Projet de remplacement du barrage-pont Témiscamingue du Québec
- Titre du commentaire
- Get it right this time
- Présenté par
- STEWART MILLAR au nom de local fisherman
- Texte du commentaire
To whom it may concern, the previous project at the dam left EVERONE wih no way to fish. After 100 years. You removed the conrete bottom and sides south of the dam , and filled in in with blasted jagged rock. 0 chance for any fishing from the bridge. Instead of the flat area beside the dam they put in a slope with a fence so people could get hurt. Doing stupid shit just to catch fish. You removed the ability to sports fish.
I am suggesting a similar built as whats in place past tdam so we can fish safely. Idelly it would be best to build a walkway arould to the dock with a railing and concrete walkway. That way people could walk or fish a large area.
I am available to discuss my concerns.
- Date et heure de soumission
- 2024-03-22 16 h 10
- Numéro de référence
- 31