Search Registry

Registry Search Mobile

Registry Search

Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. The map depicts assessments that identify at least one location. Users should consult the list to view all results that correspond to the search criteria.

Skip to Filters

124490 results

Project Canadian Forces Base (CFB) Edmonton Garrison Spray Park and Playground Construction

  • Location (Edmonton garrison, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90299
  • Last Modified: 2026-04-21
  • Relevance: 414.98
  • The Department of National Defence (DND) is proposing a project. The Department of National Defence (DND) is proposing the construction of a new spray park, new playground, and supporting infrastructures on vacant developed land south of Building 161.

Project Rehabilitation of a sports field and development of a training area, Desjardins Park, Gatineau

  • Location (Desjardins Park, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90386
  • Last Modified: 2026-04-21
  • Relevance: 414.98
  • As part of a redevelopment project at Desjardins Park, the City of Gatineau is proposing to refurbish a sports field and develop a training area to ensure user safety and offer complementary services, while enhancing the landscaping. The park is in the Hull–Wright district of Gatineau, Quebec. The proposed project would take place on land leased by the City of Gatineau from the National Capital Commission (NCC) and is subject to a federal approval of land use and design under the ...

Project OS-6908 Authorization to Construction and Operate a Surface Lease

  • Location (Frog Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90385
  • Last Modified: 2026-04-21
  • Relevance: 414.97
  • A surface lease consisting of 4.1 ha. area for drilling and operating a multiwell oil padsite will be constructed and maintained for the operating life of 20 proposed wells, then decommissioned and reclaimed before the lease agreement is surrendered. The project padsite will utilize a previously surveyed and recently reclaimed padsite, with an extension area to the west. The padsite has been located to utilize an existing access road and to avoid wetland areas. No fish bearing waterbodies or ...

Project Fish Habitat, Ojibway Shores, Detroit River, Windsor, ON

  • Location (Windsor, Detroit River, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90311
  • Last Modified: 2026-04-21
  • Relevance: 414.96
  • The Windsor Port Authority (WPA), a standalone federal agency, plans to install a series of barrier islands in the nearshore area off Ojibway Shores on the Detroit River in Windsor, Ontario, at Concession 1, Lots 52 and 53, Petite Cote, Sandwich Twp. The islands will reflect and reduce incoming waves from the Detroit River, which currently disturb nearshore fish habitat. The wave reduction will create a calm zone between the islands and the shore, improving fish habitat. Additionally, the rock ...

Project Potential Regional Assessment of Pickering Lands and Contiguous Areas

  • Location (Former Pickering Airport Lands, Southern Ontario (Durham Region, North of Hwy 407), Ontario)
  • Assessment Type: Request for regional assessment
  • Status: In progress
  • Reference Number: 90309
  • Last Modified: 2026-04-20
  • Relevance: 414.87
  • The Minister of the Environment, Climate Change and Nature received a request for a regional assessment of the Former Pickering Airport Lands (Pickering Lands) and Contiguous Areas, in Southern Ontario. The request focuses on the potential cumulative impacts of regional growth and associated major transportation and utility projects.

Project Peace River Nuclear Power Project

  • Location (Peace River, Alberta)
  • Assessment Type: Integrated assessment by Review Panel
  • Status: In progress
  • Reference Number: 89430
  • Last Modified: 2026-04-20
  • Relevance: 414.87
  • Energy Alberta is proposing the construction of up to four nuclear reactors, located approximately 30 kilometres north of the Town of Peace River, Alberta. As proposed, the Peace River Nuclear Power Project would cover 1,424 hectares in area and operate for approximately 70 years. The plant would generate up to 4,800 megawatts. The project assessment is being conducted in collaboration with the Canadian Nuclear Safety Commission.

Project Webequie Supply Road Project

  • Location (McFaulds Lake area - Eastern limit, Ontario) (Webequie First Nation - Western limit, Ontario)
  • Assessment Type: Impact Assessment by the Agency
  • Status: In progress
  • Reference Number: 80183
  • Last Modified: 2026-04-20
  • Relevance: 414.86
  • Webequie First Nation is proposing the construction and operation, including maintenance, of a 107-kilometre all-season road connecting the Webequie Airport and the McFaulds Lake area in northern Ontario. The corridor would be approximately 35 metres in width in order to accommodate a two-lane gravel surface industrial supply road and could enable future infrastructure development such as transmission lines and broadband. As proposed, the Webequie Supply Road Project would connect Webequie ...

Project Sidney Operations Centre Fuel System and Dock Replacement

  • Location (Gulf Islands National Park Reserve of Canada, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90384
  • Last Modified: 2026-04-20
  • Relevance: 414.86
  • The proposed project involves the replacement of the existing marine fuel storage and dispensing system and marine docks at the Sidney Operations Centre within Gulf Islands National Park Reserve. These facilities have reached the end of their service life and require replacement to ensure marine operations can continue to function safely and efficiently. The dock layout will remain largely unchanged, with the replacement of existing piles and the potential installation of one additional pile. ...

Project Laydown and Logistics areas

  • Location (Toronto Pearson International Airport, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90304
  • Last Modified: 2026-04-20
  • Relevance: 414.82
  • The Proposed Project: Laydown and Logistics areas As part of the Greater Toronto Airports Authority's (GTAA's) Toronto Pearson Airport Longterm Investment in Facilities & Terminals (LIFT) Program, logistics and laydown areas will be constructed on Airport Lands, to facilitate construction needs. The sites will consist of temporary construction trailers, worker parking lot, material laydown, equipment storage, and associated infrastructure to support Airport construction ...

Project ATCO Gas Main Installation for NEDA Commercial Stage 1, Millennium Phase 1, and Community Recovery Center

  • Location (Enoch Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90218
  • Last Modified: 2026-04-17
  • Relevance: 414.56
  • ATCO is proposing the installation of below-ground natural gas distribution pipe to service NEDA Commercial Stage 1, Millennium Phase 1 and the Community Recovery Center at Enoch Cree Nation. For NEDA Commercial Stage 1, project work will involve installation of approximately 775m of 168mm (6") and 1975m of 114mm (4") and 30m of 60mm (2") of polyethylene distribution mains in a 4-party shared joint trench with communications and power conduits. It will also include installation ...

Project Replace Main Entry Bridge – 14 Wing/CFB Greenwood

  • Location (14 Wing/CFB Greenwood, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90383
  • Last Modified: 2026-04-17
  • Relevance: 414.56
  • The Department of National Defence (DND) is proposing a project. The proposed Project consists of the replacement of the Main Entrance Bridge at 14 Wing Canadian Forces Base (CFB) Greenwood. The existing structure will be removed and replaced with a new bridge designed to meet current operational, safety, and infrastructure requirements while maintaining access to the base. The Project will be completed in several phases, including: Site Mobilization, including establishment of access, ...

Project Estacade, pier and deck repairs, Phase 2

  • Location (Estacade, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 89335
  • Last Modified: 2026-04-17
  • Relevance: 414.55
  • Built between 1964 and 1965, the Estacade was designed to control ice flow on the St. Lawrence River and reduce the risk of flooding and erosion on Île Notre-Dame and Île Sainte-Hélène. This structure spans 2040 metres between Île des Sœurs and the St. Lawrence Seaway dike. It is 18 metres wide. A dedicated bicycle and pedestrian path was added to the structure in 2015. The  Estacade is mainly used by emergency vehicles. Maintenance ...

Project Black Birch Heights Residential Development

  • Location (Tsuut'ina Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90382
  • Last Modified: 2026-04-16
  • Relevance: 414.45
  • Crystal Creek Homes is proposing to construct Black Birch Heights - a residential development located at Taza Park on Tsuut'ina Nation reserve lands. The approximately 11632 square metre development consists of two six storey buildings containing in total 345 units atop a single level parkade.  The lot for the proposed project is located on an already cleared and serviced and will therefore tie into existing water, storm, and sanitary services, use Tsuut'ina Nation public ...

Project Purchase and Install Trailers Real Property Operations – 14 Wing/CFB Greenwood

  • Location (14 Wing - CFB Greenwood, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90378
  • Last Modified: 2026-04-16
  • Relevance: 414.45
  • The Department of National Defence (DND) is proposing a project. DND is undertaking an infrastructure project for Real Property Operations (RP Ops) Detachment Greenwood to acquire and install ten temporary trailers due to the closure of 5 Hangar. The new trailer site will be located at 14 Wing Greenwood, within the 8100m2 field between 4 Hangar and 5 Hangar. The estimated total square footage of the trailers will be 1350 m2 and will include approximately 1155m2 of temporary paved access road. ...

Project Fort Frontenac Shore Wall Repair – Kingston

  • Location (CFB Kingston, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90381
  • Last Modified: 2026-04-16
  • Relevance: 414.45
  • The Department of National Defence (DND) is proposing a project. The proposed undertaking involves the rehabilitation of an existing concrete seawall at Fort Frontenac in Kingston, Ontario. The project will include the installation of a rock berm along the base of the wall to provide structural reinforcement, the localized removal and replacement of a deteriorated section of the wall, and the filling of voids of the existing structure with grout or concrete. Construction activities will involve ...

Project CDF Glycol Storage Structural Rehabilitation

  • Location (Toronto Pearson International Airport, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90380
  • Last Modified: 2026-04-16
  • Relevance: 414.44
  • The Proposed Project: CDF Glycol Storage Structural Rehabilitation This project involves the following: As part of the Greater Toronto Airports Authority's (GTAA's) Toronto Pearson Airport Longterm Investment in Facilities & Terminals (LIFT) Program, the proposed project addresses Rehabilitation of the CDF Glycol Storage Tanks and associated infrastructure. The CDF Glycol Storage Tank Rehabilitation Project encompasses the following key activities for Tanks ...

Project Wharf Reconstruction at the Bay Fortune Small Craft Harbour, Prince Edward Island

  • Location (Bay Fortune Small Craft Harbour, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90379
  • Last Modified: 2026-04-16
  • Relevance: 414.44
  • The Bay Fortune SCH layout is characterized by wharf infrastructure located on the north and south sides of Fortune River. The facilities on the southern side include a series of rigid wharves oriented to form a well-protected harbour basin. The southern wharves consist of seven (7) separate and conjoined structures including an inner timber pile marginal wharf (SCH Facility Number #410) measuring approximately 61.5 m in length and 3.7 m in width with a timber deck system.  The marginal ...

Project Water Main Replacement at the NRC - Montreal Road South Campus

  • Location (National Research Council of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90041
  • Last Modified: 2026-04-16
  • Relevance: 414.42
  • The scope of the project includes water mains replaced by either open-cut excavation, Cure-In Place-Pipe (CIPP), or a hybrid approach using both methods on NRC Montreal Road South Campus . The project consists of linear excavation of 2100 linear meter. The project includes tree removal. Trees are anticipated to be removed for this project and will be compensated as part of the project. The project work would take approximately five months from start to completion (May 2026 to November ...

Project Enlargement of the aerosol firing range road – DRDC Valcartier (Quebec)

  • Location (DRDC Valcartier, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90257
  • Last Modified: 2026-04-16
  • Relevance: 414.42
  • The Department of National Defence (DND) is proposing a project. The work will consist of clearing vegetation on the edge of the existing road on a distance of 800m, enlarging the road by a surface of 200m by 2m, enlarging a culvert by 2m long, and reprofiling the ditch.

Project Saddle Lake Cree Nation Pathway to Learning

  • Location (Saddle Lake Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90300
  • Last Modified: 2026-04-16
  • Relevance: 414.38
  • Saddle Lake Cree Nation is proposing the development of a new pedestrian walkway, called "Pathway to Learning", a 2850 meter long 3 meter wide paved pathway that will connect the nearby 40 Acre Housing Development to the Saddle Lake Townsite. The pathway will start at the western boundary of 40 Acre moving east following the south side of Highway 652,  and continuing south along the west side of 50th St up to the SW 1 Road. Amenities along the pathway will include way-finding and ...

Project Parking Lot Repaving at the Canada Post Mail Facility, Etobicoke, ON

  • Location (2110 Kipling Ave. Etobicoke, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90376
  • Last Modified: 2026-04-15
  • Relevance: 414.34
  • Canada Post is proposing to repave in phases approximately 2 500m² of the existing parking surfaces at the Canada Post mail facility in Etobicoke, Ontario. The current parking lot, located west of the building will be repaved. The work will be conducted within the rear parking area designated for Canada Post trucks. The work will include removal of the existing asphalt with repaving of new asphalt, resetting storm drains (as required) and repainting lines. Construction staging ...

Project Upgrade Fire Pumphouse at Aircraft Hangar (Building B052 / Hangar 10), CFB Trenton

  • Location (8 Wing, CFB Trenton, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90377
  • Last Modified: 2026-04-15
  • Relevance: 414.33
  • The Department of National Defence (DND) is proposing a project. The Department of National Defence is undertaking a project (Project) to upgrade the existing fire suppression system of an existing aircraft hangar (Building B052 / Hangar 10) with the construction of a new pumphouse building with an underground water storage tank and supporting infrastructure situated in the central portion of 8 Wing Canadian Forces Base (CFB) Trenton, Ontario (44.113316°, -77.532478). The Project lies on ...

Project New Fibre Installation

  • Location (Project site 1: Gitsegukla 1, British Columbia) (Project site 2: Gitwangak 1, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90369
  • Last Modified: 2026-04-15
  • Relevance: 414.33
  • City West Cable & Telephone Corp. plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in the Kitseguecla (Gitsegukla) community. The project involves the installation of approximately 10 km of underground and aerial fiber optic cable. The cable will be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments, but will be suspended on support structures to connect ...

Project New Fibre Installation - Nuchatlaht

  • Location (Project site 1: Nuchatlaht, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90368
  • Last Modified: 2026-04-15
  • Relevance: 414.33
  • City West Cable & Telephone Corp plans to install fiber optic cabling, for Internet purposes, to all residential homes in the Nuchatlaht community. The project involves the installation of approximately 1 km of fiber optic cable. The cable is to be attached to existing support structures such as utility/telephone poles that parallel existing roadways. Support structures may require structural improvements to support cable attachments.

Project Tl'azt'en Nation - Tache Indian Reserve #1 T6 Road Upgrade Project

  • Location (Tl'azt'en Nation - Tache Indian Reserve #1 T6 Road Upgrade Project, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90374
  • Last Modified: 2026-04-15
  • Relevance: 414.33
  • The Project area is located approximately 65 km northwest of Fort St. James, British Columbia, within the community of Tachie, BC, on Tache Indian Reserve No. 1, which is part of the Tl'azt'en First Nation. The reserve is situated along the northern shoreline of Stuart Lake and includes areas of forested land as well as cleared areas used for residences, community facilities, and local roadways. The Project involves upgrading a 1.7 km segment of the existing Tachie Road, which serves ...

Project New Fibre Installation - Kingcome (Dzawada'enuxw) First Nation

  • Location (Project site 1: QUAEE 7, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90367
  • Last Modified: 2026-04-15
  • Relevance: 414.33
  • City West Cable & Telephone Corp. plans to install underground and aerial fibre optic cabling, for Internet purposes, to all residential homes in the Kingcome (Dzawada'enuxw First Nation), (Quaee 7) community. The project involves the installation of approximately 2 km of underground and aerial fiber optic cable. The cable will be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments, but will be ...

Project Sea Island Conservation Area Dike Upgrade Project

  • Location (Richmond, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Terminated
  • Reference Number: 89740
  • Last Modified: 2026-04-15
  • Relevance: 414.32
  • Public Notice   Sea Island Conservation Area Dike Upgrade Project – Public Comments Invited   July 18, 2025 – The authorities must determine whether the proposed project is likely to cause significant adverse environmental effects. To help inform this determination, the authorities invite comments from the public respecting the determination. Written comments must be submitted by August 18, 2025.    Fish and Fish Habitat Protection Program ...

Project Decommissioning of the Gentilly-1 Waste Facility Project

  • Location (Bécancour, Quebec)
  • Assessment Type: Request for designation not applicable
  • Status: Completed
  • Reference Number: 90350
  • Last Modified: 2026-04-15
  • Relevance: 414.32
  • Canadian Nuclear Laboratories is proposing a project to decommission the Gentilly-1 Waste Facility in Bécancour, Quebec. The facility includes a partially decommissioned and permanently shutdown prototype nuclear reactor and supporting structures. As proposed, the project, which is being carried out on federal land, is divided into three phases. Phase 2, storage with surveillance, is currently under way. Phase 3 involves dismantling and decontaminating all remaining systems, ...

Project Halifax Gate – Removal of Fuel Tanks and Asbestos Disposal Cell

  • Location (1350 Main Rd, Eastern Passage, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90373
  • Last Modified: 2026-04-15
  • Relevance: 414.31
  • The Department of National Defence (DND) is proposing a project. Valero Energy Corp will be conducting removal of remaining infrastructure on Department of National Defence property near 1350 Main Road, Eastern Passage, Nova Scotia. Removals include a harbourside tank farm, associated piping, and a closed asbestos disposal cell. The tank farm consists of four large fuel tanks, piping, and miscellaneous small support structures. The Asbestos Disposal Cell is approx. 80m by 55m, and contains ...

Project Field Electrical Centres

  • Location (Toronto Pearson International Airport, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90061
  • Last Modified: 2026-04-15
  • Relevance: 414.31
  • This project involves the following: As part of the Greater Toronto Airports Authority's (GTAA's) Toronto Pearson Airport Longterm Investment in Facilities & Terminals (LIFT) Program, five new Field Electrical Centers (FEC) and associated infrastructure are proposed to be construction on the Airfield. These FEC buildings will be at five separate locations on the existing airfield. The function of the FEC's is to house electrical and telecommunication equipment that will ...

Project Reeve Slough Salmon Habitat Reconnection Project

  • Location (Reeve Slough, Coquitlam, BC, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90248
  • Last Modified: 2026-04-15
  • Relevance: 414.27
  • k?ik?????m (Kwikwetlem First Nation) are proposing to restore the hydraulic connection between the Reeve Slough and the Coquitlam River by constructing new inlet and outlet channels and excavating a low gradient pilot channel through Reeve Slough to reestablish downstream flows. The Project will involve dredging and regrading the Reeve Slough, construction of a new inlet and outlet channel, installation of aquatic and riparian habitat features, and replacement of a non-functioning ...

Project Jacques-Cartier Park North Electrical

  • Location (Gatineau, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90296
  • Last Modified: 2026-04-15
  • Relevance: 414.27
  • The National Capital Commission (NCC) is proposing electrical infrastructure upgrades at Jacques Cartier Park North (JCPN) located in Gatineau, Quebec, to support future largescale public events, such as, Winterlude and Canada Day (the Project). These improvements align with NCC priorities to enhance year-round animation and public programming along the Ottawa River shoreline as well as infrastructure planning guidelines from the NCC's National Capital Core Area Plan (2025). Initial Project ...

Project Xaxli'p First Nation Green Hydrogen Production Facility

  • Location (Xaxli'p Fountain IR1B, Lillooet, BC, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90180
  • Last Modified: 2026-04-14
  • Relevance: 414.25
  • Xaxli'p Development LP has partnered with Salish Elements to form the Xaxli'p Salish Limited Partnership (XSLP) with plans to build a 51% Xaxli'p-owned green energy utility to produce liquified hydrogen fuel.   This will require a Lease of Lot 9-2-1 on Fountain IR1B to XSLP for the purpose of a green hydrogen production facility.   Xaxli'pmec will vote on Monday, January 26, 2026, to determine if Lot 9-2-1 Fountain IR 1B will be ...

Project Dorval Very High Frequency Omni-Direction Range (VOR) Replacement

  • Location (Dorval (Quebec), Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90229
  • Last Modified: 2026-04-14
  • Relevance: 414.23
  • NAV CANADA proposes to replace the existing Standard Very High Frequency Omnidirectional Range (SVOR) navigation aid with a more modern Doppler Very High Frequency Omnidirectional Range (DVOR). The purpose of a VOR is to provide navigational aid to aircrafts operating in the area. This is part of NAV CANADA's Air Navigation Modernization Program which is designed to upgrade aging and obsolete technology with more modern versions. The site is comprised of, the VHF Omnidirectional Range ...

Project Construction and Land Exchange at Intersection of Conroy Road and Davidson Road, Ottawa

  • Location (Intersection of Conroy Road and Davidson Road, Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90372
  • Last Modified: 2026-04-14
  • Relevance: 414.23
  • The City of Ottawa's Intersection Control Measures Program has identified the need to modify the existing offset intersections of Conroy Road and Davidson Road due to poor traffic operations and road safety concerns. Following completion of a Schedule C Municipal Class Environmental Assessment it was determined that realignment of the east leg of Davidson Road, approximately 325 metres, is preferred to construct a single point intersection with a roundabout as the recommended traffic ...

Project Great Bear Gold Project

  • Location (23 kilometres southeast of Red Lake, Ontario)
  • Assessment Type: Impact Assessment by the Agency
  • Status: In progress
  • Reference Number: 85832
  • Last Modified: 2026-04-14
  • Relevance: 414.23
  • Kinross Gold Corporation is proposing the construction, operation, decommissioning and abandonment of a new open-pit and underground gold mine with an on-site metal mill, located 23 kilometres southeast of Red Lake, Ontario. As proposed, the Great Bear Gold Project would include two open-pits and produce up to 60,000 tonnes of ore per day, while the metal mill would process up to 15,000 tonnes of ore per day. The project would operate for about 20 years.

Project Rehabilitation work of Utshimauat Petashu and Manitou Streets

  • Location (Lot 5 062 511, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90371
  • Last Modified: 2026-04-14
  • Relevance: 414.23
  • Utshimauat Petashu Streets (East and West) and a section of Manitou Street, including the existing potable water, sanitary sewer, storm sewer, and wastewater overflow systems, require rehabilitation work. A storm sewer system will also be added to the western section of Utshimauat Petashu Street. The addition of this storm sewer system, including the installation of a catchment downstream of an existing wetland, aims to regulate stormwater from the low-quality wetland so as not to compromise ...

Project Canadian Forces Ammunition Depot (CFAD) Rocky Point Building RP138 Remediation and Fuel Storage Tank Replacement

  • Location (CFB Esquimalt, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90370
  • Last Modified: 2026-04-14
  • Relevance: 414.23
  • The Department of National Defence (DND) is proposing a project. The proposed project will include the demolition of the existing building at RP-138, along with the excavation and disposal of contaminated soil surrounding the associated 45,000 L underground fuel storage tank (UST). The excavation will be backfilled and a new above ground fuel storage tank (AST) will be installed on a concrete pad on the east side of the entrance into the building RP-137 parking lot. A gravel parking ...

Project Valentine Gold Project

  • Location (Valentine Lake, Newfoundland and Labrador)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Completed
  • Reference Number: 80169
  • Last Modified: 2026-04-14
  • Relevance: 414.22
  • Marathon Gold Corporation is proposing the construction, operation, decommissioning, and reclamation of an open-pit gold mine and on-site mill located at Valentine Lake, approximately 55 kilometres southwest of Millertown in Newfoundland and Labrador. As proposed, the Valentine Gold Project would include three open pits, disposal piles, crushing and stockpiling areas, site infrastructure, a tailings management facility, and mine site haul and access roads. Production capacity is estimated at ...

Project Potential Regional Assessment of the Trans-Canada Highway Improvement Project

  • Location (Kenora, Ontario) (Whiteshell Provincial Park, Manitoba)
  • Assessment Type: Request for regional assessment
  • Status: In progress
  • Reference Number: 90334
  • Last Modified: 2026-04-14
  • Relevance: 414.22
  • The Minister of the Environment, Climate Change and Nature received a request for a regional assessment of the Trans-Canada Highway Improvement Project, located in Ontario and in Manitoba. The proposed regional assessment would aim to gather information on the adverse effects of the twinning of the Trans-Canada Highway from Kenora, Ontario to the Whiteshell Provincial Park, Manitoba.

Project MIFN MEGH Cabin

  • Location (Mushuau Innu First Nation, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90352
  • Last Modified: 2026-04-14
  • Relevance: 414.22
  • The project will include the construction of a rustic cabin, a shed and two outhouses. The main structure will include three bedrooms, a bathroom with a portable toilet, a kitchen and dining space, as well as a living/recreational space. The site will be services by two outhouses, heated wood stove, solar powered lights, a plug-in portable generator and portable water. Access to the site would be provided by an upgraded gravel road (5m wide and 758m long – approximately 3800m2 total) with ...

Project Weirs rehabilitation in the Lac Saint-Pierre archipelago

  • Location (Lac Saint-Pierre archipelago, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86018
  • Last Modified: 2026-04-14
  • Relevance: 414.21
  • The Fisheries and Oceans Canada/Canadian Coast Guard (DFO-CCG) project consists of upgrading the five (5) weirs located in the Lac Saint-Pierre archipelago. DFO-CCG is responsible for the safety, protection and accessibility of Canada's waterways. DFO-Quebec Region's Real Property and Environmental Management  (RPEM) Branch is the project proponent. The scope of work on each weir could be different, but essentially consists of rehabilitating the existing structures by repairing ...

Project Public Services and Procurement Canada – Cape Breton Operations (PSPC-CBO) Mine Water Retention Pond, (DFRP# 38409), Camerons Lane, New Victoria, Cape Breton County, NS

  • Location (The subject property a 69 acre parcel of land (PID# 15513666) locate at 86 Camerons Lane in New Victoria, Cape Breton Regional Municipality, Nova Scotia that is owned by PSPC - Cape Breton Operations, DFRP # 37409, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 89934
  • Last Modified: 2026-04-14
  • Relevance: 414.2
  • The proposed project will include the construction of a lined, mine water retention pond to aid in ongoing mine water management.  The proposed pond will be constructed off of Camerons Lane in New Victoria, Cape Breton Regional Municipality, in Nova Scotia.  The project will consist of clearing and grubbing of an area of small trees and scrub brush that will measure approximately 4,800 sqm in size.  The contractor will excavate the cleared area saving the top 0.5m of material as ...

Project Paterson Port of Entry Redevelopment

  • Location (Paterson Port of Entry, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90366
  • Last Modified: 2026-04-13
  • Relevance: 414.12
  • As part of its commitment to border infrastructure enhancements, the Canada Border Services Agency (CBSA) is upgrading or replacing select land border ports of entry (POE) to modernize its custodial facilities. Included as part of this initiative, is the Paterson POE. The new building will replace the current facility that is past its lifecycle, and will be rebuilt within the existing site footprint. This will require the construction of new buildings, infrastructure and the demolition of ...

Project Pleasant Camp Port of Entry Redevelopment

  • Location (Pleasant Camp Port of Entry, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90365
  • Last Modified: 2026-04-13
  • Relevance: 414.12
  • As part of its commitment to border infrastructure enhancements, the Canada Border Services Agency (CBSA) is upgrading or replacing select land border ports of entry (POE) to modernize its custodial facilities. Included as part of this initiative, is the Pleasant Camp POE. The new building will replace the current facility that is past its lifecycle, and will be rebuilt within the existing site footprint. This will require the construction of new buildings, infrastructure and the demolition ...

Project Department of National Defence, Strategic Tanker Transport Capability Project Support Infrastructure, Airfield Modifications Phase 1, 8 Wing Trenton – Year 2 Update

  • Location (8 Wing Trenton, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90255
  • Last Modified: 2026-04-13
  • Relevance: 414.12
  • The Department of National Defence (DND) has proposed a project to modify existing infrastructure in support of the Strategic Tanker Transport Capability (STTC) Project at 8 Wing Canadian Forces Base (CFB) Trenton. This submission relates to Phase 1 of the Airfield Modifications, which includes the reconstruction and rehabilitation of Taxiway Papa, Runway 06 24, and their associated connector taxiways. Additional airfield modification phases associated with the STTC Project include the ...

Project 2026 Airfield Improvements Project

  • Location (Winnipeg Richardson International Airport, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90364
  • Last Modified: 2026-04-13
  • Relevance: 414.11
  • Public Notice April 13, 2026 – Winnipeg Airports Authority Inc. must determine whether the proposed 2026 Airfield Improvements Project – Taxiway W & E Resurfacing and Apron V Rehabilitation at Winnipeg Richardson International Airport (YWG), located in Winnipeg, Manitoba is likely to cause significant adverse environmental effects. To help inform this determination, Winnipeg Airports Authority Inc. is inviting comments from the public respecting that determination. All ...

Project Hoole Creek Road Subdivision Apex Utilities

  • Location (Wabasca 166A, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 89777
  • Last Modified: 2026-04-13
  • Relevance: 414.11
  • At the request of the Opasikoniwew Housing Authority, and with authorization from the Chief and Council of Bigstone Cree Nation via a Council Resolution, Apex Utilities plans to install approximately 627m of 60.3mm steel and 116m of 114.3mm PE gas distribution main in order to service 19 residential lots.

Project Common Reed Biocontrol Release

  • Location (Point Pelee National Park of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90247
  • Last Modified: 2026-04-13
  • Relevance: 414.1
  • Common reed (Phragmites australis australis), an invasive alien species, has spread extensively becoming a major threat to North American wetlands and natural areas. In Point Pelee National Park, dense stands of common reed in the marsh, swamp thicket, beach-dune, and woodland ecosystems reduce biodiversity, habitat quality, and access to breeding areas for wildlife and species at risk like nesting turtles and migratory birds. In Spring 2026, researchers plan to release biocontrol moths at 2 ...

Last ModifiedDisplay Filters

Filters

Authorities Display Filters

Date modified: