Document Dismantling of Midatlantic Minerals Inc. facilities
- Project Dismantling of Midatlantic Minerals Inc. facilities
- Document Category: For Public Participation
- Reference Number: 1
- Updated: 2024-03-13
- Document: 155917E.html
- Relevance: 387.38
- The project consists of dismantling the facilities of Minéraux Midatlantic inc. located behind platform 108 (warehouse, silos, factory, concrete slab, underground pipe, septic tank). All work will be coordinated and supervised by a specialist demolition contractor. Lifting equipment and a crane will be used for the dismantling work. The project has a footprint of approximately 5,000 square meters. It will be carried out during normal working hours, i.e. 7 a.m. to 6 ...
1 alternate format found
French HTML
- Relevance: 336.38
- Le projet consiste à démanteler les installations de Minéraux Midatlantic inc. situées à l'arrière du quai 108 (entrepôt, silos, usine, dalle de béton, conduite souterraine, fosse septique). Tous les travaux seront coordonnés et supervisés par un entrepreneur spécialisé en démolition. Des équipements de levage et une grue seront utilisés pour les travaux de ...