Bigstone Cree Nation High School Waterline Project

Bigstone Cree Nation plans to install a water pipeline to the high school to increase water conveyance capacity. The proposed project will involve installation of a new  250 mm water pipeline that is 950 m in length via horizontal directional drilling. The new water pipeline will be connected to the existing 150 mm pipeline at the school site to form a loop that can increase the reliability of water distribution.


Latest update

August 11, 2022 – Indigenous Services Canada issued its notice of determination Bigstone Cree Nation High School Waterline Project - Canada.ca (iaac-aeic.gc.ca) and determined that the project is not likely to cause significant adverse environmental effects.

.

Participate

Contacts

Cassandra Breton
Indigenous Services Canada
Cassandra Breton, Environment Officer
630 Canada Place 9700 Jasper Ave, Edmonton AB
Edmonton, Alberta T5J 4G2
Telephone: 587-338-7033
Email: cassandra.breton@sac-isc.gc.ca


  • Location

    • Wabasca (Alberta)
  • Nature of Activity

    • Water Management
  • Assessment Status

    Completed
  • Start Date

    2022-05-27
  • Proponent

    Bigstone Cree Nation
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    83671
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: