Attachment Draft Decision Statement and Draft Analysis Report dated June 18, 2024.

  • Greenstone Mine Project
  • Author: Administrator on behalf of Ginoogaming First Nation
  • Reference number: 62
  • Submitted: 2024-07-12 - 2:44 PM
  • See the attached submission / Veuillez consulter la pièce ci-jointe   
  • Attachment included
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Greenstone Gold Mines c/o Stephen Lines, Manager, Environmental Assessment and Permitting 2381 Bristol Circle, Suite B203 Oakville, Ontario L6H 5S9 for the Hardrock Gold Mine Project Description of the Designated Project Greenstone Gold Mines is proposing the construction, operation, decommissioning and abandonment of an open-pit gold mine and on-site metal mill located approximately five kilometres south of Geraldton, Ontario, at the intersection of Highway 11 (Trans-Canada Highway) and Michael Power Boulevard. As proposed, the gold mine would have an ore production capacity of 30,000 tonnes per day, and the metal mill would have an ore input capacity of 30,000 tonnes per day. Conduct of the environmental assessment The Canadian Environmental Assessment Agency (the Agency) conducted an environmental assessment of the Designated Project in accordance with the requirements of the Canadian Environmental Assessment Act, 2012. The Agency commenced the environmental assessment on June 13, 2014 and submitted its report to me in my capacity as Minister of Environment and Climate Change. Decision on environmental effects referred to in subsection 5(1) of the Canadian Environmental Assessment Act, 2012 In accordance with paragraph 52(1)(a) of the Canadian Environmental Assessment Act, 2012, after considering the report of the Agency on the Designated Project and the implementation of mitigation measures that I consider appropriate, I have determined that the Designated Project is not likely to cause significant adverse environmental effects referred to in subsection 5(1) of ...
  • Attachment included
  • 1 Impact Assessment Agency of Canada DRAFT ANALYSIS OF GREENSTONE GOLD MINES ’ PROPOSED CHANGES TO THE HARDROCK GOLD MINE PROJECT (TEMPORARY WATER BY- PASS CHANNEL) JUNE 2024 2 Table of Contents 1. Introduction ......................................................................................................................................... 3 2. Context ............................................................................................................................................... 3 3. Project Change ................................................................................................................................... 4 4. Analysis under the Physical Activities Regulations ............................................................................ 4 5. Assessment of potential adverse environmental effects .................................................................... 5 5.1 Fish and fish habitat .................................................................................................................. 5 5.1.1 Proponent’s Assessment ...................................................................................................... 5 5.1.2 Views Expressed ................................................................................................................... 5 5.1.3 Agency’s Analysis and Conclusions...................................................................................... 5 5.2 Migratory birds ........................................................................................................................... 6 5.2.1 Proponent’s assessment ...
  • Attachment included
  • Uncontrolled when Printed HP-GGM-EV-119-1014_0 Page 1 of 18 Greenstone Mine Proposed Project Change HP-GGM-EV-119-1014_0 November 28, 2023 Date Rev Status Prepared By Checked By Approved By 11/28/2023 0 Final Signature: Name: Stantec Stantec / Greenstone Mine Kendra Button Greenstone Mine <Signature removed> Uncontrolled when Printed HP-GGM-EV-119-1014_0 Page 2 of 18 Table of Contents 1 Introduction ........................................................................................................................ 4 2 EIS/EA Conditions ................................................................................................................ 7 3 Description of the Proposed Change ................................................................................... 7 4 Consultation and Engagement ............................................................................................ 8 5 Assessment of Effects ........................................................................................................ 10 5.1 Wildlife and Wildlife Habitat ................................................................................. 11 5.2 Traditional Land and Resource Use ....................................................................... 12 5.3 Fish and Fish Habitat ............................................................................................. 13 5.4 Hydrogeology ........................................................................................................ 13 5.5 Hydrology .............................................................................................................. 14 5.6 ...
  • Attachment included
  • Strategic Policy and Programs Politiques et programmes stratégiques 160 Elgin St., 22nd floor 160 rue Elgin, 22e étage Ottawa, ON K1A 0H3 Ottawa (Ontario) K1A 0H3 www.canada.ca/iaac www.canada.ca/aeic June 18, 2024 Sent by email Chief Sheri Taylor Ginoogaming First Nation P.O. Box 89 Longlac, ON, P0T 2A0 sheri.taylor@ginoogamingfn.ca Dear Chief Sheri Taylor: Subject: Advance invitation to comment on proposed changes to the Hardrock Gold Mine Project and Decision Statement On November 28th, 2023, Greenstone Gold Mines (the Proponent) informed the Impact Assessment Agency of Canada (the Agency) of their proposed changes to the Hardrock Gold Mine Project (the Project) as per condition 2.14 of the Decision Statement (issued on December 10, 2012 and amended on February 10, 2021). The Agency invites your comments on the proposed changes to the Project and the Decision Statement by July 10, 2024. Proposed Changes to the Project The Proponent expanded the Project Development Area (PDA) by 6.46 hectares to accommodate a temporary by-pass channel that will divert flows around the Goldfield Creek Diversion (GFCD) channel allowing for the re-design and remediation of the failed channel. The temporary by-pass channel is regarded as a temporary feature, with an estimated in-service life of 5 years. It will remain in active service until the GFCD channel has been restored, vegetated, and is considered stable enough to receive flow. Request for Comments The Agency prepared a draft Analysis Report that includes draft proposed changes to the Decision Statement (see Enclosure 1) and invites Ginoogaming First Nation to review ...

Report

Attachment Stop this mine!

  • Greenstone Mine Project
  • Author: Nicole Corrado
  • Reference number: 61
  • Submitted: 2024-07-07 - 7:25 AM
  • Participation notice: Public notice - Public Comments Invited on Proposed Amendments to the Decision Statement
  • Please say NO to the Gold Project.  Gold mining involves the use of cyanide, which is deadly to all life.  Indigenous peoples live here.  Their homes would be destroyed, and they would be subject to the toxicity of mining.  The mine would also destroy the habitats of fish, birds, woodland caribou, pine martens, and plenty of other animals. During this climate emergency, we can not afford to destroy forests and wildlife habitat.     Gold mining is harmful to all life, and to the planet.  Forcing fish and birds to be exposed to the effluent, and cutting them up to test them for selenium and other pollutants is cruel and outdated.  Canada is phasing out toxicity testing on animals.  Please switch to animal free methods of testing effluent and other substances.  For wild fish and birds, please stop lethal sampling and switch to humane non lethal bio monitoring like is done in humans. https://www.change.org/p/stop-testing-sewer-water-on-laboratory-fish   Please do not build another gold mine.  We are in the midst of a climate crisis. This proposal, which would damage and destroy the homes of black bears, caribou, birds, fish, and many animals, is terrible.  And gold mines destroy all sorts of animals in laboratory testing of their effluents, and in lethal sampling of birds, fish, frogs, etc.  We do not need more gold mines. Please preserve the trees at this location.  Please do not build on an area that has a lot of trees, and do not build on a wetland either.  Please do not harm animals with this project. Please do not use animal testing for pollution monitoring.  It mentions that ...

Report