Search Registry

Registry Search Mobile

Registry Search

Skip to Filters

1144 results

Document From the Impact Assessment Agency of Canada to Atlantic Gold Corporation re: Information Requests (Round 3, Part 2)

  • Project Beaver Dam Mine Project
  • Document Category: Additional Information
  • Reference Number: 326
  • Updated: 2022-02-03
  • Document: 142753E.pdf
  • Relevance: 75335.67
  • Suite 200 Bureau 200 1801 Hollis Street 1801, rue Hollis Halifax NS B3J 3N4 Halifax, NÉ B3J 3N4 February 3, 2022 Craig Hudson Atlantic Mining NS Inc. 409 Billybell Way, Mooseland Middle Musquodoboit, NS B0N 1X0 SUBJECT: Beaver Dam Mine Project – Information Requirements (Round 3 – Part 2) Dear Craig Hudson: The Impact Assessment Agency of Canada (the Agency) has completed its technical review of the Round 2 Information Requirement (IR) response for CEAA-2-31 for the proposed Beaver Dam Mine Project (the Project).
  • Project Manager, Impact Assessment Agency Atlantic Region https://iaac-aeic.gc.ca/050/evaluations/proj/80111 Suite 200 Bureau 200 1801 Hollis Street 1801, rue Hollis Halifax NS B3J 3N4 Halifax, NÉ B3J 3N4 Cc: Suzanne Wade, Stephen Zwicker & Michael Hingston – Environment and Climate Change Canada Christopher Burbidge & Matthew Baker – Fisheries and Oceans Canada Shelley Ball – Natural Resources Canada Jason Flanagan – Transport Canada Joel Kaushansky & Beverly Ramos-Casey – Health Canada Bridget Tutty – NS Environment and Climate Change Attachment 1 - Beaver Dam Mine Project Information Requirements (Round 3 – Part 2) from the Environmental Impact Statement Review Attachment 1: Beaver Dam Mine Project Information Requirements (Round 3 - Part 2) from the Environmental Impact Statement Review: February 3, 2022 INTRODUCTION
  • The Impact Assessment Agency of Canada (the Agency) completed its technical review of the Environmental Impact Statement (EIS) and associated EIS Summary for the proposed Beaver Dam Mine Project.

Document Public Notice - Public Comments Invited on a Revised Summary of the Environmental Impact Statement

  • Project Beaver Dam Mine Project
  • Document Category: For Public Participation
  • Reference Number: 49
  • Updated: 2021-11-16
  • Document: 142249E.html
  • Relevance: 72038.16
  • Public Notice Beaver Dam Mine Project — Public Comments Invited   November 30, 2021 — The deadline to submit comments has been extended from December 16, 2021, to December 17, 2021.
  • November 16, 2021 - The Impact Assessment Agency of Canada and the Nova Scotia Department of Environment and Climate Change (ECC) invite the public and Indigenous groups to comment on the potential environmental effects of the proposed Beaver Dam Mine Project, located in Marinette, Nova Scotia.
  • The Beaver Dam Mine Project would have an ore production rate of 2.1 million tonnes/year, over a five-year period.
1 alternate format found
French HTML
  • Relevance: 60398.27
  • Avis public Projet de la mine Beaver Dam — Période de consultation publique   Le 30 novembre 2021 — La date limite pour présenter des commentaires a été reportée du 16 décembre 2021 au 17 décembre 2021.
  • Le 16 novembre 2021 — L'Agence d'évaluation d'impact du Canada (l'Agence) et le ministère de l'Environnement et Changement climatique Nouvelle-Écosse (ECC) invitent le public et les groups autochtones à formuler leur commentaires sur les effets environnementaux potentiels du projet de la mine Beaver Dam, situé à Marinette, en Nouvelle-Écosse.
  • Le projet de la mine Beaver Dam aurait un taux de production de minerai de 2,1 millions de tonnes par an, sur une période de cinq ans.

Document Notice of Time Limit Extension

  • Project Beaver Dam Mine Project
  • Document Category: Additional Information
  • Reference Number: 332
  • Updated: 2022-08-17
  • Document: 144818E.html
  • Relevance: 71990.75
  • (the proponent) to provide the required information or studies described in the Final Environmental Impact Statement Guidelines for the environmental assessment of the Beaver Dam Mine Project.
  • For further information on this time limit extension or the environmental assessment, please contact: Beaver Dam Mine Project Impact Assessment Agency of Canada 200-1801 Hollis Street Halifax, Nova Scotia B3J 3N4 Email: bdmine-minebd@iaac-aeic.gc.ca
1 alternate format found
French HTML
  • Relevance: 70473.68
  • (le promoteur) pour fournir les études ou renseignements demandés, décrits dans la version définitive des lignes directrices relatives à l'étude d'impact environnemental du Projet de la mine Beaver Dam.
  • Pour obtenir des renseignements supplémentaires sur la prolongation du délai ou l'évaluation environnementale, veuillez communiquer avec : Projet de la mine Beaver Dam Agence d'évaluation d'impact du Canada 200-1801, rue Hollis Halifax (Nouvelle-Écosse) B3J 3N4 Courriel : bdmine-minebd@iaac-aeic.gc.ca

Last UpdatedDisplay Filters

Filters

Location Display Filters

Assessment Status Display Filters

Nature of Activity Display Filters

Comment Tags Display Filters

Date modified: