Replace Culverts on Lower Spring Road and 11th Line - 4th Canadian Division Training Centre (Meaford)

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Replace Culverts on Lower Spring Road and 11th Line - 4th Canadian Division Training Centre (Meaford)
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2025-09-12
  • Document: 163202E.html
  • Relevance: 376.79
  • Notice of Determination September 12, 2025 The authorities have determined that the proposed ‘Replace Culverts on Lower Spring Road and 11th Line - 4th Canadian Division Training Centre (Meaford)' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the public; and technically and ...
1 alternate format found
French HTML
  • Relevance: 325.79
  • Avis de détermination Le 12 septembre 2025 Les autorités ont déterminé que le projet proposé ‘Remplacement des ponceaux sur le chemin Lower Spring et la 11e ligne - Centre d'instruction de la 4e Division du Canada (Meaford)' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances ...

Document Public Comment Period on Intent to Make a Determination

  • Project Replace Culverts on Lower Spring Road and 11th Line - 4th Canadian Division Training Centre (Meaford)
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2025-07-07
  • Document: 162269E.html
  • Relevance: 369.97
  • Public Comment Period on Intent to Make a Determination Replace Culverts on Lower Spring Road and 11th Line – 4th Canadian Division Training Centre (Meaford) July 7, 2025 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments ...
1 alternate format found
French HTML
  • Relevance: 318.97
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Remplacement des ponceaux sur le chemin Lower Spring et la 11e ligne - Centre d'instruction de la 4e Division du Canada (Meaford) Le 7 juillet 2025 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Date modified: