Amisk Hydroelectric Project

Comment Search Mobile

Comment Search

Skip to filters

77 results

Attachment From Parks Canada to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 32
  • Submitted: 2016-01-29
  • From Parks Canada to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines
  • Attachment included
  • 1+1 Parks Pares Canada Canada Tawanis Testart Project Manager Canadia,n Environmental Assessment Agency Canada Place, Suite 1145-9700 Jasper Avenue Edmonton A!berta, TSJ 4C3 Tawanis.Testart@ceaa-acee.gc.ca January 29, 2016 Dear Ms. Testart, Subject: Parks Canada comments on the draft EIS Guidelines for the Amisk Hydroelectric Project, Dated December 2015 Focus of the Parks Canada Agency's Participation The Parks Canada Agency {PCA), as a Federal Authority, recognizes its responsibility under the Canadian Environmental Assessment Act, 2012 {Section 20 and 67, CEAA 2012) to provide specialist or expert advice related to our mandate for projects subject to the federal environmental assessment process. The Parks Canada Agency is mandated to protect and present nationally significant examples of Canada's natural and cultural heritage and foster public understanding, appreciation and enjoyment in ways that ensure their ecological and commemorative integrity for present and future generations. Parks Canada's primary interest in the Amisk Hydroelectric Project (the Project) is the potential cumulative impact on the Peace-Athabasca Delta (PAD) in Wood Buffalo National Park (WBNP) from the proposed flow regulation on the Peace River. Participation in the review of the Project will focus on PCA's mandate with respect to the potential effects of the project on the hydrology, ecological integrity, and Aboriginal use of the lower Peace River and the PAD in WBNP. Context The Amisk Hydroelectric Project is the fourth proposed hydroelectric generating facility along the Peace River. The proposed project is the furthest downstream and the last point of flow regulation before the Peace River ...

Attachment From Horse Lake First Nation to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 48
  • Submitted: 2016-01-25
  • From Horse Lake First Nation to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines
  • Attachment included
  •   January  25,  2016     Tawanis  Testart   Canadian  Environmental  Assessment  Agency   Prairie  and  Northern  Region   Canada  Place   Suite  1145,  9700  Jasper  Avenue   Edmonton,  Alberta  T5J  4C3   Email:  Tawanis.Testart@ceaa-­‐acee.gc.ca     Margot  Trembath   Environmental  Assessment  Coordinator   Alberta  Environment  &  Parks   2nd  Floor  Petroleum  Plaza  ST   9915-­‐108  Street   Edmonton,  Alberta  T5G  2G8   Email:  margot.trembath@gov.ab.ca     RE: Horse Lake First Nation’s written comments on the draft Environmental Impact Statement Guidelines for the proposed Amisk Hydroelectric Project Dear  Ms.  Testart  and  Ms  Trembath,     Thank  you  for  providing  Horse  Lake  First  Nation  (“HLFN”)  with  the  opportunity  to   comment  on  the  draft  Environmental  Impact  Statement  (“EIS”)  Guidelines  for  the   proposed  Amisk  Hydroelectric  Project  (“Project”).       AHP  Development  Corporation  is  in  the  planning  stages  of  the  Amisk  Hydroelectric   Project.    Amisk  has  proposed  a  330  MW  run-­‐of-­‐river  hydroelectric  project  on  the   Peace  River  in  northwestern  Alberta.    The  proposed  Project  is  slated  to  generate   approximately  1,875  GWh  per  year  of  electricity,  which  is  enough  power  to  supply   approximately  250,000  homes.       HLFN  currently  exercises  our  constitutionally  protected  Treaty  and  Aboriginal   rights ...

Attachment From the Government of the Northwest Territories to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 31
  • Submitted: 2016-01-25
  • From the Government of the Northwest Territories to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines
  • Attachment included
  • 0 Northwest Territories Lands Ms. Tawanis Testart Project Manager, · Prairie and Northern Region Canadian Environmental Assessment Agency Canada Place SUITE 1145-9700 JASPER AVENUE EDMONTON ALBERTA T5J 4C3 Dear Ms. Testart ]AN 2 5 2015 VIA EMAIL GNWT comments on the Draft Guidelines for the Preparation of an Environmental Impact Statement for the Amisk Hydroelectric project The Government qf the Northwest Territories (GNWT) provides the following comments on the Draft Guidelines for the Preparation of an Environmental Impact Statement pursuant to the Canadian Environmental Assessment Act, 2012 for the Amisk Hydroelectric Project. We look forward to our discussions planned for February 9, 2016. Should you, or any of the parties to this environmental assessment, have questions about the GNWT's comments on the draft guidelines, please contact Lorraine Seale, Manager, Project Assessment Branch, at lorraine seale@gov.nt.ca or or Attachment or Melissa Pink, Project Assessment Analyst, at melissa pink@gov.nt.ca Sincerely, Lorraine Seale A/Director Land Use and Sustainability Government of the Northwest Territories, P.O. Box l 320, Yellowknife, NT Canada Xl A 2L 9 lauvj Typewritten Text <original signed by> lauvj Typewritten Text <contact lauvj Typewritten Text lauvj Typewritten Text lauvj Typewritten Text lauvj Typewritten Text information lauvj Typewritten Text removed> lauvj Typewritten Text <contact information removed> lauvj Typewritten Text Comment ID # EIS Guidelines Reference Comment Review er Link to Section 5 effect Agency Response 1 General Comment on EIS Guidelines a) Inclusive public consultation and the overall duty to consult ...

Attachment From Mikisew Cree First Nation and Athabasca Chipewyan First Nation to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 41
  • Submitted: 2016-01-25
  • From Mikisew Cree First Nation and Athabasca Chipewyan First Nation to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines
  • Attachment included
  • Athabasca Chipewyan First Nation Industry Relations Corporation 220A Taiganova Crescent Fort McMurray, AB T9K OT4 January 25,2016 Amisk Hydroelectric Project Canadian Environmental Assessment Agency 9700 Jasper Avenue, Suite 1145 Edmonton, Alberta T5J 4C3 Fax: 780-495-2876 CEAA.Amisk.ACEE@ceaa-acee. gc. ca Mikisew Cree First Nation Government and Industry Relations 8219 Fraser Avenue, Suite A Fort McMurray, AB T9H OA2 Re: Comments on the draft Environmental Impact Statement Guidelines for the Amisk Hydroelectric Project The Mikisew Cree First Nation ("MCFN") and the Athabasca Chipewyan First Nation ("ACFN") jointly provide this letter in response to the Canadian Environmental Assessment Agency's request for comments on the draft Environmental Impact Statement ("EIS") Guidelines on the proposed Amisk Hydroelectric Project (the "Project"). We have attached two documents to this letter which set out MCFN's and ACFN's comments on the draft EIS Guidelines being: a) a briefwritten submission from MCFN and ACFN; and b) "AHP Development Corporation Proposed Amisk Hydroelectric Project- Review of CEAA's Draft Guidelines for the Preparation of an Environmental Impact Statement", prepared by Aqua Environmental Associates dated January 25, 2016. We ask that the Agency respond to the comments and concerns raised in these materials by amending the EIS Guidelines as suggested in these documents. To the extent that MCFN's and ACFN's comments do not result in changes to the EIS Guidelines, we ask that the Agency explain, in writing, how these comments were considered and why the requested changes have not been made. Sincerely, t If' , Lisa Kil\f,"Direcfor, AtFN IRC Encls. ') ~ ,. ...

Attachment From the Métis Nation Bristish Columbia - Region 7 to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 51
  • Submitted: 2016-01-25
  • From the Métis Nation Bristish Columbia - Region 7 to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines
  • Attachment included
  • 30691 Simpson Road Abbotsford, BC, V2T 6C7 Tel: 604.557.5851 Fax: 604.557.2024 TF: 1.800.940.1150 www.mnbc.ca The Métis Nation British Columbia (MNBC) was incorporated under the BC Society Act in October of 1996. Métis Nation British Columbia is recognized by provincial and federal governments as well as the Métis National Council, as the Official Governing organization for Métis in the Province of British Columbia. Over 10,000 Métis Citizens in British Columbia are registered with Métis Nation British Columbia. January 25 2016 Subject: Métis Nation British Columbia’s review and comment on the draft Environmental Impact Statement guidelines for the proposed Amisk Hydroelectric project. MNBC currently represents over 11,500 citizens in British Columbia. There are numerous citizens in the region around the proposed project residing in Fort St John, Dawson Creek, and in other small communities around the Peace River. Métis in the area currently use the land and resources for traditional purposes. Utilizing the Métis Nation BC (MNBC) Traditional Harvesting Database and preliminary Métis Traditional Knowledge (MTK) research confirms that Métis Nation BC citizens, from adjacent Chartered Communities and nearby smaller communities, are exercising their Aboriginal right to harvest (hunt, fish, trap, gather plants) in and around the Peace River. The construction and operation of the proposed Amisk Hydroelectic project could put local Métis Aboriginal rights and traditional land-uses at risk. Métis harvesters who rely on the direct and surrounding area for sustenance, social and ceremonial purposes could see negative impacts from the construction and operation of ...

Attachment From Dene Tha' First Nation to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 43
  • Submitted: 2016-01-25
  • From Dene Tha' First Nation to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines
  • Attachment included
  • January 25, 2016 422 - 1080 MAI N LA N D STREET I VA NCO UVER, BC I V6 B 2T4 RE CEPTI O N SU ITE 300 I T 6 0 4 .681.4146 F 604.6 81.0959 Rosanne Kyle Direct : Email: rosanne@mandellpinder.com VIA EMAIL- Shauna.sigurdson@ceaa-acee.gc.ca I CEAA.Amisk.ACEE@ceaa-acee.gc.ca Canadian Environmental Assessment Agency Suite 1145, 9700 Jasper Avenue Edmonton, AB T5J 4C3 Attention: Shauna Sigurdson Regional Director Dear Ms. Sigurdson: Re: Dene Tha' First Nation (DTFN) - Comments on the draft Environmental Impact Statement Guidelines (EIS) on the proposed Amisk Hydroelectric Project ("Project") I am legal counsel to Dene Tha' First Nation ("Dene Tha'") and am writing to provide Dene Tha's comments on the draft Environmental Impact Statement {"EIS") Guidelines (" EISG" ). As a holder of Treaty 8 rights, one of Dene Tha' s most critical concerns in relation to the environmental assessment of the Project is that it properly assesses and addresses impacts to Dene Tha' constitutionally-protected Treaty rights. Dene Tha' has concerns that the approach set out in the draft EISG is not sufficient to ensure an adequate, let alone robust, assessment of impacts to its Treaty rights. Dene Tha' also has a number of technical comments on the EISG which are set out in the enclosed table . With respect to the assessment of effects to Aboriginal groups' rights and interests, section 5 of the draft EISG sets out that the proponent will be required to engage Aboriginal groups to develop its EIS for the Project . The draft Guidelines specify that the engagement must be on: • Effects of changes to the environment on Aboriginal peoples (health and socio-economic issues; physical and cultural heritage, including ...

Attachment From Fisheries and Oceans Canada to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 30
  • Submitted: 2016-01-25
  • From Fisheries and Oceans Canada to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines
  • Attachment included
  • From: Schwartz, Todd To: Amisk [CEAA] Cc: Janusz, Richard: DFO Subject: Draft EIS guidelines for Amisk Hydroelectric Project - DFO Comments Date: January 25, 2016 8:14:22 PM Attachments: DFO EIS comments table Amisk Hydro January 25, 2016.xlsx Amisk EIS guidelines DFO Comments Jan 25, 2016.docx Importance: High Hello Tawanis, Attached are DFO’s comments on the Amisk Hydroelectric Project. We have provided comments in a word document where larger sections of the DRAFT EIS guidelines were copied and edits made, and the Excel spreadsheet where only those bullets that we made edits to were included. DFO edits are in blue text. Please feel free to contact me if you have any questions. Todd Schwartz Telephone/ Téléphone: 204 983-4231 Facsimile / Télécopieur: 204 984-2404 Email / Courriel: Todd.Schwartz@dfo-mpo.gc.ca Fisheries Protection Biologist. Biologiste, Protection des Pêches Fisheries Protection Program. Programme pour la Protection des Pêches Winnipeg Office. Bureau de Winnipeg Central and Arctic Region. Région du Centre et de l’Arctique Fisheries and Oceans Canada. Pêches et Océans Canada 501 University Crescent. 501 University Crescent Winnipeg, MB R3T 2N6. Winnipeg (Manitoba) R3T 2N6 Government of Canada. Gouvernement du Canada For more information on Fish and Fish Habitat and DFO Reviews Visit our Website www.dfo-mpo.gc.ca/pnw-ppe/index-eng.html Fisheries and Oceans Canada has changed the way new project proposals (referrals), reports of potential Fisheries Act violations (occurrences) and information requests are managed in Central and Arctic Region (Alberta, Saskatchewan, Manitoba, ...

Attachment From Environment and Climate Change Canada to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 29
  • Submitted: 2016-01-25
  • From Environment and Climate Change Canada to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines
  • Attachment included
  • 1+1 Environment and Climate Change Canada Environnement et Changement climatique Canada Environmental Protection Operations Directorate (EPOD) Prairie & Northern Region (PNR) Eastgate Offices 9250 - 49th Street NW Edmonton, Alberta T6B 1 K5 January 25, 2016 Tawanis Testart Project Manager, Prairie and Northern Region Canadian Environmental Assessment Agency Suite 1145-9700 Jasper Avenue Edmonton, Alberta T5J 4C3 ECCC File: 4194-10-3/6191 CEAR Reference: 80112 Via email: CEAA.Amisk.ACEE@ceaa-acee.gc.ca RE: 80112 - AHP Development Corporation - Amisk Hydroelectric Project - Draft EIS Guidelines Attention: Tawanis Testart Environment and Climate Change Canada (ECCC) has completed a review of the following document provided by the Canadian Environmental Assessment Agency (the Agency) on December 16, 2015. • Draft Guidelines for the Preparation of an Environmental Impact Statement pursuant to the Canadian Environmental Assessment Act, 2012. Amisk Hydroelectric Project. AHP Development Corporation. ECCC comments, attached, are based on the departmental mandate in the context of the pollution prevention provisions of the Fisheries Act, the Migratory Birds Convention Act, and the Species at Risk Act. ECCC comments are focused on matters relating to migratory birds, species at risk and water quality. Comments are provided in consideration of the potential cumulative effects in association with the project; effects of changes to areas of the environment under ECCC's mandate on Aboriginal peoples; and the methodology of the assessment and effects of changes to the environment. ECCC recommends the spatial scope of the assessment include a consideration of how the operation of Amisk in ...

Attachment From Transport Canada to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 28
  • Submitted: 2016-01-22
  • From Transport Canada to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines
  • Attachment included
  • From: Testart,Tawanis [CEAA] To: Aguirre, Christopher Subject: RE: Amisk Hydroelectric Project - Commencement of a federal EA Date: January 22, 2016 5:05:00 PM No, this email is sufficient. Thanks, Chris! From: Aguirre, Christopher [mailto:christopher.aguirre@tc.gc.ca] Sent: January 22, 2016 2:52 PM To: Testart,Tawanis [CEAA] Subject: RE: Amisk Hydroelectric Project - Commencement of a federal EA Tawanis, TC has no comments regarding the Draft EIS Guidelines. I apologize, this is my first CEAA EA project, do you need TC to submit this in the EIS comments table? Chris Christopher Aguirre Environmental Officer, Environmental Affairs / Agent chargé de l'environnementale, Services environnementaux Telephone/telephone (204) 984-2615 Facsimile / télécopieur (204) 983-5048 Transport Canada, Prairie and Northern Region, 3rd Floor - 344 Edmonton Street, P.O. Box 8550, Winnipeg, Manitoba, R3C 0P6 Transports Canada, Région des Prairies et du Nord, 3e étage, 344, rue Edmonton, C.P. 8550, Winnipeg, Manitoba R3C 0P6 Government of Canada | Gouvernement du Canada From: Testart,Tawanis [CEAA] [mailto:Tawanis.Testart@ceaa-acee.gc.ca] Sent: Wednesday, December 16, 2015 4:58 PM To: graham.irvine2@canada.ca; Kane, Tamara: AANDC; Donato, Angela: NRCAN; Aguirre, Christopher; Schwartz, Todd: DFO; Fraser,Kathryn [Edm]; Boss,Shelly [Edm]; MacMillan, Stuart: PCA; Oates, Steve L: PCA; Archer, Timothy: NRCAN Cc: margot.trembath@gov.ab.ca; sherri.dunne@gov.ab.ca; melissa_pink@gov.nt.ca; lorraine_seale@gov.nt.ca; Amisk [CEAA] Subject: Amisk Hydroelectric Project - Commencement of a federal EA Good afternoon all, Project Review Update The Canadian Environmental Assessment Agency completed the screening of AHP ...

Attachment From Doig River First Nation to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 45
  • Submitted: 2016-01-21
  • From Doig River First Nation to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines
  • Attachment included
  • Doig River First Nation Bcm 56 RDse Prairie, B.C. VOC 2HO Pli: (250) 82'7-3'7'76 Fax: (250) 82'7-3'7'78 January 21, 2016 Shauna Sigurdson, Regional Director, Prairie and Northern Region -- - = CanadianEnvironrrrentaiAssessment-Agency~~- - - Canada Place ~:-~~~:=-. - - Suite=1145, 9?oo:JaspefAvenlle ::~:";~ :c::c::.::=:.:_ ==:c:--- --~, -- - --- - -- -- Eartrontcrn~ Alberta-T5j-4C3 _____ ---- ·--- ----- ------- Email: _____ _ - Re: Amisk Hydroelectric Project- Project Description Dear Ms. Sigurdson, Thank-you for your letter of December 16, 2015 regarding the draft Environmental - Impact Statement (EIS) Guidelines for AHP Development Corporation's proposed Amisk Hydroelectric-ProjeccpoigRiver FirsrNa!ion(DRFN) isproviding-thisletterin response to the Agency's request for comments on the EIS Guidelines. Our comments are attached to this letter. Referral to a Review Panel Your letter indicates that during the 60-day period following the commencement of the Environmental Assessment, the Minister of the Environment must decide whether or not to refer the Project to a review Panel further to s.38 of CEAA 2012. Having now reviewed and considered the project description, the Provincial EA terms of reference and the federal EIS Guidelines, and having gathered preliminary views from DRFN members, it remains our view that the number and complexity of environmental, social, economic, cultural and Treaty rights issues raised by the proposed Project merit review by a joint federal-provincial review panel. We believe that the probability of significant adverse environmental effects, as identified in our letter of November 6, is very likely even after the application of mitigation measures. ...

Attachment From Fort Chipewyan Métis Local 125 to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 49
  • Submitted: 2016-01-21
  • From Fort Chipewyan Métis Local 125 to the Canadian Environmental Assessment Agency re: Comment on the draft Environmental Impact Statement Guidelines
  • Attachment included
  • 1     Fort  Chipewyan  Métis  Local  125   Métis  Nation  of  Alberta   PO  Box  306,  Fort  Chipewyan   Alberta    T0P  1B0         January  21,  2016     Amisk  Hydroelectric  Project    Canadian  Environmental  Assessment  Agency    9700  Jasper  Avenue,  Suite  1145    Edmonton,    AB  T5J  4C3    Telephone:  780-­‐495-­‐2037    Fax:  780-­‐495-­‐2876    Email:  CEAA.Amisk.ACEE@ceaa-­‐acee.gc.ca       Re:    Fort  Chipewyan  Métis  Local  125  Comments  on  the  “Draft  Guidelines  for  the  Preparation  of  an   Environmental  Impact  Statement  (EIS)”  for  the  Amisk  Hydroelectric  Project       Dear  Sir/Madam:       The  Fort  Chipewyan  Métis  Local  125  (FCM)  has  reviewed  the  above  mentioned  document  for  the   purposes  of  providing  feedback  to  the  Canadian  Environmental  Assessment  Agency  (CEAA)  for   consideration  of  the  minimum  information  requirements  for  the  preparation  of  an  Environmental   Impact  Statement  (EIS)  for  a  designated  project    to  be  assessed  pursuant  to  the  Canadian  Environmental   Assessment  Act,  2012  (CEAA  2012).    FCM  has  provided  this  feedback  using  ‘track  changes’.    Please  note   that  we  have  also  made  a  number  of  references  to  the  provincial  draft  Terms  of  Reference  and  the   feedback  we  provided  on  that  document  and ...

Attachment From Al Rider to the Canadian Environmental Assessment Agency re: Comment on the Project Description

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 25
  • Submitted: 2016-01-19
  • From Al Rider to the Canadian Environmental Assessment Agency re: Comment on the Project Description
  • Attachment included
  • 1 Howe,Jennifer [CEAA] From: Amisk [CEAA] Sent: January 19, 2016 10:03 AM To: Cc: Howe,Jennifer [CEAA] Subject: Public Participation in the Amisk Hydroelectric Project Hi Al,    Thanks for speaking with me today. I wanted to provide you with a link to our website information on public  participation, including our Participant Funding Program, for your information. You can find the page here:  http://www.ceaa.gc.ca/default.asp?lang=En&n=8A52D8E4‐1    Also, from our conversation today on the phone, I took some notes and I would like to give you a chance to review what  I wrote down so you can confirm that I accurately heard your concerns about the Amisk Hydroelectric Project.     If the project causes changes to ice formation on the Peace River, and there is open water for longer period of  time in fall or spring months, this may increase the incidence of fog. Under freezing conditions, the fog can  condense and freeze around power lines, causing the lines to be damaged or break, and leading to increased  power outages in the area.   You own a hunting lodge downstream of the proposed location of the dam. You are concerned that an  obstruction in the Peace River will adversely affect your ability to travel on the Peace River by boat as you have  normally done. Also, you generally use the area for hunting and other recreational or subsistence activities and  are concerned that flooding may change your ability to use the area or the availability of resources.   As a resident of Fairview, AB, you are generally concerned about the sustainability of the river ecosystem and  the environmental health of the Peace River area.   ...

Attachment From Duncan's First Nation to the Canadian Environmental Assessment Agency re: Comment on Project Description

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 47
  • Submitted: 2015-11-19
  • From Duncan's First Nation to the Canadian Environmental Assessment Agency re: Comment on Project Description
  • Attachment included
  • Attention: Tawanis Testart Project Manager, Prairie and Northern Region Canadian Environmental Assessment Agency Edmonton, Alberta RE: PROPOSED AMISK HYDROELECTRIC PROJECT November 19,2015 Please note that DFN Chief and Council met this morning on the above-noted project and the Nation's expectations and preferences regarding "next steps" on the all-important environmental assessment and evaluation component. After reviewing the presentation from the DFN Traditional Knowledge and Monitoring Committee, who have been working closely and collaboratively with the project proponents over the past several months, it is recognized that our traditional and historical land and watercourse uses, fish, migratory bird and wildlife habitat, and both cultural and spiritual values could all be impacted, either directly or indirectly, by the project. Accordingly, the Nation's Aboriginal and Treaty Rights would also be impacted. Recommendation: To ensure proper and full due diligence in assessing these impacts, our position is that a full Environmental Impact Assessment process be required and undertaken. The Environmental Screeninit'brocess. bv itself. is not sufficient for this type of project. Donald TestawiCh Chiei Tony Testawich Councillor and Proiett Liaison Shane Pospisil Senior Advisor to Chief and Council Duncan's First Nation Box 148 Brownvale, Alberta TOH 1 LO lauvj Typewritten Text <original signed by> lauvj Typewritten Text <original signed by> lauvj Typewritten Text <original signed by> lauvj Typewritten Text lauvj Typewritten Text lauvj Typewritten Text

Attachment From Mikisew Cree First Nation and Athabasca Chipewyan First Nation to the Canadian Environmental Assessment Agency re: Comment on the Project Description

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 40
  • Submitted: 2015-11-16
  • From Mikisew Cree First Nation and Athabasca Chipewyan First Nation to the Canadian Environmental Assessment Agency re: Comment on the Project Description
  • Attachment included
  • From: Russell Noseworthy To: Amisk [CEAA] Cc: jack.flett@acfn.com; Melody Lepine; Lisa King; Sebastien Fekete; David Berrade; Russell Noseworthy Subject: Comments - Amisk Hydro Electric Project Date: November 16, 2015 8:48:00 PM Attachments: ACFN_MCFN Comments ltr to CEAA - Amisk Hydro Electric Project Final.pdf To who it may concern, Please find comments on the proposed AMISK HYDRO ELECTRIC project in the attached letter. For your consideration and action, these comments are submitted on behalf of the Mikisew Cree First Nation (MCFN) and the Athabasca Chipewyan First Nation (ACFN). If you have any questions or concerns about the information contained in our joint letter please contact Jack Flett ( ACFN) or Russell Noseworthy (MCFN). Regards, Russell Noseworthy Manager, Industry Relations MCFN Government & Industry Relations 8219 Fraser Avenue, Fort McMurray, AB T9H 0A2 Fax: 780-715-4098 Email: Russell.noseworthy@mcfngir.ca mailto:Russell.Noseworthy@mcfngir.ca mailto:CEAA.Amisk.ACEE@ceaa-acee.gc.ca mailto:jack.flett@acfn.com mailto:Melody.Lepine@mcfngir.ca mailto:lisa.king@acfn.com mailto:Sebastien.Fekete@mcfngir.ca mailto:david.berrade@int-env.ca mailto:Russell.Noseworthy@mcfngir.ca mailto:Russell.noseworthy@mcfngir.ca 1 Mikisew Cree First Nation Government and Industry Relations 206, 9401 Franklin Avenue Fort McMurray, AB T9H 3Z7 November 16th, 2015 Canadian Environmental Assessment Agency 160 Elgin Street, 22nd Floor Ottawa, ON K1A 0H3 [via email: CEAA.Amisk.ACEE@ceaa-acee.gc.ca] To whom it may concern, Re: Comments on the proposed Amisk Hydro Electric Project and Description The Mikisew Cree First Nation (“MCFN”) and the ...

Attachment From Parks Canada to the Canadian Environmental Assessment Agency re: Response to the Federal Authority Advice Record

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 39
  • Submitted: 2015-11-16
  • From Parks Canada to the Canadian Environmental Assessment Agency re: Response to the Federal Authority Advice Record
  • Attachment included
  • Federal Authority Advice Record Response due by: November 16, 2015 Amisk Hydroelectric Project — AHP Development Corporation Agency File No.: 005521 CEARNo.: 80112 Department/Agency: Parks Canada Agency EAContact Steve Oates Telephone: 604 666-0286 300 — 300 W Georgia Street Address: Fax: Vancouver, BC V6B 6B4 Email: Steve.oatespc.gc.ca (steve.oatescanada.ca from late Nov 2015 onwards) 1. (a) Indicate whether the description of potential environmental effects presented in the Project Description is sufficient in characterizing project effects to the components of the environment, as defined under section 5 of CEAA 2012, that relate to your mandate, including whether these effects may be adverse. Additional assessment is required to fully characterize potential project effects on the Peace Athabasca Delta. (b) Identify any additional potential adverse environmental effects of the Project that are not described in the Project Description and their linkage to components of the environment under federal jurisdiction (as defined under section 5 of CEAA 2012). PCA is interested in ensuring that the implications of incremental project impacts, and cumulative impacts, upon Peace River surface hydrology and ice-jam flooding events and the downstream effects of these upon the ecological integrity of the portion of the Peace-Athabasca Delta with Wood Buffalo National Park are fully considered. c) List any species at risk as defined by the Species at Risk Act (SARA) or species of conservation concern that have been assessed by COSEWIC that may be affected by the Project and are not identified in the Project Description. This information will inform the Agency’s Section 79(1) notification obligations under ...

Attachment From Canadian Parks and Wilderness Society to the Canadian Environmental Assessment Agency re: Comment on the Project Description

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 20
  • Submitted: 2015-11-16
  • From Canadian Parks and Wilderness Society to the Canadian Environmental Assessment Agency re: Comment on the Project Description
  • Attachment included
  • 1 Howe,Jennifer [CEAA] From: Alison Ronson Sent: November 16, 2015 3:48 PM To: Amisk [CEAA] Cc: environmental.assessment@gov.ab.ca Subject: Letter re Amisk Hydro Project Attachments: Ltr to CEAA re Amisk Nov 16 2015.pdf Dear Sir/Madam, Attached please find our letter outlining our concerns with the Amisk Hydroelectric Project proposed for the Peace River in Northern Alberta. For the reasons stated therein, CPAWS Northern Alberta submits that the CEAA must conduct an environmental assessment that takes into account the impacts of the project on Wood Buffalo National Park, Dunegan Wildland Provincial Park, and other areas of wilderness impacted by the project. Sincerely, Alison Ronosn Alison Ronson Executive Director CPAWS Northern Alberta www.cpawsnab.org SUPPORT CPAWS Northern Alberta Keeping Alberta Wild Since 1968 HoweJ Typewritten Text <email address removed> HoweJ Typewritten Text <contact information removed> PO Box 52031, Edmonton, Alberta T6G 2T5 780-424-5128 x 309  www.cpawsnab.org Keeping Alberta Wild Since 1968 Amisk Hydroelectric Project Canadian Environmental Assessment Agency 9700 Jasper Avenue, Suite 1145 Edmonton, AB T5J 4C3 Sent Via Email: CEAA.Amisk.ACEE@ceaa-acee.gc.ca November 16, 2015 Dear Sir/Madam, Thank you for providing the opportunity for the Canadian Parks and Wilderness Society's (“CPAWS”) Northern Alberta chapter to comment on the proposed Amisk Hydroelectric Project (the “Amisk Project”), located on the Peace River in northern Alberta. CPAWS is a charitable non-profit organization dedicated to the protection of Canada's public lands and waters. CPAWS Northern Alberta has worked for conservation in this province ...

Attachment From the Métis Nation Bristish Columbia - Region 7 to the Canadian Environmental Assessment Agency re: Comment on Project Description

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 50
  • Submitted: 2015-11-16
  • From the Métis Nation Bristish Columbia - Region 7 to the Canadian Environmental Assessment Agency re: Comment on Project Description
  • Attachment included
  • 30691 Simpson Road Abbotsford, BC, V2T 6C7 Tel: 604.557.5851 Fax: 604.557.2024 TF: 1.800.940.1150 www.mnbc.ca The Métis Nation British Columbia, first incorporated under the Society’s Act on October 23, 1996, is recognized by the provincial and federal government and the Métis National Council as the official governing organization in the province of British Columbia, representing over 8,000 provincially registered Métis citizens and a population of nearly 70,000 self-identified Métis people. 16 November 2015 Amisk Hydroelectric Project
 Canadian Environmental Assessment Agency 
 #1145, 9700 Jasper Ave 
Edmonton, AB T5J 4C3 
 Telephone: 780-495-2037 
Fax: 780-495-2876 
 CEAA.Amisk.ACEE@ceaa-acee.gc.ca Subject: Métis Nation British Columbia’s review and comment on the Determination of the Requirement for an Environmental Assessment of the Proposed Amisk Hydroelectric Project Métis Nation of British Columbia (MNBC) would like to thank the Canadian Environmental Assessment Agency (CEAA) for inviting comments. MNBC would like to comment on the potential impacts of the Project on the interests of Métis people in BC. Introduction MNBC currently represents over 11,000 Powley compliant Citizens (1000+ more/year) in British Columbia, with a large number residing in the Peace River region. The Métis have had an established community along the Peace River for more than 200 years and still use the land and resources for traditional purposes. Utilizing the Métis Nation BC (MNBC) Traditional Harvesting Database and preliminary Métis Traditional Knowledge (MTK) research confirms that Métis Nation BC citizens, from adjacent Chartered Communities and nearby smaller ...

Attachment From Fisheries and Oceans Canada to the Canadian Environmental Assessment Agency re: Response to the Federal Authority Advice Record

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 38
  • Submitted: 2015-11-16
  • From Fisheries and Oceans Canada to the Canadian Environmental Assessment Agency re: Response to the Federal Authority Advice Record
  • Attachment included
  • Federal Authority Advice Record Response due by: November 16, 2015 Amisk Hydroelectric Project- AHP Development Corporation Agency File No.: 005521 GEAR No.: 80112 DFO file number· 15-HCM-01323 Department/Agency: I Fisheries and Oceans, Canada (DFO) EA Contact Todd Schwartz Name: Address: 501 University Crescent Winnipeg, Manitoba R3T2N6 Email: Todd.Schwartz@DFO-MPO.GC.CA Telephone: 204-983-4231 Fax: 1. (a) Indicate whether the description of potential environmental effects presented in the Project Description is sufficient in characterizing project effects to the components of the environment, as defined under section 5 of CEAA 2012, that relate to your mandate, including whether these effects may be adverse. Yes. the Project Description is sufficient. It includes information that the project is likely to result in adverse effects including the Permanent Alteration and Destruction of fish habitat. and the death of fish which are prohibited under Paragraph 35(1) of the Fisheries Act. As well. DFO will have to consider effects on fish passage and associated requirements under S. 20 of the Fisheries Act. The environmental effects under CEAA 2012 that are to be taken into account in relation to the project are. as per. s. 5a)(i) a change to fish and fish habitat. (b) Identify any additional potential adverse environmental effects of the Project that are not described in the Project Description and their linkage to components of the environment under federal jurisdiction (as defined under section 5 of CEAA 2012). We expect the Environmental Impact Statement from the Proponent to have considerably more detail on impacts to fish and fish habitat. including mitigation and offsetting ...

Attachment From Sucker Creek First Nation to the Canadian Environmental Assessment Agency re: Comment on Project Description

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 52
  • Submitted: 2015-11-16
  • From Sucker Creek First Nation to the Canadian Environmental Assessment Agency re: Comment on Project Description
  • Attachment included
  • From: Rose Wong To: Amisk [CEAA]; Testart,Tawanis [CEAA] Cc: Mark Calliou; James Badger; Emily Calliou Subject: Re: Sucker Creek First Nation comments to Notification of CEAA 2012 Screening - proposed Amisk Hydroelectric Project - AHP Development Corp. Date: November 16, 2015 7:30:43 PM Attachments: scan0007.pdf ATT1390998.htm To: Tawanis Testart, Mark Calliou, Director of Consultation, Sucker Creek First Nation (SCFN), has forwarded the Canadian Environmental Assessment Agency’s (CEAA) notification of CEAA 2012 Screening - proposed Amisk Hydroelectric Project - AHP Development Corp. to me for review. On behalf of SCFN and its Consultation team, following are the comments the community has after reviewing the proposed Amisk Hydroelectric Project description - Executive Summary, and the opportunity to conduct a site visit of the proposed dam site via boating (offered by Amisk): SCFN does not have sufficient capacity and understanding of the project at this time to confidently provide a complete adequacy review of the proposed project. However, we seek to work with the project proponent, Alberta Environment and Park, and CEAA to ensure that the proposed project will not have any potentially direct or adverse impact to SCFN treaty rights and traditional uses. Section 1.5 does not address the inclusion of traditional environmental/ecological knowledge in the EIA methods; The proponent has conducted a site visit with SCFN by boat only. Unfortunately, Elders and community members participating in the site visit did not comprehend and were unable to visually see the overall proposed activity to be constructed in the Peace River nor were they able to see the vegetation that runs along the Peace River ...

Attachment From Alberta Wilderness Association to the Canadian Environmental Assessment Agency re: Comment on the Project Description

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 21
  • Submitted: 2015-11-16
  • From Alberta Wilderness Association to the Canadian Environmental Assessment Agency re: Comment on the Project Description
  • Attachment included
  • 1 Howe,Jennifer [CEAA] From: Carolyn Campbell Sent: November 16, 2015 6:18 PM To: Amisk [CEAA] Subject: AWA comments on Amisk hydro project and federal environmental assessment Attachments: 20151116_lt_awa_to_ceaa_amiskhp_federal_assessmt.pdf To the Canadian Environmental Assessment Agency:   Please see the attached letter.    Regards,  Carolyn Campbell  Conservation Specialist  Alberta Wilderness Association    "Defending Wild Alberta through Awareness and Action"    455‐12 St NW Calgary, AB T2N 1Y9  403.283.2025    www.AlbertaWilderness.ca  ******************************************************************    HoweJ Typewritten Text <email address removed> ALBERTA WILDERNESS ASSOCIATION "Defending Wild Alberta through Awareness and Action” 455 – 12 Street NW, Calgary, AB T2N 1Y9 Phone 403.283.2025 Fax 403.270.2743 Toll free 1.866.313.0713 awa@abwild.ca www.AlbertaWilderness.ca November 16, 2015 Amisk Hydroelectric Project Canadian Environmental Assessment Agency 9700 Jasper Avenue, Suite 1145 Edmonton, AB T5J 4C3 By E-mail: CEAA.Amisk.ACEE@ceaa-acee.gc.ca Dear Canadian Environmental Assessment Agency: Re: Amisk Hydroelectric Project and Environmental Effects Alberta Wilderness Association (AWA) appreciates this opportunity to comment on the Amisk Hydroelectric Project (“the Project”) and its potential environmental effects, to inform a Canadian Environmental Assessment Agency decision on whether a federal environmental assessment is required. Alberta Wilderness Association, founded in 1965, is an Alberta-based conservation group with 7,000 members and supporters in Alberta and around the world. AWA works to ensure the protection of Alberta’s ...

Attachment From Doig River First Nation to the Canadian Environmental Assessment Agency re: Comment on Project Description

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 44
  • Submitted: 2015-11-16
  • From Doig River First Nation to the Canadian Environmental Assessment Agency re: Comment on Project Description
  • Attachment included
  • Doig River First Nation ~56 Rose Prairie, B.C. VOC 2HO Ph: (250) 82'7-3'7'76 Fax: (250) 82'7-3'7'78 November 16, 2015 Shauna Sigurdson, Regional Director, Prairie and Northern Region Canadian Environmental Assessment Agency Canada Place Suite 1145, 9700 Jasper Avenue, Edmonton, Alberta T5J 4C3 Email: shauna.sigurdson@ceaa-acee.gc.ca Re: Amisk Hydroelectric Project- Project Description Dear Ms. Sigurdson, Thank-you for your letter of October 26, 2015 regarding AHP Development Corporation's proposed Amisk Hydroelectric Project. Doig River First Nation (DRFN) is providing this letter in response to the Agency's request for our preliminary views respecting the potential environmental effects and impacts of the proposed Project on our First Nation. Doig River First Nation DRFN is a Treaty No. 8 First Nation of the Peace River area. Our members are Dane- zaa (Beaver) and speak the Dane-zaa language. Our community is situated on I.R. No. 206, about 40 km northeast of Fort St. John, BC. The Dane-zaa historically exercised Treaty rights as part of a seasonal round, which included travel into northwestern Alberta with the Peace River serving as a primary transportation route. The ongoing presence of DRFN members and our ancestors in Alberta currently and historically is well known to those who work and live in the northwest region of the Province. In 1994, the Fort Dunvegan Historical Society contacted DRFN to participate in creating "Dunvegan: Where the Trails Cross", which describes the history of Fort Dunvegan as a Hudson's Bay Company trading post. This video recounts visits made by Dane-zaa to Dunvegan as part of the seasonal round, describing how the Dane-zaa shared the hunt, participated ...

Attachment From the Government of Northwest Territories to the Canadian Environmental Assessment Agency re: Comment on the Project Description

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 22
  • Submitted: 2015-11-16
  • From the Government of Northwest Territories to the Canadian Environmental Assessment Agency re: Comment on the Project Description
  • Attachment included
  • 1 Howe,Jennifer [CEAA] From: Melissa Pink < > Sent: November 16, 2015 3:10 PM To: Amisk [CEAA] Cc: Lorraine Seale Subject: GNWT comments on Amisk (registry number 80112) re: invitation for public comments Attachments: GNWT comments on Amisk (80112)_CEAAg request for public comments.pdf Follow Up Flag: Follow up Flag Status: Flagged Hello,  Please find attached correspondence from the GNWT regarding AHP Development Corporation’s Amisk project. If you  have any questions on this submission, please let me know.  Cheers,  Melissa    Melissa Pink Project Assessment Analyst Land Use and Sustainability Department of Lands, Government of the Northwest Territories Box 1320 Yellowknife NT X1A 2L9 http://www.lands.gov.nt.ca Tel: Fax: 867-765-0144 Email: This communication is intended for the use of the recipient to whom it is addressed, and may contain confidential, personal and/or privileged information. Please contact me immediately if you are not the intended recipient of this communication, and do not copy, distribute or take action relying on it. A communication received in error, or subsequent reply, should be deleted or destroyed.   HoweJ Typewritten Text <email address removed> HoweJ Typewritten Text <contact information removed> HoweJ Typewritten Text <email address removed> HoweJ Typewritten Text <original signed by> HoweJ Typewritten Text 22 - Government of NWT email 22 - Government of NWT Attachment

Attachment From Heide Blackmore to the Canadian Environmental Assessment Agency re: Comment on the Project Description

  • Amisk Hydroelectric Project
  • Author: Administration
  • Reference number: 19
  • Submitted: 2015-11-15
  • From Heide Blackmore to the Canadian Environmental Assessment Agency re: Comment on the Project Description
  • Attachment included
  • 1 Howe,Jennifer [CEAA] From: Ryan Blackmore Sent: November 15, 2015 9:58 PM To: Amisk [CEAA] Subject: Amisk Hydroelectric Project Attachments: CEAA Nov 15, 2015.pdf Hello Karen Fish  Please find attached a letter of concern about the Amisk Hydro Project and the need for a federal environmental  assessment.  Thank you for the opportunity to submit comments.  Could you please confirm that you received and were able to open the attachment, and whether you need a signed  copy?  Thanks very much  Heide Blackmore  HoweJ Typewritten Text <email address removed> H. Blackmore Page 1 November 15, 2015 Amisk Hydroelectric Project Canadian Environmental Assessment Agency 9700 Jasper Avenue, Suite 1145 Edmonton T5J 4C3 Hello Karen Fish Thank you for the opportunity to comment on the summary of the project description for the Amisk Hydroelectric Project. I read the document several times and admire the writing, but am of the opinion that details about the environmental impacts are a bit sketchy and that the document does not describe adequately how the proponent intends to mitigate impacts . I care about this project because I grew up on the banks of the Peace River and still own a quarter (SE 5- 83-6W6) in the proposed project area where I reside periodically in the summer. I heard about the Amisk proposal in October while visiting neighbors; I have had no direct contact from the proponent, despite an email to them. For your information, my father and his brother came to Canada in the late twenties, to homestead and then farm west of Fairview in the Lubeck/Royce district; as homesteaders they hunted and fished along the Peace, ate onions on the sunny dry south facing banks in ...