Document Notice of Determination

  • Project Strategic Tanker Transport Capability Project Support Infrastructure - Phase 1: Construction of a Two-bay Hangar - 8 Wing Trenton
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2025-02-24
  • Document: 160927E.html
  • Relevance: 361.78
  • Notice of Determination February 24, 2025 The authorities have determined that the proposed ‘Strategic Tanker Transport Capability Project Support Infrastructure - Phase 1: Construction of a Two-bay Hangar - 8 Wing Trenton' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the ...
1 alternate format found
French HTML
  • Relevance: 310.78
  • Avis de détermination Le 24 février 2025 Les autorités ont déterminé que le projet proposé ‘Projet d'avion stratégique de transport et de ravitaillement en vol - Phase 1 : Construction d'un hangar à deux baies - 8e Escadre Trenton' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances ...

Document Public Comment Period on Intent to Make a Determination

  • Project Strategic Tanker Transport Capability Project Support Infrastructure - Phase 1: Construction of a Two-bay Hangar - 8 Wing Trenton
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2024-12-20
  • Document: 160504E.html
  • Relevance: 355.36
  • Public Comment Period on Intent to Make a Determination Strategic Tanker Transport Capability Project Support Infrastructure – Phase 1: Construction of a Two-bay Hangar – 8 Wing Trenton December 20, 2024 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the ...
1 alternate format found
French HTML
  • Relevance: 304.36
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Projet d'avion stratégique de transport et de ravitaillement en vol – Phase 1 : Construction d'un hangar à deux baies – 8e Escadre Trenton Le 20 décembre 2024 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale ...