Search Registry

Registry Search Mobile

Registry Search

Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. The map depicts assessments that identify at least one location. Users should consult the list to view all results that correspond to the search criteria.

Skip to Filters

269 results

Project Artillery Storage Shed, Halifax Citadel National Historic Site

  • Location (Halifax Citadel National Historic Site, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90650
  • Last Modified: 2026-07-17
  • Relevance: 799.69
  • The purpose of this project is to establish a purpose-built, on-site winter storage facility to eliminate the logistical challenges associated with the current off-site storage arrangement. The installation of a prefabricated storage structures (sea containers) within the Halifax Citadel ditch would be completed to provide a secure, winter storage for field guns, swivel guns, and related equipment. The facility would be equipped with electrical service, insulation, and heating to protect ...

Project Water Distribution Expansion Project, Sable Island National Park Reserve

  • Location (Sable Island National Park Reserve of Canada, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90649
  • Last Modified: 2026-07-17
  • Relevance: 799.69
  • The proposed work is to expand the Main Station water distribution system to provide water to the Carpentry Shop and the Garage. The project will improve operational efficiency, provide dedicated handwashing and cleaning option within the Carpentry Shop, and re-establish water service to the Garage for vehicle washing. The proposed work includes installation of water supply lines from Visitors Quarters (Vis Q), a utility sink and on demand water heater in the Carpentry Shop, a small wastewater ...

Project Beaver Brook Camp

  • Location (Akami-Uapishk?-KakKasuak-Mealy Mountains National Park Reserve, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90558
  • Last Modified: 2026-07-17
  • Relevance: 799.63
  • The purpose of this project is to develop a cultural gathering space and multipurpose camp for Innu and Inuit communities in the Akami-Uapishk?–KakKasuak–Mealy Mountains National Park Reserve. The camp will include a campsite with several tent pads designed for use by Innu, Inuit, and general visitor use. It will also feature floating docks and boardwalks, with solar lighting installed along the boardwalks to improve accessibility while minimizing impacts on sensitive environmental ...

Project Raphael Bridge Scour Protection Project - 2026

  • Location (Kouchibouguac National Park of Canada, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90556
  • Last Modified: 2026-07-16
  • Relevance: 799.52
  • Raphael Bridge, a public pedestrian and cycling crossing located over Fontaine River in Kouchibouguac National Park, New Brunswick, requires slope stabilization due to the loss of scour protection as a result of natural erosion. The proposed work will include installation of geotextile and grouted R50 riprap at the bridge abutments, as well as R100 riprap upstream and downstream of the bridge. The project is expected to take approximately three weeks to complete, with construction beginning in ...

Project Settlers Road Widening

  • Location (Kootenay National Park of Canada, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90641
  • Last Modified: 2026-07-15
  • Relevance: 799.46
  • The proposed project will widen the single-lane section to accommodate two-lane traffic. As well, widen two nearby sections of road to improve the line of site and road safety. The project location is between kilometre five and six and begins at approximately 50°40'6.72"N 115°51'14.87"W. The scope of work includes tree and vegetation removal, slope excavation, and debris removal.

Project Spruce River Dam Spillway Project

  • Location (Prince Albert National Park of Canada, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90637
  • Last Modified: 2026-07-14
  • Relevance: 799.37
  • The Spruce River Control Structure, built in 1960 by the Prairie Farm Rehabilitation Administration, regulates flow on the Spruce River and diverts water to Emma Lake and Christopher Lake to maintain recreational water levels. The structure is located about 55 km northwest of Prince Albert, Saskatchewan, near the south end of Anglin Lake. WSA requires the stilling basin and spillway slab to be isolated, dewatered, cleaned, and maintained in inspection-ready condition to support a structural ...

Project Whistlerville Staff Accommodation Rebuild

  • Location (Jasper National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90630
  • Last Modified: 2026-07-14
  • Relevance: 799.34
  • This project will be assessed with a basic impact assessment. Parks Canada is proposing to rebuild the Whistlerville staff housing units that were lost in the 2024 Jasper Wildfire. The new staff housing units will be located at the south end of the former Marmot Meadows group camp area in Jasper National Park. The housing will be designed for three-season use and will be connected to existing utilities that serve Whistler's Campground and other nearby visitor facilities. The project will ...

Project Carma Farms Barn Expansion

  • Location (Rouge National Urban Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90550
  • Last Modified: 2026-07-12
  • Relevance: 799.08
  • The proponent is requesting the construction of a building addition to the southern side of an existing barn that is currently being used as a storefront for Carma Farms (11471 Ninth Line) within Rouge National Urban Park. The proposed project area currently features a barn, produce market, outbuildings, and farm animal feeding experience. The proposed additional structure includes a storage area, kitchen, open indoor area, and covered patio. This structure would be built upon ...

Project Trail improvements for cross-country skiing in the Anse-au-Griffon Valley

  • Location (Forillon National Park, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90551
  • Last Modified: 2026-07-12
  • Relevance: 799.08
  • A concessionaire in Forillon National Park operates a cross-country skiing program in the Anse-au-Griffon Valley area. To prepare the trails used for this activity, the concessionaire has asked the park's trail team to make improvements to the trails. The project therefore, includes several minor improvements: 1: To prevent long-term damage to the trail caused by high soil moisture, the trail base will be raised by adding granular material. This raising of the base does not encroach on ...

Project Private Resident, Building modification, Trent-Severn Waterway

  • Location (Trent-Severn Waterway National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90546
  • Last Modified: 2026-07-11
  • Relevance: 798.97
  • Removal of portion of existing storage building and repair with new wall on a new reinforced concrete slab. Remove wood frame decks over land owners property line on water side. Remaining decks will be located within property line and over an existing concrete slab. Existing shoreline to remain unaltered. The work involves installation of small cofferdam to work in the dry.

Project Fortis Marmot Place Secondary Cable Upgrades

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90544
  • Last Modified: 2026-07-11
  • Relevance: 798.97
  • Fortis is planning maintenance work on Marmot Place in the Town of Banff. The project will upgrade the local power system to improve service for nearby homes. Work includes installing a new ground-level transformer, replacing old power cables, and adding two new power pedestals. Some outdated equipment will be removed or taken out of service. Crews will also reconnect the streetlight to the new system and make minor upgrades.

Project Shorepine Bog Trail Revitalization

  • Location (Pacific Rim National Park Reserve of Canada, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90625
  • Last Modified: 2026-07-10
  • Relevance: 798.93
  • The Shorepine Bog Trail is an approximately 800 m loop boardwalk, originally constructed in 1986, that provides a short, immersive experience through a rare and sensitive coastal bog ecosystem in Pacific Rim National Park Reserve. Over time, the boardwalk has deteriorated, resulting in uneven surfaces, misaligned sections, abrupt elevation changes, and damaged treads. These conditions have reduced accessibility, and the trail no longer meets current accessibility standards. This project ...

Project Field Community Wildfire Risk Reduction and Boulder Creek Fire Guard

  • Location (Yoho National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90538
  • Last Modified: 2026-07-10
  • Relevance: 798.86
  • The objective of this project is to reduce the wildfire threat to the community of Field and surrounding areas by improving fire resilience within Yoho National Park. The Boulder Creek Fire Guard portion of the project will also serve as a containment line to support fire suppression strategies in the event of a wildfire or the containment boundary as part of a prescribed fire.

Project Sunshine Village Sunshine Coast Improvements

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90509
  • Last Modified: 2026-07-10
  • Relevance: 798.86
  • Sunshine Village is proposing improvements to sections of the Sunshine Coast ski run located on Goat's Eye Mountain. The proposed Sunshine Coast Traverse will extend approximately 1,060 metres in length, oriented generally northwest to southeast, with an average running width of 10 metres. Construction of the traverse will require approximately 6,700 m³ of fill, placed adjacent to the existing run. The total estimated disturbance footprint (cut and fill, and improved skiway) is 13,400 ...

Project Town of Banff 26DP51 226 Bear Street Fourth Storey Addition

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90534
  • Last Modified: 2026-07-10
  • Relevance: 798.86
  • The proponent plans to add a fourth storey for residential use to the existing building at 226 Bear Street. Work will include removing the current roof and constructing the new storey within alignment of the existing roofline. The building exterior will also be updated with new finishes, such as paint and siding.

Project Aquatic Restoration – Babel Creek, Consolation Lakes, Corral Creek, Fish Creek and Mosquito Creek

  • Location (Detailed Impact Assessment, Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90535
  • Last Modified: 2026-07-10
  • Relevance: 798.86
  • Parks Canada proposes to remove non-native fish species from Consolations Lakes and Upper Babel Creek, Corral Creek, Fish Creek and Mosquito Creek in Banff National Park and to reintroduce Westslope cutthroat trout and Bull trout where they were historically present. This proposal considers fish translocation from source populations and long-term monitoring to ensure self-sustaining populations are established in the recipient waterbodies. This aquatics restoration program will occur over a ...

Project Town of Banff 26DP63 420 Muskrat Street Redevelopment

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90622
  • Last Modified: 2026-07-09
  • Relevance: 798.82
  • The proponent proposes redeveloping 420 Muskrat Street from a single dwelling to the creation of 18 units. The development will include: demolition of existing single-family home, construction of 3 new buildings, installation of utilities and site landscaping.

Project Highway 93A Mile 5 Hill Slope Stabilization

  • Location (Jasper National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90524
  • Last Modified: 2026-07-08
  • Relevance: 798.64
  • Parks Canada is proposing slope stabilization work along Highway 93A in Jasper National Park, at a location commonly known as Mile 5 Hill. The slope extends for 1 kilometer beside the roadway and is experiencing erosion and rockfall hazards that have increased since the 2024 Jasper Wildfire. A site-specific, targeted approach will be used to address different areas of instability along the slope, rather than applying a single solution across the entire site. Potential activities include a range ...

Project Edith Cavell Road KM 1.6 Slope Stabilization

  • Location (Jasper National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90523
  • Last Modified: 2026-07-08
  • Relevance: 798.64
  • Parks Canada is proposing slope stabilization work along Edith Cavell Road in Jasper National Park, at a location where the existing slope stabilization measure, an interlocking concrete block retaining wall, is beginning to fail due to increased erosion of the slope above following vegetation loss during the 2024 Jasper Wildfire. A site-specific, targeted approach will be used to address the area of instability, including slope flattening and the installation of an engineered control measure ...

Project ATCO Spray River Replace

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90614
  • Last Modified: 2026-07-06
  • Relevance: 798.5
  • The Spray River Replacement Project will upgrade a section of the Banff Transmission Line between the Spray River crossing and Banff Gate Station to enable in-line inspection and improve maintenance. The river crossing will be replaced using horizontal directional drilling, while other sections will be installed by open-cut methods. A temporary steel bypass pipeline will maintain gas service during construction. The existing 1951 pipeline will be cleaned, grouted, capped, and abandoned in ...

Project Rideau Canal Wall Repairs

  • Location (Rideau Canal National Historic Site, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90504
  • Last Modified: 2026-07-05
  • Relevance: 798.32
  • This project involves rehabilitation of a section of vertical concrete retaining wall that is part of the Rideau Canal National Historic Site. The site is owned and operated by the Ontario Waterways Unit of the Parks Canada Agency. The project includes the rehabilitation of approximately 100 meters of the east canal wall section located along Colonel By Drive near Clegg Street, in Ottawa, Ontario. The proposed repairs would return the wall section to a "good condition" and includes ...

Project Town of Banff 26DP34 134 Muskrat Street Addition of Detached Garage

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90602
  • Last Modified: 2026-07-03
  • Relevance: 798.17
  • The homeowner of 134 Muskrat Street has proposed a new detached garage at the rear of the property on an existing gravel parking area. The garage will have a 12-inch-thick slab-on-grade foundation. Its approximate dimensions will be 22 x 18 ft and 11 ft tall.

Project Mayhemigew Bog Restoration

  • Location (Pituamkek National Park Reserve, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90598
  • Last Modified: 2026-07-03
  • Relevance: 798.14
  • The Mayhemigew Bog Restoration Project will restore a few acres of previously harvested peatland to re-establish a functional, self-sustaining bog ecosystem. The project will be implemented in phases, beginning with site preparation, including vegetation removal and surface profiling. Sphagnum moss and other peatland vegetation will then be collected from a donor bog and applied across the site. Straw mulch and a targeted application of fertilizer will support plant establishment. Hydrological ...

Project Flowerpot Marl Bed Trail Restoration

  • Location (Fathom Five National Marine Park of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90516
  • Last Modified: 2026-07-03
  • Relevance: 798.1
  • This project involves the removal of 90 metres of boardwalk, three trail signs, and all mile marker signs along the Marl Bed Trail on Flowerpot Island, as well as the placement of natural deadfall and debris to camouflage the trail entrance. Due to the unique habitats and species found along the trail, and the impacts of visitor use (e.g., the creation of social trails), it was determined that the trail should be permanently closed and allowed to passively restore to a natural state. To support ...

Project Interior Fuel Storage

  • Location (Pukaskwa National Park of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90596
  • Last Modified: 2026-07-02
  • Relevance: 798.03
  • This project proposes the installation of a fuel storage site in the interior of Pukaskwa National Park for helicopter refuelling purposes. The proposed site is located at Cabin Lake. The project proposes to store 4 x 55-gallon barrels (total 220 gallons / 832 L) in a 1 m x 3 m aluminum containment box that is designed to store aviation fuel outdoors. This project would allow fire operation personnel to refuel helicopter(s) at a closer location than the current refueling location at the ...

Project Northgate-Riding Mountain National Park Trail Expansion

  • Location (Riding Mountain National Park of Canada, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90594
  • Last Modified: 2026-06-30
  • Relevance: 797.84
  • Riding Mountain National Park is considering a proposal from an external client, The Northgate Trails Inc., who are proposing a new, multi-use stacked trail system that will establish a formal connection with the existing Northgate Trail Network (26 km) located adjacent to the park. Construction will include 25 km of new trail built using sustainable trail construction best practices. A combination of raised-tread and bench-cut trail construction methods will be used to suit site-specific ...

Project Town of Banff 26DP48 408 Marten Street Development

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90593
  • Last Modified: 2026-06-30
  • Relevance: 797.84
  • The proponent proposes to construct a four-storey residential building containing 23 dwelling units at 408 Marten Street. The development will include:, building construction, installation of utilities, site landscaping, creation of 3 parking stalls and bike storage. Demolition is not included in this scope, as it was already completed under a separate impact assessment.

Project Town of Banff 26DP49 410 Banff Avenue Housing Development

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90592
  • Last Modified: 2026-06-30
  • Relevance: 797.84
  • The project proposed is for the demolition of an existing single detached home at 410 Banff Avenue, and the construction of a 5-unit multiplex with 5-bedrooms per unit. All structures and vegetation currently on the property (home, shed, trees) will be removed. The new building will be 4 storeys and will include a basement unit, but no underground parking garage. The timeline is unknown.

Project Emerald Lake Road Rock Scaling

  • Location (Yoho National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90589
  • Last Modified: 2026-06-29
  • Relevance: 797.73
  • The project involves direct and indirect slope stabilization works, including scaling, removal of scaled material from ditches, and tree debris removal along the upper slopes of Emerald Lake Road. This project is required to address engineer identified areas along the Category 4 road between the Trans Canada Highway and Emerald Lake. Emerald Lake is popular for visitors, with overnight and day users frequently driving the road and stopping. Slope stabilization is required as routine maintenance ...

Project Town of Banff Trail Lighting: Rec Grounds & Glen to Spray Ave.

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90588
  • Last Modified: 2026-06-29
  • Relevance: 797.73
  • The Town of Banff is proposing to install bollard trail lighting: along Glen Avenue to Spray Avenue to complete the nighttime route connection between the Muskrat St pedestrian bridge and Spray Ave. from the Nancy Pauw pedestrian bridge along the paved central pathway in the Recreation Grounds to the pavilion. Construction will consist mainly of shallow trenching for electrical conduit installation, local excavations for the concrete bases for each bollard, backfilling, and electrical ...

Project Annapolis Royal Living Shoreline

  • Location (Fort Anne National Historic Site of Canada, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90500
  • Last Modified: 2026-06-27
  • Relevance: 797.44
  • The Annapolis Royal Living Shoreline Project is a coastal restoration initiative that will restore a salt marsh degraded by long-term development along the Annapolis Royal waterfront, using a living shoreline approach to strengthen shoreline resilience and intertidal ecosystems. The restored salt marsh will reduce erosion and wave energy, helping stabilize the shoreline and support future climate adaptation. It will also enhance habitat for invertebrates, fish, and birds. The existing marsh ...

Project Bischof Islands Float Camp Rehabilitation

  • Location (Gwaii Haanas National Park Reserve and Haida Heritage Site of Canada, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90576
  • Last Modified: 2026-06-25
  • Relevance: 797.29
  • Parks Canada is proposing repair work at the Bischoff Islands float camp, which serves as a central logistical hub for operations throughout Gwaii Haanas. The float camp consists of two housing floats and two support floats and has been in service at its current location since 2015. No new structures will be added, and there will be no increase in footprint below the high-water mark. The project will include repairs to the flotation, moorage, float connections, walkways, and interior and ...

Project 2026-2029 Wildfire Risk Reduction Wasagaming

  • Location (Riding Mountain National Park of Canada, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90569
  • Last Modified: 2026-06-23
  • Relevance: 797.08
  • The project is focused around the townsite of Wasagaming in Riding Mountain National Park. The Wasagaming townsite is a commercial and cabin development approximately 150ha in area. There are four main areas within the Wasagaming townsite; the Wasagaming campground, the Clear Lake Cabin area (CLCA), the main cottage area and the business area. The Wasagaming townsite is mostly seasonal with an operating season for most businesses and leaseholders between May and October. There are a few ...

Project Johnston Canyon Rock and Soil Slope Remediation and Pier Repairs

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90567
  • Last Modified: 2026-06-22
  • Relevance: 796.95
  • Parks Canada is proposing rock and soil slope remediation along the Johnston Canyon Trail, which is part of an ongoing rockfall hazard management program and is intended to reduce rockfall-related safety risks to trail users. Remediation will include scaling, rock and debris removal, localized tree removal, rock bolts, rock dowels, and inspection/retightening of existing rock bolts. Work is also proposed at Catwalk 7 to repair deteriorated approach support piers. The repairs will address the ...

Project Municipality of Jasper – Columbarium and Cemetery Improvements

  • Location (Jasper National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90483
  • Last Modified: 2026-06-21
  • Relevance: 796.79
  • The Municipality of Jasper operates a municipal cemetery that is an important cultural landscape within Jasper National Park, and which is approaching its capacity for internments. The Municipality has proposed improvements to the cemetery with the following objectives: • Add overall capacity for emergency situations and long-term community needs • Expand burial capacity • Upgrade infrastructure and accessibility • Preserve heritage and sense of place • Consolidate and ...

Project Nassau Mills Dam Replacement, Trent-Severn Waterway

  • Location (Trent-Severn Waterway National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88838
  • Last Modified: 2026-06-18
  • Relevance: 796.46
  • The project is a complete replacement of the dam by a newly constructed sluiceway dam with an expected service life of 80 to 100 years. The scope of work includes phased reconstruction of the entire existing structure downstream of the existing dam. Project activities include, but are not limited to, constructing cofferdams, replacement of the dam, sluices, new stop logs, new decks, operator safety features, railing for public safety, new floating safety boom, landscape and embankment works, ...

Project Parks Canada Agency Sulphur Mountain Boardwalk Repairs

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90456
  • Last Modified: 2026-06-07
  • Relevance: 795.27
  • Parks Canada plans to complete various repairs along the Sulphur Mountain Boardwalk. The work will involve repairing concrete and sonotube foundations, as well as worn steel railing posts and vertical support frames. The repairs will take place in two phases over two summers. The first phase will occur in summer 2026 and will focus on steel repairs. This work is expected to last eight weeks. The second phase will take place in summer 2027 and will involve foundation repairs over a four-week ...

Project Petit-Gaspé Bridge embankment riprap rehabilitation

  • Location (Forillon National Park of Canada, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90447
  • Last Modified: 2026-06-05
  • Relevance: 795.05
  • Parks Canada is planning to carry out corrective work on the Petit-Gaspé Bridge embankments to ensure the stability and long-term durability of the infrastructure. The riprap installed during previous work completed in 2017 has undergone progressive erosion, particularly as a result of hydrological flooding and winter storms, causing some of the material to be displaced into the watercourse bed. Following a technical inspection carried out in 2025, recommendations were made to restore ...

Project Cascade Creek Restoration Large Woody Debris Installation

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90435
  • Last Modified: 2026-06-04
  • Relevance: 794.95
  • This project is part of the broader Cascade Creek Restoration Project, for which a Basic Impact Assessment (BIA) was approved by the Field Unit Superintendent in September 2018 (BNP 1008). The goal of this phase is to improve habitat suitability and instream cover for westslope cutthroat trout by adding large woody debris to the stream channel using post assisted log structures (PALS) and by felling select trees into the channel using a grip hoist. Instream cover is an essential habitat ...

Project Town of Banff 25DP108 Banff Trail Riders Visitor Interpretation Centre and Riding Arena

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90442
  • Last Modified: 2026-06-04
  • Relevance: 794.95
  • The Banff Trail Riders have proposed building a visitor interpretive centre and riding arena at 100 Sundance Road. The project will include removing several existing buildings across the site and combining their functions into a single, centrally located facility. It will also involve changes to the property's landscaping and underground utilities. Overall, the project aims to modernize the site, meet current health and safety requirements, and improve experiences for visitors and staff.

Project Pretty Channel Dams Stabilization

  • Location (Trent-Severn Waterway National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90413
  • Last Modified: 2026-05-28
  • Relevance: 794.19
  • The project involves stabilizing the current dam by installing post tensioned anchors on the spillway and placing rockfill on the downstream side of the Main Dam right abutment and the Side Dam. The rockfill will be ferried to the work site where an excavator will place it directly on the abutments. The post-tensioned anchors will be installed from the existing operating deck of the dam. The sectional barge will be outfitted with offboard spuds which anchors the barge to the lakebed. After the ...

Project Boundary Fence Upgrades - Kesler Lake and Highway 6 to the Waterton River

  • Location (Waterton Lakes National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90401
  • Last Modified: 2026-05-24
  • Relevance: 793.76
  • Parks Canada proposes two boundary fence improvement components in Waterton Lakes National Park: approximately 1.2 km of new fencing around Kesler Lake and approximately 1.3 km of drill stem fencing from Highway 6 to the Waterton River that will replace the existing cattle exclusion fence. The Kesler Lake component follows a new alignment and will require localized vegetation clearing, though use of existing open areas along the alignment will be prioritized. The drill stem component follows ...

Project City of Ottawa Eccolands Boat Launch Rehabilitation

  • Location (Rideau Canal National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90356
  • Last Modified: 2026-05-09
  • Relevance: 792.14
  • The project is the rehabilitation of the existing public boat launch at Eccolands Park which provides access to the Rideau Canal. The project involves removing the existing launch ramp and replacing it with a double lane, pre-cast and cast in place concrete boat launch. The added length and width will increase the boat launch footprint by 87.2m2 on the bed of the Rideau Canal.

Project Cap Saint Louis Wharf Repairs, 2026

  • Location (Kouchibouguac National Park of Canada, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90349
  • Last Modified: 2026-05-07
  • Relevance: 791.93
  • The Department of Fisheries and Oceans Canada has scheduled major repairs to the Cap Saint Louis wharf located in Kouchibouguac National Park. The project will involve significant updates to underlying and internal components including - but not limited to - timber pile repairs, maintenance of existing pile caps and pile cross-bracing, and replacement of outer wall sheathing. No additional structures will be added, and no expanse of the existing wharf footprint is planned for this project. To ...

Project Dredge of Rideau Canal Sediment at Pirate Cove Marina, 4340 Rideau River Road, Kemptville, ON

  • Location (Rideau Canal National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90341
  • Last Modified: 2026-05-01
  • Relevance: 791.29
  • The proposed dredging works at Pirate Cove Marina in Kemptville, Ontario are intended to address insufficient water depths at the entrance to the marina basin, which are currently causing vessels to bottom out and limiting safe public access from the Rideau River. The defined dredge area will be excavated to a target depth of 6 feet below the established navigational water level. Dredging will be carried out using hydraulic removal methods with an excavator positioned on a stable working ...

Project 339 Muskrat Street Accessory Dwelling (Town of Banff 25DP117)

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90332
  • Last Modified: 2026-04-30
  • Relevance: 791.18
  • Addition of a one-bedroom second storey accessory dwelling on top of existing accessory building (workshop constructed in 2011), maintaining the existing footprint, foundation, and first storey workshop and re-using the existing scissor trusses and some trim (e.g. cedar brackets) if possible. A deck and stairs will be added to allow direct access to the suite. No excavation is anticipated beyond what is required for footings to support the second storey deck and stairs. No tree pruning or ...

Project Lake Louise Fire Hall and Multi-Unit Residential Development

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90333
  • Last Modified: 2026-04-30
  • Relevance: 791.18
  • Infrastructure Alberta has proposed the development of a new fire hall and multi-unit residential building in Lake Louise, AB. The developments will be located at 105 Village Road and 100 Hector Road, respectively. The developments are initiated in response to the increasing wildfire risk, growing local population, and the need for enhanced emergency response and affordable staff housing in the region. The new fire hall is designed to replace the existing undersized facility, providing a ...

Project Redevelopment of 702 Connaught Drive - 7-Eleven Convenience Store and Gas Bar

  • Location (Jasper National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90323
  • Last Modified: 2026-04-26
  • Relevance: 790.75
  • The 7-Eleven convenience store and ESSO gas bar located at 702 Connaught Drive were destroyed during the 2024 Jasper wildfire. 7-Eleven proposes to redevelop the site, including demolition and removal of the remaining infrastructure, replacement of the underground storage tanks (USTs), and construction of a new convenience store and gas bar. In fall 2024, fuel was removed from the USTs and fire-impacted debris was removed from the surface of the site. Underground assets, including the USTs, ...

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Assessment Status Display Filters

Assessment Type Display Filters

Date modified: