada re: Information for the Designation Request of the Port au Port-Stephenville Wind Power and Hydrogen Generation Project

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of Department of Environment and Climate Change
  • Reference number: 29
  • Submitted: 2023-08-18 - 4:15 PM
  • Updated: 2023-10-17 - 2:46 PM
  • Rationale: Comment updated for administrative purposes
  • Please see the attached submission. 
  • Attachment included
  • 1 COR-2023-2482-5 Request for Information Please note that the Department of Environment and Climate Change anticipates posting the environmental impact statement for EA 2202 – Port au Port- Stephenville Wind Power and Hydrogen Generation Project (Project Nujio’qonik GH2) and commencing the public and technical review during the week of August 21, 2023. Project information will be posted on the Department’s web page at https://www.gov.nl.ca/ecc/projects/2202-2/ . Request received from: Impact Assessment Agency of Canada (IAAC) Request received on: July 14, 2023 Subject: Request regarding Registration 2202 – Port au Port-Stephenville Wind Power and Hydrogen Generation Project (Project Nujio’qonik GH2) Stated purpose of request: “On April 18, 2023, the Minister of Environment and Climate Change Canada received a request to designate the proposed Project Nujio’gonik (the physical activities referred to as the Project) under subsection 9(1) of the Impact Assessment Act (the IAA).” Response: Ministry Department of Environment and Climate Change, Environmental Assessment Division Lead Contact Eric Watton Senior Environmental Scientist Full Address P.O. Box 8700, Confederation Building, St. John’s NL A1B 0E6 Email ericwatton@gov.nl.ca Telephone (709) 729-0834 Alternate Ministry Contacts John Reynolds Manager of Wind Projects, Compliance and Monitoring johnreynolds@gov.nl.ca (709) 729-0090 Joanne Sweeney Director of Environmental Assessment joannesweeney@gov.nl.ca (709)729-0673 https://www.gov.nl.ca/ecc/projects/2202-2/ mailto:ericwatton@gov.nl.ca mailto:johnreynolds@gov.nl.ca mailto:joannesweeney@gov.nl.ca 2 1. In general terms, please ...

Report

Attachment Designation Request for the Proposed Port au Port-Stephenville Wind Power and Hydrogen Generation Project under the Impact Assessment Act

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of Crown Indigenous Relations and Northern Affairs Canada
  • Reference number: 24
  • Submitted: 2023-08-11 - 3:06 PM
  •   Please see the attached submission
  • Attachment included
  • GCDOCS # 115975172 ATTACHMENT: July 14, 2023 Federal Authority Advice Record: Designation Request under the IAA Response due by August 3, 2023 Port au Port-Stephenville Wind Power and Hydrogen Generation Project (also known as Project Nujio’qonik) Department/Agency Crown Indigenous Relations and Northern Affairs Canada Lead Contact James Neary Full Address 25 Eddy Street, 6th Floor Gatineau, Quebec K1A 0H4 Canada Email james.neary@rcaanc-cirnac.gc.ca Telephone (613) 355-7285 Alternate Departmental Contact Michael Rowan (Michael.rowan@rcaanc-cirnac.gc.ca) and Jessica Steffano (Jessica.Steffano@rcaanc-cirnac.gc.ca) 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? It is unlikely that CIRNAC will exercise a power or perform a duty or function related to the proposed Project that will enable it to proceed. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? Not probable. 3. If your department or agency will exercise a power or perform a duty or function under any Act of Parliament in relation to the Project, will it involve public and Indigenous consultation? CIRNAC will not exercise a power or perform a duty or function under any Act of Parliament in relation to the proposed Project that will involve public and Indigenous consultation. However, CIRNAC ...

Report

Attachment From Environment and Climate Change Canada - Federal Authority Advice Record for the Designation Request of the Port au Port-Stephenville Wind Power and Hydrogen Generation Project

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of Environment and Climate Change Canada
  • Reference number: 31
  • Submitted: 2023-08-11 - 12:34 PM
  • Please see the attached submission. 
  • Attachment included
  • ATTACHMENT: July 14, 2023 Federal Authority Advice Record: Designation Request under the IAA Response due by August 3, 2023 Port au Port-Stephenville Wind Power and Hydrogen Generation Project (also known as Project Nujio’qonik) Department/Agency Environment and Climate Change Canada (ECCC) Lead Contact Michael Hingston Full Address 16th Floor Queen Square, 45 Alderney Drive, Dartmouth, NS B2Y2N6 Email Michael.hingston@ec.gc.ca Telephone (902) 225-3534 Alternate Departmental Contact Jerry Pulchan 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? No Specify as appropriate. ECCC has not considered, exercised a power or performed a duty, or taken any course of action as part of the Project. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? Yes If yes, specify that power, duty or function and its legislative source . Please note the following requirements that may apply to this project: Species at Risk Act permits For species listed in Schedule 1 of the Species at Risk Act (SARA) 2002 as Extirpated, Endangered or Threatened, a permit may be required from ECCC (section 73 of SARA) for activities that affect a listed terrestrial wildlife species, any part of its critical habitat, or the residences of its individuals, where those prohibitions are in place. Such ...

Report

Attachment Designation Request for the Proposed Port au Port-Stephenville Wind Power and Hydrogen Generation Project under the Impact Assessment Act

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of Transport Canada
  • Reference number: 28
  • Submitted: 2023-08-10 - 2:44 PM
  •   Please see the attached submission
  • Attachment included
  • UNCLASSIFIED / NON CLASSIFIÉ ATTACHMENT: July 14, 2023 Federal Authority Advice Record: Designation Request under the IAA Response due by August 3, 2023 Port au Port-Stephenville Wind Power and Hydrogen Generation Project (also known as Project Nujio’qonik) Department/Agency Transport Canada Lead Contact Jason Flanagan, Senior Environmental Advisor Full Address Heritage Court, 6th floor-95 Foundry Street, Moncton, NB E1C 5H7 Email jason.flanagan@tc.gc.ca Telephone 506-227-8257 Alternate Departmental Contact Melissa Ginn, Regional Environmental Advisor Melissa.ginn@tc.gc.ca / 709-351-3200 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Transport Canada has not exercised a power or performed a duty or function under any Act of Parliament in relation to this project. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? Canadian Navigable Water Act (CNWA) Approval: The proposed marine based elements of the project, including but not limited to the proposed improvements to the existing dock at the Port of Stephenville, a jettyless mooring and loading system, dredging, a marine outfall, a marine cable and two temporary marine landing sites may require a Canadian Navigable Waters Act approval(s). The application process can be accessed at the following link: External ...

Report

Attachment From Natural Resources Canada - Federal Authority Advice Record for the Designation Request of the Port au Port-Stephenville Wind Power and Hydrogen Generation Project

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of Natural Resources Canada
  • Reference number: 32
  • Submitted: 2023-08-03 - 2:52 PM
  • Please se the attached submission. 
  • Attachment included
  • UNCLASSIFIED - NON CLASSIFIÉ 3 August, 2023 Karen Lalonde, Project Manager, Atlantic Region Impact Assessment Agency of Canada Karen.Lalonde@iaac-aeic.gc.ca SENT VIA EMAIL Subject: Natural Resources Canada Submission of the Federal Authority Advice Record for the Designation Request of the Proposed Port au Port-Stephenville Wind Power and Hydrogen Generation Project Dear Colleague, On July 14th, 2023, the Impact Assessment Agency of Canada (the Agency) requested that Natural Resources Canada (NRCan) provide input regarding the request for designation under subsection 9(1) of the Impact Assessment Act for the proposed proposed Port au Port- Stephenville Wind Power and Hydrogen Generation Project (the Project). NRCan is responding to this Designation Request pursuant to subsection 13(1) of the Impact Assessment Act. Details of NRCan’s response can be found in the attachment below. If you have any questions, comments, or concerns, please contact me at shelley.ball@nrcan- rncan.gc.ca Sincerely, Shelley Ball Acting Team Lead Office of the Chief Scientist Natural Resources Canada cc: Peter Unger – Director, Office of the Chief Scientist Kathy McPherson – Senior Impact Assessment Officer mailto:Karen.Lalonde@iaac-aeic.gc.ca mailto:shelley.ball@nrcan-rncan.gc.ca mailto:shelley.ball@nrcan-rncan.gc.ca UNCLASSIFIED - NON CLASSIFIÉ ATTACHMENT: July 14, 2023 Federal Authority Advice Record: Designation Request under the IAA Response due by August 3, 2023 Port au Port-Stephenville Wind Power and Hydrogen Generation Project (also known as Project Nujio’qonik) Department/Agency Natural Resources ...

Report

Attachment Port au Port-Stephenville Wind Farm and Hydrogen Generation Project - Designation Request

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of Environmental Health Program
  • Reference number: 30
  • Submitted: 2023-08-03 - 10:06 AM
  •   Please see the attached submission
  • Attachment included
  • Environmental Health Program Regulatory Operations and Enforcement Branch 1505 Barrington Street Halifax, NS B3J EY6 August 03, 2023 Karen Lalonde Project Manager, Atlantic Region Impact Assessment Agency of Canada Sent by email to: Karen.Lalonde@iaac-aeic.gc.ca Subject: Port au Port-Stephenville Wind Power and Hydrogen Generation Project – Request for Federal Expert Advice on Designation Request Dear Karen Lalonde: Thank you for your email dated July 14, 2023, requesting federal expert advice on the Designation Request for the Port au Port-Stephenville Wind Power and Hydrogen Generation Project. Health Canada participates in the impact assessment process as a federal authority under the Impact Assessment Act, upon request. Health Canada makes available specialist/expert information or knowledge in their possession to responsible authorities and review panels, among others. Health Canada does not make decisions or issue licenses, permits, or authorizations in relation to the impact assessment of a development project. Health Canada has provided its comments for your consideration in the attached document. Should you have any questions concerning Health Canada’s comments, please contact Lauchie MacLean (lachlan.maclean@hc-sc.gc.ca). Sincerely, Karine Menezes A/ Regional Manager, EHP – Atlantic ROEB, Health Canada cc: Heather Jones-Otazo, Acting Manager, Environmental Assessment and Contaminated Sites (EACS) Division, Healthy Environments and Consumer Safety Branch (HECSB), Health Canada Lauchie MacLean, Impact Assessment Specialist, EHP, ROEB, Health Canada Aurelia Thevenot, Senior Environmental Health Specialist, EACS, HECSB, Health Canada Matthew ...

Report

Attachment Designation Request for the Proposed Port au Port-Stephenville Wind Power and Hydrogen Generation Project under the Impact Assessment Act

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of Indigenous Services Canada
  • Reference number: 27
  • Submitted: 2023-08-02 - 4:57 AM
  •   Please see the attached submission
  • Attachment included
  • ATTACHMENT: July 14, 2023 Federal Authority Advice Record: Designation Request under the IAA Response due by August 3, 2023 Port au Port-Stephenville Wind Power and Hydrogen Generation Project (also known as Project Nujio’qonik) Department/Agency Indigenous Services Canada Lead Contact Julia Gregory Full Address 10 WELLINGTON ST, Gatineau, Quebec K1A 0H4 LES TERRASSES DE LA CHAUDIÈRE Email SAC.EvaluationImpacts-ImpactsAssessment.ISC@sac-isc.gc.ca Telephone 4388799369 Alternate Departmental Contact Jennifer Burley (ISC-Atlantic Region): jennifer.burley@sac-isc.gc.ca Debra Nkusi (ISC-FNIHB): debra.nkusi@sac-isc.gc.ca 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project ; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? ISC has considered an interest in the Project related to impacts on Indigenous peoples and the rights of Indigenous peoples. ISC has not exercised a power or performed a duty or function under any Act of Parliament in relation to the Project or taken any course of action that would allow the Project to proceed in whole or in part. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? Indigenous Services Canada (ISC) is not responsible for approving or issuing licences, permits or authorizations for the assessments of large, proposed projects 3. If your department or agency will exercise a power ...

Report

Attachment Designation Request for the Proposed Port au Port-Stephenville Wind Power and Hydrogen Generation Project under the Impact Assessment Act

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of Fisheries and Oceans Canada (DFO)
  • Reference number: 22
  • Submitted: 2023-08-01 - 10:55 AM
  •   Please see the attached submission
  • Attachment included
  • ATTACHMENT: July 14, 2023 Federal Authority Advice Record: Designation Request under the IAA Response due by August 3, 2023 Port au Port-Stephenville Wind Power and Hydrogen Generation Project (also known as Project Nujio’qonik) Department/Agency Fisheries and Oceans Canada (DFO) Lead Contact Kimberley Keats, Team Lead, Impact Assessment and Major Projects Full Address Northwest Atlantic Fisheries Centre 80 East White Hills Road PO Box 5667 St. John’s, NL A1C 5X1 Email Kimberley.Keats@dfo-mpo.gc.ca Telephone (709) 699-8883 Alternate Departmental Contact Jason Kelly Jason.Kelly@dfo-mpo.gc.ca (709) 730-2185 Northwest Atlantic Fisheries Centre 80 East White Hills Road PO Box 5667 St. John’s, NL A1C 5X1 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Yes, DFO has an interest in this project; the project has the potential to impact fish and fish habitat. DFO has not exercised a power, performed a duty or function under any Act of Parliament or taken any course of action. DFO has, however, provided advice to the Proponent to avoid or mitigate impacts on fish and fish habitat through two requests for review for access road construction/upgrades on sites (A4 and A5) to install two Meteorological Evaluation Towers (MET) on the Port au Port peninsula. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or ...

Report

Attachment From the Council of Canadians to the Minister of Environment and Climate Change re: Letter of Support for the Request to Designate the Port au Port-Stephenville Wind Power and Hydrogen Generation Project

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of The Council of Canadians
  • Reference number: 21
  • Submitted: 2023-07-24 - 11:31 AM
  • Updated: 2023-10-17 - 3:11 PM
  • Rationale: Comment updated for administrative purposes
  •   Please see the attached submission
  • Attachment included
  • canadians.org inquiries@canadians.org @CanadiansOrg 1-800-387-7177 200-240 BANK STREET OTTAWA, ON K2P 1X4 Hon. Steven Guilbeault Minister of Environment and Climate Change Canada House of Commons Ottawa, ON K1A 0A6 Sent via email to Steven.Guilbeault@parl.gc.ca 20July2023 Dear Minister Guilbeault,      I am writing on behalf of the Council of Canadians to support the Request for Designation from the Environmental Transparency Committee (ETC) for the proposed Project Nujio’qonik GH2 on the Port au Port Peninsula of NL. Our organization overwhelmingly supports renewable energy development, and we know that development needs to be done with people and communities’ interests put first. We understand that the vast majority of people in the communities on and around Port au Port, most of whom are Indigenous, do not support this project as it stands because of the negative impact it poses to the ecosystems and communities on the peninsula. As such, we think it is critical that Nujio’qonik undergo a federal assessment to ensure that it meets the high bar set by Environment and Climate Change Canada.    The Council of Canadians recognizes that wind power is one of the most affordable and reliable renewable energy solutions with which we can address the climate crisis. As we build renewable energy production in Canada, projects that are community-led and -supported, and/or developed and run by the public sector must be the standard. Nujio’qonik is a pet project of billionaires and is likely to be plagued by the same suite of problems that tend to arise with privatized infrastructure, including delays, less job creation than with public projects, excessive cost overruns and ...

Report

Attachment Port au Port-Stephenville Wind Power and Hydrogen Generation Project - request for additional information

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of World Energy
  • Reference number: 17
  • Submitted: 2023-06-26 - 3:06 PM
  • Updated: 2023-10-19 - 3:04 PM
  • Rationale: Comment updated for administrative purposes
  •   Please see the attached submission
  • Attachment included
  • VESSEL PARTICULARS FORM ‘’C’’ Page 1 of 13 ECO FREEZE 22,000m3LPG/NH3/VCM CARRIER - DATE 01/11/2021 Specifications of the vessel and the gas installation which are representations by the Owners. (A) VESSEL’S CHARACTERISTICS PREAMBLE Name : ECO FREEZE Owner : ECOVCM INC. Flag : REBUPLIC OF MARSHALL ISLANDS Build : HYUNDAI MIPO DOCKYARD Date on Service : April 17th2018 Class : LLOYDS REGISTER (LRS), ICE CLASS 1B-FS GRT International : 19,554 tons Suez : 20,465.39 tons (Issued by Class) Panama : 65,976 m3 (Issued by Panama Canal Authority) NRT International : 5,866 tons Suez : 16,547.97 tons (Issued by Class) Panama : 16,329 tons (Issued by Panama Canal Authority) Is vessel build according to USCG regulations? : Yes RINA regulations? : N/A Japanese regulation? : JIS Has vessel received USCG approval? : YES (for foreign vessel in US water) RINA approval? : N/A HULL LOA : 159.87m LOA LBP : 152.00m LBP Breadth : 25.60m Breadth Depth : 17.30m Depth Summer Draft : 11.914m Summer Draft Multiple Draft : N/A Estimated draft with full cargo and full bunkers are as follows. Product Draft Fore(m) Draft Aft(m) Draft Mean(m) Corresponding Deadweight(t) (Only cargo) Propane ( 98%) 9.04 m 9.23 m 9.14 m 12,709 tons NH3 (98%) 9.50 m 10.24 m 9.87 m 14,900 tons VCM (98%) 11.86 m 11.89 m 11.88 m 21,254 tons Propeller immersion : At draft 9.14 m correspond.(Propane cond.) :100.6%(50% Full Immersion) At draft 9.90 m correspond. (NH3 cond.) : 117.7%(50% Full Immersion) At draft 11.88 m correspond. (VCM cond.) : 146.6%(50% Full Immersion) COMMUNICATION EQUIPMENT VESSEL PARTICULARS FORM ‘’C’’ ECO FREEZE 22,000m3LPG/NH3/VCM CARRIER - DATE 01/11/2021 ...
  • Attachment included
  • World Energy GH2 Inc. 87 Water St. St. John’s, NL A1C 1A5 June 26, 2023 Karen Lalonde Project Manager, Atlantic Region Impact Assessment Agency of Canada Karen.Lalonde@iaac-aeic.gc.ca Dear Ms. LaLonde, Thank you for your letter of June 19, 2023, seeking additional information with respect to project components and activities for Project Nujio’qonik (the Project). With respect to marine terminal operations and the applicability of the Physical Activities Regulations, you requested further information on the following: 1. whether the Port of Stephenville is able to accommodate ships greater than 25,000 DWT without expanding the marine terminal; 2. the potential for ships greater than 25,000 DWT to be used for the Project; 3. details about the two temporary marine loading sites; and 4. details about the jettyless offloading system being investigated to minimize port development. Responses 1) The Port of Stephenville routinely accommodates vessels larger than 25,000 DWT using existing infrastructure. Each year, bulk carriers offload road salt, construction supplies, and asphalt, while cargo vessels load scrap metal at the Port. The Port of Stephenville supports local fishing and aquaculture industries as well as Canadian Coast Guard operations. The Port of Stephenville was acquired by World Energy GH2 in May 2023. Routine operations at the Port will continue separately from Project Nujio’qonik. 2) There are no plans for the Project to export ammonia using vessels larger than 25,000 DWT. Please see attached specification sheet for details on vessels being considered for ammonia export. Project components such as wind turbine blades and ...

Report

Attachment Public support for ETC Port au Port designation request - Media coverage

  • Port au Port-Stephenville Wind Power and Hydrogen Generation Project
  • Author: Administrator on behalf of The Council of Canadians
  • Reference number: 20
  • Submitted: 2023-05-12 - 2:19 PM
  •   Please see the attached submission
  • Attachment included
  • www.avaloncouncilofcanadians.weebly.com stjohnscoc@gmail.com May 2, 2023 To: Hon Steven Guilbeault, Minister of Environment and Climate Change Gatineau, QC, K1A 0H3 and Impact Assessment Agency of Canada Ottawa, ON, K1A 0H3 Re: Designation of Project "Nujio'qonik" GH2 for full federal Impact Assessment Dear Minister Guilbeault, We are writing as the Council of Canadians Avalon (NL) Chapter, to support the Request for Designation you have received from the Environmental Transparency Committee and others on the Port au Port Peninsula on Newfoundland's west coast. We strongly support their request for a full Impact Assessment of the proposed Project "Nujio'qonik" GH2, which threatens to irrevocably damage their homeland, and which, whatever the outcome, will be precedent- setting. As citizens of Canada and of Newfoundland and Labrador, we are deeply alarmed by the threats this proposal poses to the vulnerable environment of the Peninsula, and to the Indigenous and non-Indigenous people of the small local communities directly affected. Their position is like that of the canaries in the coal mine – warning us about dangers that we might not otherwise immediately perceive ourselves. In their formal Request for Designation, the people of those affected communities have described in documented detail the potential impacts of this proposed wind-to-hydrogen project. In its first phase, 164 giant offshore-type wind turbines would be crammed onto this small and fragile arrow of land, roughly 1/30th the size of the Greater Toronto Area. From our research into this matter, we have every reason to believe that erecting ...

Date submitted Display filters

Filters

Date modified: