Attachment Screening Required Letter - Deadhorse Reservoir - Bow River Irrigation District

  • Deadhorse Coulee Reservoir Project
  • Author: Administrator on behalf of Alberta Environment and Parks
  • Reference number: 18
  • Submitted: 2022-06-30
  • Please see attached a screening required letter which has been issued to the Bow River Irrigation District for their proposed Deadhorse Reservoir Project. Also attached is the background information that was provided by the proponent.
  • Attachment included
  • Classification: Protected A Regulatory Assurance Div ision Approv als Unit 2nd Floor, Petroleum Plaza, South Tower 9915 – 108 Street Edmonton, Alberta T5K 2G8 Canada Telephone: 780-427-5828 http://www.ea.alberta.ca June 29, 2022 Richard Phillips General Manager Bow River Irrigation District 704 – 7 Ave N Vauxhall, AB T0K 2K0 Dear Mr. Phillips: Further to your e-mail of June 9, 2022, I have performed an initial review of your proposed Deadhorse Reservoir Project pursuant to Section 44 of the Environmental Protection and Enhancement Act (EPEA). This activity is not a mandatory activity for the purposes of environmental assessment, however, having regard to the consideration set out in Section 44(3) of EPEA, I have decided that further assessment of the activity is required. Under Section 44(5) of EPEA you are required to provide notice of this decision in accordance with Section 3 of the Environmental Assessment Regulation. We require the submission of a disclosure document which provides sufficient information about the project and its impacts so that the public can understand the project and provide input to the process. Please contact the Environmental Assessment Coordinator, Meghan Jurijew at 780-643-6853 (meghan.jurijew@gov.ab.ca) for guidance on the content and placement of the notice and on the required content of the public disclosure document. I will use this information and the advice which I receive from the public and government agencies to make a decision on the need for an Environmental Impact Assessment (EIA) report. I will also prepare and issue a screening report documenting the decision. If you have any questions or need further information, ...
  • Attachment included
  • Project Summary Table Proponent name: Bow River Irrigation District (BRID) Date: May 18, 2022 Project name: Deadhorse Reservoir Company contact names and information: Jeff Hust – Engineering (MPE Engineering Ltd.) jhust@mpe.ca (403) 317-3634 Richard Phillips (BRID) richardp@brid.ca (403) 654-2111 Name of company that will hold approval: Bow River Irrigation District Company website: https://www.brid.ca/ Type of project (e.g., water management, hydroelectric, etc.): Water Management New project, expansion, additional phase or modification: New project Project location (legal land description and municipality): Reservoir is located in 34-13-18-W4, 27-13-18-W4, 26-13-18-W4, 22-13-18-W4. And 23-13-18-W4 MD of Taber Total project area (ha): The project will create a reservoir with a surface area of 475 ha. Indicate whether the project is on private, federal or provincial land: SW 27-13-18 is municipal land, everything else is private land. List any parks/protected areas/conservation areas that may be impacted: None Nearest First Nation Reserve(s) and Métis Settlements (name and km): Blood No 148, approximately 60 km to the southwest of the Project. Siksika No 146 approximately 70 km to the northwest of the Project. Nearest waterway/ water body (name and km): Located on existing BRID Main Canal. Lost Lake, 4 km to the northeast of the Project. Nearest provincial highway (# and distance): Hwy 526, approximately 4 km to the north of the Project. Hwy 25, approximately 8 km to the west of the Project Potential annual water usage and source: The primary use of the stored water is for irrigation. Additional usage would be municipal and recreation . The source of the water is the BRID Main Canal under ...

Report

Attachment Federal Authority Advice Record

  • Deadhorse Coulee Reservoir Project
  • Author: Administrator on behalf of Fisheries and Oceans Canada (DFO)
  • Reference number: 17
  • Submitted: 2022-06-07
  • Please see the attached submission.
  • Attachment included
  • ATTACHMENT Federal Authority Advice Record: Designation Request under IAA Response due by May 12, 2022 Deadhorse Coulee Reservoir Project Department/Agency Fisheries and Oceans Canada Lead Contact Rick Kiriluk, A/Team Leader, Triage and Planning Full Address 867 Lakeshore Road, Burlington, ON L7S 1A1 Email rick.kiriluk@dfo-mpo.gc.ca Telephone 905-336-4560 Alternate Departmental Contact Deborah Silver, deborah.silver@dfo-mpo.gc.ca, 365-323-0247 Lisa Wren, lisa.wren@dfo-mpo.gc.ca, 905-973-8392 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would al low the Project to proceed in whole or in part? Specify as appropriate. Fisheries and Oceans Canada (DFO) has determined that we may have a regulatory role with this project. DFO has not yet exercised a power or performed a duty or function in relation t o the Project or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify that power, duty or function and its legislative source. A Fisheries Act paragraph 35(2)(b) Authorization will be required if the project is likely to cause the harmful alteration, disruption, or destruction to fish habitat and/or a Fisheries Act paragraph 34.4(2)(b) Authorization if the project is likely to ...

Report

Attachment Federal Authority Advice Record

  • Deadhorse Coulee Reservoir Project
  • Author: Administrator on behalf of Transport Canada (TC)
  • Reference number: 14
  • Submitted: 2022-06-06
  • Please see the attached submission.
  • Attachment included
  • UNCLASSIFIED / NON CLASSIFIÉ ATTACHMENT Federal Authority Advice Record: Designation Request under IAA Response due by May 12, 2022 June 6, 2022 (extended deadline) Deadhorse Coulee Reservoir Project Department/Agency Transport Canada Lead Contact Holly Poklitar Full Address Winnipeg Email holly.poklitar@tc.gc.ca Telephone (204) 688-3872 Alternate Departmental Contact adam.downing@tc.gc.ca 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Specify as appropriate. Transport Canada has not previously considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify that power, duty or function and its legislative source. Transport Canada (TC) will not be required to exercise a power or perform a duty or function with respect to the Canadian Navigable Waters Act (CNWA) based on the initial Project description provided. Work related to man-made artificial irrigation channels are excluded from the CNWA. 3. If your department or agency will exercise a power or perform a duty or ...

Report

Attachment Designation Request - Deadhorse Coulee Reservoir Project (Kainai)

  • Deadhorse Coulee Reservoir Project
  • Author: Administrator on behalf of Blood Tribe/Kainai
  • Reference number: 15
  • Submitted: 2022-06-06
  • Please see the attached submission.
  • Attachment included
  • 340 – 1122 Mainland Street Vancouver, BC V6B 5L1 T 604 687 0459 ext 300 F 604 687 2696 www.jfklaw.ca Blair Feltmate He/him/his Associate C 604 831 7804 E bfeltmate@jfklaw.ca June 6, 2022 Delivered by Email: ministre-minister@ec.gc.ca; information@iaac-aeic.gc.ca File No. 1187-039 Environment and Climate Change Canada Fontaine Building 12th Floor, 200 Sacré-Coeur Blvd Gatineau, QC K1A 0H3 Honourable Minister Steven Guilbeault Impact Assessment Agency of Canada 757 W Hastings St. Site 210A Vancouver, BC V6W 3M2 Dear Honourable Minister Guilbeault and the Impact Assessment Agency of Canada: Re: Deadhorse Coulee Reservoir Project We are legal counsel to Blood Tribe/Kainai (“Kainai”) with regard to the Deadhorse Coulee Reservoir Project (the “Project”). Kainai recently became aware of the request to designate the proposed Project from Ecojustice on behalf of several interested parties (including multiple environmental groups and two individuals) (the “Ecojustice Request”). We write on behalf of our client to request that the Minister of Environment and Climate Change Canada (the “Minister”) designate the Project for federal review under section 9(1) of the Impact Assessment Act, SC 2019, c 28, s 1. 1.0 EXECUTIVE SUMMARY Kainai is a party to the Blackfoot Treaty (Treaty 7) and are members of the Blackfoot Confederacy. Kainai are Aboriginal peoples and possess Aboriginal and Treaty rights protected and defined under section 35 of the Constitution Act, 1982. This Project requires a federal review by the IAAC. As proposed, the Project: mailto:bfeltmate@jfklaw.ca mailto:ministre-minister@ec.gc.ca mailto:information@iaac-aeic.gc.ca  is located in the environmentally ...

Report

Attachment Designation Request - Deadhorse Coulee Reservoir Project (Siksika)

  • Deadhorse Coulee Reservoir Project
  • Author: Administrator on behalf of Siksika Nation
  • Reference number: 16
  • Submitted: 2022-06-06
  • Please see the attached submission.
  • Attachment included
  • 340 – 1122 Mainland Street Vancouver, BC V6B 5L1 T 604 687 0459 ext 300 F 604 687 2696 www.jfklaw.ca Blair Feltmate He/him/his Associate C 604 831 7804 E bfeltmate@jfklaw.ca June 6, 2022 Delivered by Email: ministre-minister@ec.gc.ca; information@iaac-aeic.gc.ca File No. 1229-028 Environment and Climate Change Canada Fontaine Building 12th Floor, 200 Sacré-Coeur Blvd Gatineau, QC K1A 0H3 Honourable Minister Steven Guilbeault Impact Assessment Agency of Canada 757 W Hastings St. Site 210A Vancouver, BC V6W 3M2 Dear Honourable Minister Guilbeault and the Impact Assessment Agency of Canada: Re: Deadhorse Coulee Reservoir Project We are legal counsel to Siksika Nation (“Siksika”) with regard to the Deadhorse Coulee Reservoir Project (the “Project”). Siksika recently became aware of the request to designate the proposed Project from Ecojustice on behalf of several interested parties (including multiple environmental groups and two individuals) (the “Ecojustice Request”). We write on behalf of our client to request that the Minister of Environment and Climate Change Canada (the “Minister”) designate the Project for federal review under section 9(1) of the Impact Assessment Act, SC 2019, c 28, s 1 (the “Act”). 1.0 EXECUTIVE SUMMARY Siksika is a party to the Blackfoot Treaty (Treaty 7) and are members of the Blackfoot Confederacy. Siksika are Aboriginal peoples and possess Aboriginal and Treaty rights protected and defined under section 35 of the Constitution Act, 1982. This Project requires a federal review by the IAAC. As proposed, the Project:  is located in the environmentally sensitive watershed of the Oldman River ...

Report

Attachment Federal Authority Advice Record

  • Deadhorse Coulee Reservoir Project
  • Author: Administrator on behalf of Natural Resources Canada (NRCan)
  • Reference number: 13
  • Submitted: 2022-05-25
  • Please see the attached submission.
  • Attachment included
  • May 25, 2022 CIAR File No.: 83563 Andy Clarke Environmental Assessment Officer, Prairie and Northern Region Impact Assessment Agency of Canada andy.clarke@iaac-aeic.gc.ca c/o pnr-rpn@iaac-aeic.gc.ca Subject: Natural Resources Canada’s Submission in Response to the Designation Request for the Deadhorse Coulee Reservoir Project On April 22nd, the Impact Assessment Agency of Canada (the Agency) requested that Natural Resources Canada (NRCan) provide information in response to the Designation Request for the Deadhorse Coulee Reservoir Project (the Project) located between Lethbridge and Brooks, Alberta. On May 4th, a suspension of the 90-day timeline was granted to the Proponent in order to provide sufficient time to address information requested by the Agency. On May 24th, the timeline resumed. NRCan is responding to this Designation Request pursuant to subsection 13(1) of the Impact Assessment Act. Details of NRCan’s response can be found in the appendix below. If you have any questions, please contact me via e-mail at walker.smith@nrcan-rncan.gc.ca or by phone at (613) 447-2892. Thank you, Walker Smith Environmental Assessment Officer Office of the Chief Scientist cc: Laurence Davidson – Team Lead, Impact Assessment <Original signed by> https://iaac-aeic.gc.ca/050/evaluations/proj/83563 mailto:andy.clarke@iaac-aeic.gc.ca mailto:pnr-rpn@iaac-aeic.gc.ca mailto:walker.smith@nrcan-rncan.gc.ca Page 2 of 4 ATTACHMENT Federal Authority Advice Record: Designation Request under IAA Response due by May 12, 2022 Deadhorse Coulee Reservoir Project Department/Agency Natural ...

Report

Attachment Project Designation Information Request

  • Deadhorse Coulee Reservoir Project
  • Author: Administrator on behalf of MPE Engineering Ltd.
  • Reference number: 12
  • Submitted: 2022-05-24
  • Please see the attached submission.
  • Attachment included
  • Alberta Irrigation Modernization (AIM) Program 1 Alberta’s Irrigation Districts 13 districts, 1.5 million acres • 3 on the Bow River • 1 on the Oldman River • 8 on the St. Mary, Waterton, & Belly Rivers (Oldman tribs.) • 1 on Ross Creek (Cypress Hills) 2 Why Irrigate? • Good soils, lots of sunshine • Variable and frequently inadequate precipitation • Rocky mountain snowpack • Choice of crops • 60 vs. 25 • Productivity • Irrigated vs dryland 3 0 50 100 150 200 250 300 350 400 450 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4 2 0 1 5 2 0 1 6 2 0 1 7 2 0 1 8 2 0 1 9 P re ci p it at io n ( m m ) Growing Season Precipitation (average of Brooks, Bow Island and Lethbridge) Why Irrigate? • Near Vauxhall, Alberta July 30, 2021 Irrigated grainUnirrigated grain 4 Why Irrigate? • Near Vauxhall, Alberta July 30, 2021 Unirrigated dry peas Irrigated dry peas 5 Why Irrigate? 6 Why Irrigate? • Over 40% of the world’s food supply is dependent on irrigation. • Irrigation is the most reliable prevention for famine. • Global population is expected to grow to 11.2 billion by 2100 • Canada is one of 5 countries identified as having the ability to significantly increase food production to support this growth. • Increase export of primary product • Increase production and export of value-added product 7 0 2 4 6 8 10 12 1990 2015 2030 2050 2100 5.3 7.3 8.5 9.7 11.2 B ill io n s Year Projected global population increase Why Irrigate? “Economic Value of Alberta’s Irrigation Districts” by Acera Consult Inc. was released in November 2021. Key findings include: • Sales of crops and livestock ...
  • Attachment included
  • Classification: Public 2021 Environmental Assessment for the Deadhorse Coulee Dam Project December 2021 MPE Engineering Ltd. #300, 714 – 5 Ave S Lethbridge, Alberta T1J 0V1 Environmental Assessment for the Deadhorse Coulee Dam Project – BTES file 21-MPE002 This page is left intentionally blank Environmental Assessment for the Deadhorse Coulee Dam Project – BTES file 21-MPE002 Bear Tracks Environmental December 2021 Services (2015) Ltd. ii Table of Contents 1 Introduction ............................................................................................................... 1 2 Project Description ................................................................................................... 1 3 Study Area ................................................................................................................. 1 4 Desktop Assessment .................................................................................................. 3 4.1 Methods ................................................................................................................ 3 4.1.1 Desktop Review ............................................................................................ 3 4.1.2 Geospatial Review ........................................................................................ 5 4.1.3 Site Visit........................................................................................................ 6 4.2 Results .................................................................................................................. 6 4.2.1 ...
  • Attachment included
  • Suite 300, 714 5 Avenue South Lethbridge, AB T1J 0V1 Phone: 403-329-3442 1-866-329-3442 Fax: 403-329-9354 1 Impact Assessment Agency of Canada Date: May 24, 2022 Prairie and Northern Region File: N:\1510-032\L09 Canada Place Suite 1145, 9700 Jasper Ave Edmonton, AB T5J C3 Attention: Mr. Andrew Clarke Environmental Assessment Officer Dear Sir: Re: Project Designation Information Request - Deadhorse Reservoir Project Reference No. 83563 In response to the request for additional information on the Deadhorse Reservoir Project from the Impact Assessment Agency of Canada (IAAC) please find enclosed the responses to the questions regarding the project and its effects. The responses listed below follow the questions posed in the April 27, 2022 request to the Bow River Irrigation District. 1. Information about key project activities, maps, and layouts of the location of project components, land tenure, zoning, and estimates timelines for planning, construction, operation, decommissioning, and abandonment. Deadhorse Reservoir is a proposed off-stream storage reservoir to be located in Deadhorse Coulee near the midpoint of the Bow River Irrigation District (BRID) Main Canal between Little Bow Reservoir and Scope Reservoir. Deadhorse Coulee is a natural coulee located approximately 10 km southeast of Enchant, AB in the Oldman River basin. The BRID Main Canal runs through Deadhorse Coulee until it is diverted out of the coulee by an existing dam 1.5 km downstream of Range Road 18-1. For the location of the project refer to Figure 1. Existing land use is shown in Figure 2. Deadhorse Reservoir will act primarily as a balancing and re-regulating reservoir which will enable greater precision of water delivery and help the BRID ...

Report

Attachment Federal Authority Advice Record

  • Deadhorse Coulee Reservoir Project
  • Author: Administrator on behalf of Women and Gender Equality Canada (WAGE)
  • Reference number: 11
  • Submitted: 2022-05-13
  • Please see the attached submission.
  • Attachment included
  • Page 1 of 9 ATTACHMENT Federal Authority Advice Record: Designation Request under IAA Response due by May 12, 2022 Deadhorse Coulee Reservoir Project Department/Agency Women and Gender Equality Canada Lead Contact Denise Gareau Full Address 22 Eddy St., Gatineau QC Email CFC.EvaluationImpacts-ImpactsAssessment.SWC@cfc-swc.gc.ca Telephone 819-938-1132 Alternate Departmental Contact Jessica Bialek 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Specify as appropriate. No. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify that power, duty or function and its legislative source. WAGE does not hold any regulatory power, functions or duties. 3. If your department or agency will exercise a power or perform a duty or function under any Act of Parliament in relation to the Project, will it involve public and Indigenous consultation? Specify as appropriate. N/A 4. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to any potential adverse effects within federal jurisdiction caused by the Project or adverse direct or incidental effects stemming from the Project? Specify as appropriate. mailto:CFC.EvaluationImpacts-ImpactsAssessment.SWC@cfc-swc.gc.ca Page 2 of 9 WAGE holds ...

Report

Attachment Federal Authority Advice Record

  • Deadhorse Coulee Reservoir Project
  • Author: Administrator on behalf of Canada Infrastructure Bank (CIB)
  • Reference number: 10
  • Submitted: 2022-05-12
  • Please see the attached submission.
  • Attachment included
  • ATTACHMENT Federal Authority Advice Record: Designation Request under IAA Response due by May 12, 2022 Deadhorse Coulee Reservoir Project Department/Agency Canada Infrastructure Bank Lead Contact Jodie Parmar Full Address 150 King Street West, Suite 2309, P.O. Box 15, Toronto, ON, M5H 1J9 Email jparmar@cib-bic.ca Telephone 416-644-4506 Alternate Departmental Contact Frédéric Duguay fduguay@cib-bic.ca 416-847-7714 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Specify as appropriate. Yes, however only for the Phase 1, Modernization Works, of the Project. Analysis with respect to the proposed Phase 2 Reservoir Works, we can only consider our obligations once more information is available on the specifics of the works to inform if they fall within the scope of the Alberta Environmental Protection and Enhancement Act or the Impact Assessment Act, based on legal covenants that the CIB has incorporated in its legal documentation with respect to the Project. A description of the CIB’s role and background of the Project is attached to this form. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify that power, duty or function and its legislative source. Yes, the CIB may provide financing for the proposed Phase 2 Reservoir Works and, if so, it will ...
  • Attachment included
  • Canada Infrastructure Bank | Banque de l’infrastructure du Canada Page 1 of 3 Re: IAAC Request for Input, Designation Request for Chin Reservoir Expansion and Modernization Project; Snake Lake Reservoir Expansion Project and Deadhorse Coulee Reservoir Project. The Canada Infrastructure Bank (“CIB”) is a federal Crown corporation established by the Canada Infrastructure Bank Act. The CIB’s purpose is to invest and seek to attract investment from private sector investors and institutional investors, in infrastructure projects in Canada or partly in Canada that will generate revenue and that will be in the public interest by, for example, supporting conditions that foster economic growth or by contributing to the sustainability of infrastructure in Canada. The CIB develops projects in partnership with federal, provincial, territorial, municipal and Indigenous sponsors and the private sector. The CIB’s investments are focused on five priority sectors: public transit, clean power, green infrastructure, broadband, and trade and transportation. As described in the CIB’s 2020-21 to 2024-25 Corporate Plan, the CIB has set an investment target of $1.5 billion for agriculture-related infrastructure projects, starting with major irrigation projects in Western Canada to help the agriculture sector enhance production, strengthen Canada’s food security, and expand export opportunities. In December 2020, the CIB announced its investment in the Alberta Irrigation Project (the “Project”). The CIB’s financial commitment is structured as a loan in the amount of up to $466 million for permitted project costs. The Government of Alberta will contribute $244.5 million and the irrigation districts (“IDs”) ...

Report

Attachment Federal Authority Advice Record

  • Deadhorse Coulee Reservoir Project
  • Author: Administrator on behalf of Indigenous Services Canada (ISC)
  • Reference number: 8
  • Submitted: 2022-05-12
  • Please see the attached submission.
  • Attachment included
  • GCDOCS # 102514937 ATTACHMENT Federal Authority Advice Record: Designation Request under IAA Response due by May 12, 2022 Deadhorse Coulee Reservoir Project Department/Agency Indigenous Services Canada  Lead Contact Anik Guertin Full Address 10 Wellington Street, Gatineau, Quebec, K1A 0H4 Email anik.guertin@sac-isc.gc.ca Telephone 613-297-3730 Alternate Departmental Contact Elizabeth Blanchette: elizabeth.blanchette@sac-isc.gc.ca Theresa Marion: theresa.marion@sac-isc.gc.ca Debra Nkusi: debra.nkusi@sac-isc.gc.ca Constantine Tikhonov: Constantine.Tikhonov@sac.isc.gc.ca 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Specify as appropriate. Indigenous Services Canada (ISC) has considered an interest in the Project related to impacts on Indigenous peoples and the rights of Indigenous peoples. ISC has not exercised a power or performed a duty or function under any Act of Parliament in relation to the Project or taken any course of action that would allow the Project to proceed in whole or in part. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify that power, duty or function and its legislative source. ISC is not responsible for approving or issuing licences, permits or authorizations for the assessments of large, proposed projects that are not on ...

Report

Attachment Federal Authority Advice Record

  • Deadhorse Coulee Reservoir Project
  • Author: Administrator on behalf of Health Canada (HC)
  • Reference number: 7
  • Submitted: 2022-05-12
  • Please see the attached submission.
  • Attachment included
  • ATTACHMENT Federal Authority Advice Record: Designation Request under IAA Response due by May 12, 2022 Deadhorse Coulee Reservoir Project Department/Agency Health Canada Lead Contact Brenda Woo Full Address 9700 Jasper Ave, 9th Floor Edmonton, Alberta, T5J 4G3 Email ia-ea@hc-sc.gc.ca Telephone 780-288-3541 Alternate Departmental Contact Graham Irvine (graham.irvine@hc-sc.gc.ca) 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Not Applicable Specify as appropriate. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? No If yes, specify that power, duty or function and its legislative source. 3. If your department or agency will exercise a power or perform a duty or function under any Act of Parliament in relation to the Project, will it involve public and Indigenous consultation? No Specify as appropriate. 4. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to any potential adverse effects within federal jurisdiction caused by the Project or adverse direct or incidental effects stemming from the Project? Specify as appropriate. As a federal authority, Health Canada will provide specialist or expert information and knowledge in the Department’s possession (expertise) to ...

Report

Attachment Federal Authority Advice Record

  • Deadhorse Coulee Reservoir Project
  • Author: Administrator on behalf of Environment and Climate Change Canada (ECCC)
  • Reference number: 9
  • Submitted: 2022-05-12
  • Please see the attached submission.
  • Attachment included
  • <Original signed by> ATTACHMENT Federal Authority Advice Record: Designation Request under IAA Response due to Agency by May 12, 2022 Deadhorse Coulee Reservoir Project Department/Agency Environment and Climate Change Canada Lead Contact Heather Konopski, Environmental Assessment Officer, Prairie and Northern Region, Environmental Protection Branch Full Address Environmental Protection Operations Directorate Prairie & Northern Region 150-123 Main Street Winnipeg, MB R3C 4W2 Email Heather.konopski@ec.gc.ca Telephone n/a Alternate Departmental Contact Gayle Hatchard, Senior Environmental Assessment Officer gayle.hatchard@ec.gc.ca, (587-341-9793) General Inbox: EASouthPNR@ec.gc.ca 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Specify as appropriate. ECCC has not previously considered the Project, exercised a power or performed a duty, or taken any course of action as part of the Project. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify that power, duty or function and its legislative source. Based on the available information, ECCC does not expect that it will be required to exercise a power or perform a duty or function related to the Project to enable it to proceed. Once the scope of the Project and of the assessment are ...

Report

Attachment Federal Authority Advice Record

  • Deadhorse Coulee Reservoir Project
  • Author: Administrator on behalf of Department of National Defence (DND)
  • Reference number: 19
  • Submitted: 2022-05-09
  • I have provided the FAAR for Chin, Deadhorse and Snake Lake Reservoir projects for Kipp Range and Trg Area (RTA) 10 minutes west of Lethbridge.   Kipp RTA is located in the Mixed Grass Subregion of the Grassland Natural Region. Kipp RTA is situated approximately 870m ASL within the Oldman River valley. It is situated on surficial fluvial overbank and channel deposits. Surficial deposits consisted of a thin layer (approximately 1m thick) of silty clay with 10% gravel, which fades into the 90% gravel within the fluvial deposits of the Oldman River valley (EBA Engineering, Natural Resource Inventory 2007)   We are actively assessing SAR on the property.   I do not see any potential impacts of these projects on Kipp RTA.   Garry D. Kane   Environment Officer 3rd Canadian Division Support Base (3 CDSB) E&S Detachment Southern AB Department of National Defence/Government of Canada
  • Attachment included
  • Please see the attachment to view the content.
  • Attachment included
  • ATTACHMENT Federal Authority Advice Record: Designation Request under IAA Response due by May 12, 2022 Deadhorse Coulee Reservoir Project Department/Agency Department of National Defence – 3rd Canadian Division Support Base Detachment Southern AB Lead Contact Garry Kane, Base Environmental Officer Full Address Gen Waters Bldg, 4225 Crowchild Trail SW, Calgary AB T3E1T8 Email Garry.Kane@forces.gc.ca Telephone 403-589-2733 Alternate Departmental Contact N/A 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? No. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? No. 3. If your department or agency will exercise a power or perform a duty or function under any Act of Parliament in relation to the Project, will it involve public and Indigenous consultation? No. 4. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to any potential adverse effects within federal jurisdiction caused by the Project or adverse direct or incidental effects stemming from the Project? a. The site specific Species at Risk Work Plans shared with ECCC CWS could be made available, as required. 5. Has your department or agency had previous contact or involvement with the proponent or other parties in relation to the ...