Modification of Hydro-Québec facilities, including the construction of a new sectioning post to optimize and integrate energy produced by a forest biomass cogeneration plant in Opitciwan

Registry Search Mobile

Registry Search

Skip to Filters

2 results

Document Notice of Determination- Housing, Infrastructure and Communities Canada and Indigenous Services Canada

  • Project Modification of Hydro-Québec facilities, including the construction of a new sectioning post to optimize and integrate energy produced by a forest biomass cogeneration plant in Opitciwan
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2025-09-15
  • Document: 163217E.html
  • Relevance: 367.07
  • Notice of Determination Ottawa (ON), Québec (QC)– September 15, 2025 – Housing, Infrastructure and Communities Canada and Indigenous Services Canada have determined that the project to Modify Hydro-Québec's facilities, including the construction of a new sectioning substation to optimize and integrate energy produced from a cogeneration plant with forest biomass in Opitciwan (Obedjiwan), is not likely to cause significant adverse effects on the environment. This determination was based ...
1 alternate format found
French HTML
  • Relevance: 316.07
  • Avis de détermination Ottawa (ON), Québec (QC) – 15 septembre 2025 – Logement, infrastructures et Collectivités Canada et Services aux Autochtones Canada ont déterminé que le projet de Modification des installations d'Hydro-Québec incluant la construction d'un nouveau poste de sectionnement pour optimiser et intégrer de l'énergie produite à partir d'une centrale de cogénération à la biomasse forestière à Opitciwan (Obedjiwan) n'est pas susceptible de causer des effets négatifs importants ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Key Document Display Filters

Document Category Display Filters

Date modified: