Springpole Gold Project
- Comment title
- 2026-03-26 PRT INPUT - MECP to IAAC - Comments on the Draft Environmental Assessment Report and Draft Potential Conditions
- Submitted by
- Administrator on behalf of Ministry of the Environment, Conservation and Parks
- Comment text
See the attached submission / Veuillez consulter la pièce jointe
- Date submitted
- 2026-04-07 - 2:54 PM
- Phase
- Environmental Assessment Report
- Attachment(s)
-
- Springpole_IAAC_Draft EA_ MECP Hydrology_Redacted.pdf (160 KB)
- Springpole_IAAC_Draft EA_MECP Hydrogeology Groundwater_Redacted.pdf (149.4 KB)
- Springpole_IAAC_Draft_EA_MECP_surface water_Redacted.pdf (240.3 KB)
- Reference number
- 133