Attachment From Cora Raine to Impact Assessment Agency of Canada - Input on Designation Request for the Baldwin East Aerodrome Project

  • Baldwin East Aerodrome Project
  • Author: Administrator on behalf of Cora Raine
  • Reference number: 19
  • Submitted: 2023-03-10
  • 2023 Mar 10  Impact Assessment Agency of Canada Minister of Environment and Climate Change  Project: Baldwin East Aerodrome Project – IAA Reference 84333 - Sutton Airport Development Ltd - Location: Concession 5, Lot 10 & 11, otherwise known as 7818 and 7486 Old Homestead Road, Pefferlaw, Town of Georgina Please find information and detail in support of a request for an Impact Assessment regarding Baldwin East Aerodrome in Georgina that may be useful to your considerations in the attached pdf. Site alterations, fill dumping and construction has not yet started but may be imminent . A great urgency for an Impact Assessment designation is necessary, if possible.. Your consideration is requested under the IAA amended items 1) Wildlife Areas, 2) Migratory Birds, 4) public concern, and/or 5) at the discretion of the Minister. Please review information presented as it relates to 3) Transport There are matters of public concern considered grave by Mayor and Council of Georgina - Local Land Use Authority, Lake Simcoe Conservation Authority, and the elected York-Simcoe MP, Pefferlaw Area Ratepayers (PAR), Chippewa of Georgina Island, local community members, adjacent registered Agro-Food Producing farm properties, affected property owners with much letter writing and a petition to Parliament underway all at this time – all opposed. Several pages include photo observation documenting the significant wildlife and migratory bird activity photographed in the coastal and local areas taken within 4,000 meter radius zone of concentrated impact surrounding the Baldwin East Aerodrome ...
  • Attachment included
  • 1 https://gazette.gc.ca/rp-pr/p2/2019/2019-08-21/html/sor-dors285-eng.html https://www.canada.ca/en/environment-climate-change/services/environmental-enforcement/acts-regulations/wildlife-area-frequently-asked-questions.html https://www.canada.ca/en/environment-climate-change/services/environmental-enforcement/acts-regulations/wildlife-area-frequently-asked-questions.html https://laws.justice.gc.ca/eng/acts/F-14 https://laws.justice.gc.ca/eng/acts/S-15.3 https://laws.justice.gc.ca/eng/acts/M-7.01 https://laws.justice.gc.ca/eng/acts/M-7.01 https://static1.squarespace.com/static/5e20f34c4be93e7c47a3b815/t/5e7a27b8ddb1ef32f857a88c/1585063864907/20200205-IAA_Airports_Public.pdf https://static1.squarespace.com/static/5e20f34c4be93e7c47a3b815/t/5e7a27b8ddb1ef32f857a88c/1585063864907/20200205-IAA_Airports_Public.pdf 2 https://gazette.gc.ca/rp-pr/p2/2019/2019-08-21/html/sor-dors285-eng.html https://www.canlii.org/en/ca/fct/doc/2021/2021fc819/2021fc819.html 3 Migratory Birds Fish Hatcheries Virginia Hamlet Chippewa FN Lands Significant Wildlife Zephyr Creek Swamp Complex ...

Report

Attachment From Chippewas of Georgina Island First Nation to Impact Assessment Agency of Canada - Input on Designation Request for the Baldwin East Aerodrome Project

  • Baldwin East Aerodrome Project
  • Author: Administrator on behalf of Chippewas of Georgina Island First Nation
  • Reference number: 21
  • Submitted: 2023-03-29
  • Hello Spencer.   Georgina Island First Nation has openly been against this project since it was first introduced. Since this is the first time anyone from the project has reached out to us, your request for input with a due date that has passed is not sufficient consultation. We are constitutionally owed the right to consultation. We have not been provided with any EA’s to review regarding this project, which is also our constitutional right.   The project will have direct impact on our hunting and fishing areas as set out in the William’s Treaty. It will also have a direct effect on Lake Simcoe where our drinking water is taken from. We have been working since before 2017, when the Ministry of Health finally declared a boiling water advisory for our First Nation, to provide safe drinking water to our community.   There are many issues our community has with the project. One major question that keeps coming up; has the company (or another shell company ran by the same people) that plan on building this aerodrome been charged with dumping toxic fill previously? Many people looking into this have found previous charges against these people. Will this be investigated, and will it have any impact on your decisions? We believe that the loophole with the length of the runway length being a few meters too short, should not impact the necessity for full environmental assessments, especially considering this project will be located on and around wetlands that feed directly into Lake Simcoe.     Full and proper Environmental Assessments need to be followed. Permanent soil and water testing stations ...

Report

Attachment From Métis Nation of Ontario (Region 7) to Impact Assessment Agency of Canada - Input on Designation Request for the Baldwin East Aerodrome Project

  • Baldwin East Aerodrome Project
  • Author: Administrator on behalf of Métis Nation of Ontario (Region 7)
  • Reference number: 20
  • Submitted: 2023-03-16
  • Good morning Spencer,   Thank you for the information on the Baldwin East Aerodrome Project, and the offer to meet to go over the designation request process with the Georgian Bay Traditional Territory Consultation Committee (GBTTCC), the Regional Consultation Committee (RCC) for Métis Nation of Ontario Region 7, an Aboriginal rights-bearing community including the Georgian Bay Métis Council, the Great Lakes Métis Council, Barrie South-Simcoe Métis Council and the Moon River Métis Council.  Unfortunately, it appears the RCC does not have availability to meet prior to the deadline you have outlined.   The RCC would, however, like to express that based on the information provided, they believe the project has the potential to impact Métis rights, interest, and way of life. As an Indigenous people, Métis depend on the lands, waters and resources in their traditional territories to exercise their Aboriginal rights and Métis way of life. The MNO takes seriously its participation in the environmental assessment of projects that have the potential to impact Métis rights, and the preservation of the Métis way of life is not just a concern for people living in the region today, but for future generations as well. For these reasons, the GBTTCC would like to see the Baldwin East Aerodrome Project designated under the subsection 9(1) of the Impact Assessment Act (IAA).   Thanks,   Ethan Roy (he/him) Consultation Advisor Lands, Resources, and Consultations (LRC) Branch Métis Nation of Ontario Sault ...

Report

Attachment From Ministry of Envrionment, Conservation and Parks to Impact Assessment Agency of Canada - Provincial Reviewer Advice Record for the Designation Request for the Baldwin East Aerodrome Project

  • Baldwin East Aerodrome Project
  • Author: Administrator on behalf of Ministry of Environment, Conservation and Parks
  • Reference number: 24
  • Submitted: 2023-03-15
  • Please see the attached submission. 
  • Attachment included
  • Enclosure 2 – Provincial Regulator Advice Record – Designation Request under the IAA – Baldwin East Aerodrome Project – Excess Soil Response requested by March 3, 2023 Ministry Ministry of Environment, Conservation and Parks (MECP) Lead Contact Chris Lompart, Manager – Land Use Policy Section, Environmental Policy Branch, Environmental Policy Division (excess soil management policy). Full Address 40 St. Clair Avenue West, 10th Floor, Toronto, ON Email Chris.lompart@ontario.ca Telephone 416 937-8012 Alternate Ministry Contact Mohsen Keyvani, Manager, Waste Approvals, Environmental Permissions Branch, Environmental Assessment and Permissions Division / Mohsen.Keyvani@ontario.ca / 416-432-7253 1. In general terms, please confirm and describe your ministry’s role (if applicable) in the Project. The Ministry of the Environment Conservation and Parks (MECP) sets policy related to waste management. Excess soil, being soil excavated as a result of various projects (e.g., development or infrastructure construction) that is not reused in the project and must be reused or disposed of at other sites, is subject to Ontario Regulation 406/19 – On-Site and Excess Soil Management (“Excess Soil Regulation”) under the Environmental Protection Act, which sets rules and requirements related to the reuse of excess soil. If specified requirements in the Excess Soil Regulation are not met, excess soil would be a waste and subject to waste-related legislation and regulations and the site receiving the excess soil would be considered a waste disposal site and would require the MECP’s environmental approval. Soil reused in accordance with the rules specified in the Excess Soil Regulation is ...
  • Attachment included
  • Enclosure 2 – Provincial Regulator Advice Record – Designation Request under the IAA – Baldwin East Aerodrome Project Response requested by March 31, 2023 Ministry Environment, Conservation and Parks Lead Contact Paul Heeney - Manager Full Address 40 St. Clair Ave W, Toronto ON M4V 1M2 Email Paul.Heeney@ontario.ca Telephone 647-549-7073 Alternate Ministry Contact Nicole Tuyten – Permissions Coordinator – Nicole.Tuyten2@ontario.ca 1. In general terms, please confirm and describe your ministry’s role (if applicable) in the Project. The Species at Risk Branch is responsible for the administration of the Endangered Species Act, 2007 (ESA) and its regulations. Ontario is committed to conserving and protecting species at risk and their habitats and ensuring that the legislation provides stringent protections for species at risk, while continuing to work with stakeholders and Indigenous peoples to improve the effectiveness of the program. The branch’s permissions team: • responds to inquiries regarding ESA authorizations • undertakes technical reviews of permit applications and makes recommendations about decisions to the Minister • works with proponents to navigate the application process (i.e., information gathering, authorization application, authorization drafting, approvals, and implementation). • provides technical input into other government approvals to ensure the Endangered Species Act and species at risk are considered and protected (e.g. environmental assessments, land use planning, aggregate licences) • provides program support for compliance activities including subject matter expertise • builds and maintains relationships with key regulated communities ...
  • Attachment included
  • Enclosure 2 – Provincial Regulator Advice Record – Designation Request under the IAA – Baldwin East Aerodrome Project – Wastewater Response requested by March 3, 2023 Ministry Ministry of Environment, Conservation and Parks (MECP) Lead Contact Fariha Pannu, Manager Industrial and Private Wastewater, Approvals Services Section, Environmental Permissions Branch (only for any future sewage works related approvals). Full Address 135 St. Clair Avenue West, 7th Floor, Toronto, ON Email Fariha.pannu@ontario.ca Telephone 416 892-7604 Alternate Ministry Contact Yuefeng Zhang / yuefeng.zhang@ontario.ca / 437-221-1417 1. In general terms, please confirm and describe your ministry’s role (if applicable) in the Project. MECP’s Environmental Permissions Branch issues sewage works Environmental Compliance Approvals (ECAs) under Ontario Water Resources Act. This project would require an ECA for stormwater management at the site and for management of sanitary sewage if that does not fall under the jurisdiction of the Ontario Building Code. 2. Please provide the contact information of the person or persons responsible for managing your ministry’s oversight of the Project (if different from lead contact above). Fariha Pannu can be the contact for sewage works related aspects of this Project. She holds no responsibility for managing MECP’s oversight of the Project for any other aspects. 3. Describe the provincial policy, legislative or regulatory process or approvals administered by your ministry that may assess or manage the potential adverse effects of the Project (e.g., Ontario Regulation 406/19: On-Site and Excess Soil Management). For each mechanism or approval, ...

Report

Attachment From Neil Harris to Impact Assessment Agency of Canada - Input on Designation Request for the Baldwin East Aerodrome Project

  • Baldwin East Aerodrome Project
  • Author: Administrator on behalf of Neil Harris
  • Reference number: 18
  • Submitted: 2023-03-09
  • From: Neil Harris <Email address removed> Sent: Thursday, March 9, 2023 11:24 AM Cc: Neil Harris <Email address removed> Subject: Proposed Aerodrome in Pefferlaw   I am writing to express my concerns and objections to the aerodrome being proposed in Pefferlaw, which are as follows:   there has been no environmental impact study conducted, nor is there one intended to be conducted, as the project is just under the threshold that would automatically require such a study to be completed. This is very concerning as there is a lot of wildlife in this area, wild turkey, deer, beaver, fox, coyote, etc that will most definitely be impacted by this aerodrome. the amount of fill being brought in is a concern as it cannot help but impact the grading, which will in turn negatively impact the groundwater recharge area and aquifers, not to mention the farms in the area. the fact that the fill will not be tested and could be contaminated, is a major concern, as this will negatively impact the environment, wildlife and residents, as well as farms in the area. How do we trust local produce, meat, etc, with this huge unknown. the number of trucks and the number of years this will require, is very disturbing as the amount of development that has been done over the past few years, which falls within provincial and municipal regulations, has already significantly ...

Report

Attachment From Huron-Wendat Nation to Impact Assessment Agency of Canada - Input on Designation Request for the Baldwin East Aerodrome Project

  • Baldwin East Aerodrome Project
  • Author: Administrator on behalf of Huron-Wendat Nation
  • Reference number: 17
  • Submitted: 2023-03-08
  • Kwe Maurizio,   As discuss with Spencer Roth in the emails below, I am reaching out to you for further information about the next steps for the Archeological Assessments. As mentioned in the Final Summary Report, a Stage 2 will take place and a potential Stage 3. The Huron-Wendat Nation is interested in continuing its participation in the project such as reviewing the Archeological Assessments and participating in the fieldwork. I have c.c’d my colleague Thiefaine Terrier who will be able to coordinate our participation for the next steps of the projet.   Tiawenhk inenh chia’ entïio’ De : DesignationOntario (IAAC/AEIC) <designationontario@iaac-aeic.gc.ca Envoyé : 2 mars 2023 08:39 À : Naomi Leduc <Email address removed> Cc : Dominic Ste-Marie<Email address removed> Objet : RE: Notification and Request for Information – Designation Request for Baldwin East Aerodrome Project - Due March 8, 2023   Good morning Naomi, Thank you for your email. In the May 2022 Summary Report prepared by Sutton Airport Development Inc. (the Proponent) for the Baldwin East Aerodrome Project, section 3.7 describes the Proponent’s findings and recommendations from its Stage 1 Archaeological Assessment from fall of 2021.  Notably, page 33 of the Summary Report (page 38 of the PDF) indicates that the Proponent has been in contact with Marie-Sophie Gendron from Huron-Wendat Nation regarding the findings of the Archaeological Assessment, and page 130 of the PDF indicates that that the Proponent ...

Report

Attachment From Environment and Climate Change Canada to Impact Assessment Agency of Canada - Federal Authority Advice Record for the Designation Request for the Baldwin East Aerodrome Project

  • Baldwin East Aerodrome Project
  • Author: Administrator on behalf of Environment and Climate Change Canada
  • Reference number: 23
  • Submitted: 2023-03-07
  • Please see the attached submissions. 
  • Attachment included
  • www.canada.ca/iaac www.canada.ca/aeic Enclosure 2 – Federal Authority Advice Record – Designation Request under the IAA – Baldwin East Aerodrome Project Response due by March 8, 2023 Department/Agency Environment and Climate Change Canada Lead Contact Dan McDonell, Senior Environmental Assessment Officer Full Address 867 Lakeshore Rd Burlington, ON Email Dan.mcdonell@ec.gc.ca Telephone 905-336-4957 Alternate Departmental Contact Rob Clavering, Manager, Environmental Assessment Section - Ontario 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Specify as appropriate. ECCC has not exercised a power or performed a duty or function under any Act of Parliament in relation to the proposed Baldwin East Aerodrome Project (the Project), nor has ECCC taken any course of action that would allow the Project to proceed in whole or in part. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, please specify that power, duty or function and its legislative source. Depending on the results of future baseline studies, there is the potential that ECCC will be required to exercise a power or perform a duty or function related to the Project to enable it to proceed (e.g., permit pursuant to the Species at Risk Act). 3. If your department or agency will exercise a power or ...
  • Attachment included
  • Baldwin East Aerodrome Project – Designation Request – Agency Questions March 10, 2023 The Agency would like to meet with ECCC (including CWS) as soon as possible to discuss the species at risk indicated in the submission. Specifically, to discuss CWS input for the following: 1. Any federal legislative mechanisms (e.g. SARA permit) that ECCC can implement if the presence of western chorus frog were to be confirmed in a future field study, as it is not listed under Ontario’s Endangered Species Act; and For species listed in Schedule 1 of the Species at Risk Act (SARA) as Extirpated, Endangered or Threatened, a permit may be required from ECCC (section 73 of SARA) for activities that affect a listed terrestrial wildlife species, any part of its critical habitat, or the residences of its individuals, where those prohibitions are in place. As a terrestrial species at risk, that is not a migratory bird, the SARA prohibitions for individuals and residences of Western Chorus Frog are in place on federal lands. An Order by Governor in Council would be required for these SARA prohibitions to be brought into force on non-federal lands. At this time, no such order has been made for Western Chorus Frog in Ontario. Similarly, if critical habitat were to be identified for Western Chorus Frog at this site in future, through an updated recovery strategy or action plan, an Order by Governor in Council would be required for SARA prohibitions protecting critical habitat to be brought into force. Therefore, if the presence of Western Chorus Frog were to be confirmed at this site in a future field study, it would not trigger a SARA permitting requirement unless an Order by Governor in Council has been made ...

Report

Attachment From Transport Canada to Impact Assessment Agency of Canada - Federal Authority Advice Record for the Designation Request for the Baldwin East Aerodrome Project

  • Baldwin East Aerodrome Project
  • Author: Administrator on behalf of Transport Canada
  • Reference number: 16
  • Submitted: 2023-03-07
  • Please see the attached submission. 
  • Attachment included
  • www.canada.ca/iaac www.canada.ca/aeic UNCLASSIFIED / NON CLASSIFIÉ Enclosure 2 – Federal Authority Advice Record – Designation Request under the IAA – Baldwin East Aerodrome Project Response due by March 3, 2023 Department/Agency Transport Canada Lead Contact Mary Pollock / Adam Biffin Full Address 4900 Yonge St, North York, ON M2N 6A5 Email mary.pollock@tc.gc.ca / adam.biffin@tc.gc.ca Telephone 416-420-9254 / 416-669-1651 Alternate Departmental Contact David Zeit david.zeit@tc.gc.ca 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Specify as appropriate. Most new land aerodromes in Canada, such as the aerodrome in question, are required to consult interested parties per the Canadian Aviation Regulations Part III, Subpart VII (307). As part of this process, the Proponent of the Baldwin East Aerodrome Project submitted its Summary Report to Transport Canada (TC) Civil Aviation in May 2022, which conducted a review and determined the Proponent’s summary report to be in compliance with the regulatory requirements on July 4, 2022. The Proponent was notified by email on July 6, 2022 that no further information was required by Transport Canada at that time, as TC determined compliance with the applicable consultation requirements. It should be noted that the finding by TC of regulatory compliance with the CAR 307 regime does not constitute an “approval”, as aerodrome development is a ...
  • Attachment included
  • <Original signed by> <Original signed by> <Original signed by><Original signed by> <Original signed by> <Original signed by> <Original signed by> <Original signed by> <Original signed by> <Original signed by>

Report

Attachment From Fisheries and Oceans Canada to Impact Assessment Agency of Canada - Federal Authority Advice Record for the Designation Request for the Baldwin East Aerodrome Project

  • Baldwin East Aerodrome Project
  • Author: Administrator on behalf of Fisheries and Oceans Canada
  • Reference number: 10
  • Submitted: 2023-03-03
  • Updated: 2023-05-23 - 2:28 PM
  • Rationale: Comment updated for administrative purposes
  • Please see the attached submission. 
  • Attachment included
  • www.canada.ca/iaac www.canada.ca/aeic Enclosure 2 – Federal Authority Advice Record – Designation Request under the IAA – Baldwin East Aerodrome Project Response due by March 3, 2023 Department/Agency Fish and Fish Habitat Protection Program, Fisheries and Oceans Canada Lead Contact Rick Kiriluk, A/Team Leader, Triage and Planning Full Address 867 Lakeshore Road, Burlington, ON, L7S 1A1 Email Rick.Kiriluk@dfo-mpo.gc.ca Telephone 905-336-4560 Alternate Departmental Contact Lisa Wren, Lisa.Wren@dfo-mpo.gc.ca, 905-973-8392 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Specify as appropriate. Fisheries and Oceans Canada (DFO) has determined that we may have a regulatory role with this project. DFO has not yet exercised a power or performed a duty or function in relation to the Project or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, please specify that power, duty or function and its legislative source. A Fisheries Act paragraph 35(2)(b) Authorization will be required if the project is likely to cause the harmful alteration, disruption, or destruction to fish habitat and/or a Fisheries Act paragraph 34.4(2)(b) Authorization if ...

Report

Attachment From York Region to Impact Assessment Agency of Canada - Input on Designation Request for the Baldwin East Aerodrome Project

  • Baldwin East Aerodrome Project
  • Author: Administrator on behalf of York Region
  • Reference number: 14
  • Submitted: 2023-03-03
  • Please see the attached submission.
  • Attachment included
  • The Regional Municipality of York, 17250 Yonge Street, Newmarket, Ontario L3Y 6Z1 Tel: 905-830-4444, 1-877-464-YORK (1-877-464-9675) Internet: www.york.ca Corporate Services Office of the Chief Planner via email only March 3, 2023 Impact Assessment Agency of Canada Ontario Region 600-55 York Street Toronto, Ontario M5J 1R7 Attention: Spencer Roth, Project Analyst Email: designationontario@iaac-aeic.gc.ca Dear Spencer Roth: Re: Designation Request for the Baldwin East Aerodrome Project under the Impact Assessment Act 7818 & 7486 Old Homestead Road Town of Georgina Regional File No.: PSC.21.G.0661 We are pleased to respond to your February 20, 2023 letter inviting York Region’s input in relation to an Impact Assessment Review Agency Designation Request by Pefferlaw Area Ratepayers (the “Pefferlaw Ratepayers”) pursuant to subsection 9(1) of the Impact Assessment Act (the “Act”). The Pefferlaw Ratepayers request relates to the proposed Baldwin East Aerodrome Project (the “Project”). While we understand airports are under Federal jurisdiction, and that this proposal will be considered in accordance with Federal legislation and with Transport Canada being the approval authority, we respectfully submit that the concerns identified by the ratepayers constitute compelling “exceptional circumstances” related to the Project, and should be carefully considered by the Minister of Environment and Climate Change (the “Minister”), Transport Canada and the Impact Assessment Agency of Canada (the “Agency”). We also respectfully submit that Provincial, Regional and Local policies and context should be taken into consideration by both Transport Canada and by the ...

Report

Attachment From Health Canada to Impact Assessment Agency of Canada - Federal Authority Advice Record for the Designation Request for the Baldwin East Aerodrome Project

  • Baldwin East Aerodrome Project
  • Author: Administrator on behalf of Health Canada
  • Reference number: 11
  • Submitted: 2023-03-03
  • Please see the attached submission. 
  • Attachment included
  • www.canada.ca/iaac www.canada.ca/aeic Enclosure 2 – Federal Authority Advice Record – Designation Request under the IAA – Baldwin East Aerodrome Project Response due by March 3, 2023 Department/Agency Health Canada Lead Contact Kitty Ma Full Address 180 Queen Street West, Toronto, Ontario, M5V – 3L7 Email ia-on-ie-on@hc-sc.gc.ca Telephone 647 829 8295 Alternate Departmental Contact Julie Boudreau or Umme Akhtar 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Specify as appropriate. Not Applicable 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, please specify that power, duty or function and its legislative source. Not Applicable 3. If your department or agency will exercise a power or perform a duty or function (including financial assistance) under any Act of Parliament in relation to the Project, will it involve public and Indigenous consultation? If yes, please specify when and how public and Indigenous consultation would be undertaken. Not Applicable 4. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to any potential adverse effects in area of federal jurisdiction, including direct or incidental effects, stemming from the Project, as defined in the section 2 of the ...

Report

Attachment From Ministry of Citizenship and Multiculturalism to Impact Assessment Agency of Canada - Provincial Reviewer Advice Record for the Designation Request for the Baldwin East Aerodrome Project

  • Baldwin East Aerodrome Project
  • Author: Administrator on behalf of Ontario Ministry of Citizenship and Multiculturalism
  • Reference number: 12
  • Submitted: 2023-03-03
  • Please see the attached submission.
  • Attachment included
  • Enclosure 2 – Provincial Regulator Advice Record – Designation Request under the IAA – Baldwin East Aerodrome Project Response requested by March 3, 2023 Ministry Ministry of Citizenship and Multiculturalism (MCM) Lead Contact Karla Barboza, Team Lead – Heritage, Heritage Planning Unit Full Address Ministry of Citizenship and Multiculturalism (MCM) Heritage Branch, Heritage Planning Unit 5th Flr, 400 University Ave, Toronto, ON M7A 2R9 Email karla.barboza@ontario.ca Telephone 416-660-1027 Alternate Ministry Contact James Hamilton, Manager, Heritage Planning Unit (james.hamilton@ontario.ca) 1. In general terms, please confirm and describe your ministry’s role (if applicable) in the Project. The Ministry of Citizenship and Multiculturalism (MCM) has an interest in undertakings such as this under its mandate to develop policies and programs for the conservation of Ontario’s cultural heritage. MCM is responsible for the administration of the Ontario Heritage Act (OHA) including its regulations. The OHA provides the primary statutory framework for the conservation of cultural heritage resources in Ontario, including their identification, protection and wise management. The conservation of cultural heritage resources is also a matter of provincial interest and importance reflected in legislation such as the Planning Act and the Environmental Assessment Act, among others. The Environmental Assessment Act (EAA), which defines “environment” to include cultural conditions that influence the life of humans or a community. Cultural heritage resources (which includes archaeological resources, built heritage resources and cultural heritage landscapes) are important components ...

Report

Attachment From Sutton Airport Development Inc. to Impact Assessment Agency of Canada - Response to Agency Request for Information for the Baldwin East Aerodrome Project

  • Baldwin East Aerodrome Project
  • Author: Administrator on behalf of Sutton Airport Development Inc.
  • Reference number: 25
  • Submitted: 2023-03-01
  • Updated: 2023-05-24 - 9:15 AM
  • Rationale: Comment updated for administrative purposes
  • Please see the attached submission.
  • Attachment included
  • EXTERNAL MEMORANDUM 1 SUBJECT Response to: IAA Letter Dated February 15, 2023 Notification Regarding Potential Designation of the Baldwin East Aerodrome Project as a Designated Project under the Impact Assessment Act TO Susan Tiege A/Regional Director, Ontario Region Ontario Region 600-55 York Street Toronto ON M5J 1R7 COPIES Spencer Roth (he/him|il) Project Analyst, Ontario Region Impact Assessment Agency of Canada / Government of Canada designationontario@iaac-aeic.gc.ca FROM (the “Proponent”) Maurizio Marchioni march law barristers and solicitors 9100 Jane Street Suite 300, Building “A” Vaughan, Ontario Canada L4K 0A4 Tel: 905-738-8181 Fax: 905-695-8489 DATE March 1, 2023 Thank you for your letter referenced above. We have prepared this response in accordance with the timelines you have outlined providing us with fourteen (14) days to respond with a deadline of March 1, 2023. To begin, we ask that you consider Attachment 1 which outlines an executive summary of how we complied with the applicable federal Canadian Aviation Regulations (CARs) 307 related to Aerodrome Consultations. This is also captured in the May 30, 2022, Revision 3, Final Summary Report which you have referenced in your letter and remains available to the public on the project website at https://www.newaerodromeontario2021.ca/. The federal CARs 307 Aerodrome Consultation Process was initiated on November 2021 and was concluded on July 6, 2022. Furthermore, Attachment 2 includes a letter received from your department dated April 28, 2022 which confirmed that the IAA does not apply and offered additional considerations as part future steps. It is our understanding that ...

Report

Attachment From Lake Simcoe Region Conservation Authority to Impact Assessment Agency of Canada - Input on Designation Request for the Baldwin East Aerodrome Project

  • Baldwin East Aerodrome Project
  • Author: Administrator on behalf of Lake Simcoe Region Conservation Authority
  • Reference number: 22
  • Submitted: 2023-03-01
  • Mr. Roth,   The Lake Simcoe Region Conservation Authority has reviewed the request under the Impact Assessment Act for the designation of the Baldwin East Aerodrome Project. Based on our review of the information provided we offer the following comments for your consideration:   General   The Lake Simcoe Region Conservation Authority (LSRCA) implements Ontario Regulation 179/06 pursuant to the Conservation Authorities Act. This Act and Regulation considers Natural Hazard management from a watershed perspective.   The LSRCA is delegated provincial interest in plan review for Natural Hazards from the Province. The LSRCA is a commenting agency for Municipalities as it relates to land use and applicable environmental legislation. Specifically, the Authority provides comments and information under the Provincial Policy Statement and the Lake Simcoe Protection Act and Plan as well as the Greenbelt and Oak Ridges Moraine Act and Plans prior to recent Provincial direction. We recognize that provincial and federal agencies are not subject to the requirements for permission under the Act and the Municipal Planning process, however, we recommend voluntary review processes to avoid adverse effects resulting from development within regulated areas.   Based on our review of internal and external mapping, the subject locations (7818 & 7486 Old Homestead Road) contain the following environmental features for consideration:   Burnie Creek traverses the southeast section of 7818 Old Homestead Road There are erosion and flooding hazards associated with the ...
  • Attachment included
  • Date: 21 February 2023 Document(s) Reviewed: Hydrogeological Review Address: Baldwin East Aerodrome Project; 7818 and 7486 Old Homestead Road, Georgina APID: 206237 and 195762 # Drawing/Section: Page: Comments: H1 The site is mapped as being largely within a significant groundwater recharge area and an ecologically significant groundwater recharge area. Policy 6.40-DP of the Lake Simcoe Protection Plan is applicable to this site. “Outside of the Oak Ridges Moraine area, an application for major development within a significant groundwater recharge area (SGRA) shall be accompanied by an environmental impact study that demonstrates that the quality and quantity of groundwater in these areas and the function of the recharge areas will be protected, improved or restored.” Please demonstrate how this policy will be satisfied. H2 The site is mapped as being partially within a highly vulnerable aquifer and a significant groundwater recharge area, as defined by the Clean Water Act (2006) and the South Georgian Bay Lake Simcoe Source Protection Plan. Please demonstrate how the quality and quantity of the groundwater will be maintained. H3 Please provide a Thornthwaite-Mather water balance for the pre-development and the post-development scenarios. Demonstrate how the quantity and quality of the groundwater will be maintained in the post- development scenario. Note: The post-development infiltration volume is to match the pre-development infiltration volume. H4 The property is host to “Provincially Significant Wetlands”. Demonstrate how the quality of these wetlands will be maintained in the post-development scenario. A feature-based water balance is required to demonstrate ...