Cooper Cove Marine Terminal Expansion Project

Registry Search Mobile

Registry Search

Skip to Filters

48 results

Document Notice of Opinion on Whether an Impact Assessment is Required

  • Project Cooper Cove Marine Terminal Expansion Project
  • Document Category: Additional Information
  • Reference Number: 19
  • Updated: 2024-04-08
  • Document: 157615E.html
  • Relevance: 391.91
  • Notice of Opinion on Whether an Impact Assessment is Required Ottawa — April 8, 2024 — The Impact Assessment Agency of Canada (the Agency) is of the opinion that an impact assessment is not required for the Cooper Cove Marine Terminal Expansion Project (the project) proposed by the Port of Argentia (the proponent), located in Newfoundland and Labrador. In applying the measures outlined in the Statement on the Interim Administration of the Impact Assessment Act Pending Legislative ...
1 alternate format found
French HTML
  • Relevance: 340.91
  • Avis sur l'opinion quant à la question de savoir si une évaluation d'impact est justifiée Ottawa — 8 avril 2024 — L'Agence d'évaluation d'impact du Canada (l'Agence) est d'avis qu'une évaluation d'impact n'est pas justifiée pour le projet d'agrandissement du terminal maritime de Cooper Cove (le projet) proposé par le port d'Argentia (le promoteur), situé à Terre-Neuve-et-Labrador. En application des mesures décrites dans la Déclaration sur les dispositions provisoires relatives à ...

Document Summary of the Detailed Project Description of a designated project

  • Project Cooper Cove Marine Terminal Expansion Project
  • Document Category: Additional Information
  • Reference Number: 20
  • Updated: 2024-03-15
  • Document: 157102E.pdf
  • Relevance: 389.35
  • PORT OF ARGENTIA Cooper Cove Marine Terminal Expansion Project Detailed Project Descrip on Part G – Newfoundland and Labrador March 2024 - 21-3088 45 Hebron Way Suite 202 St. John’s Newfoundland and Labrador Canada A1A 0P9 Telephone 709.754.2374 Fax 709.754.2380 Dillon Consulting Limited March 15, 2024 Newfoundland and Labrador Satellite Office Impact Assessment Agency of Canada / Government of Canada 301-10 Barters Hill St. John’s, Newfoundland and Labrador A1C 6M1 Attention: Leslie ...
1 alternate format found
French PDF
  • Relevance: 338.35
  • PORT D’ARGENTIA Projet d’agrandissement du terminal maritime de Cooper Cove Par e G – Résumé en langage simple – Descrip on détaillée du projet– Terre-Neuve-et-Labrador mars 2024 – 21-3088 45 Hebron Way Bureau 202 St. John’s Terre-Neuve-et- Labrador Canada A1A 0P9 Téléphone 709.754.2374 Télécopieur 709.754.2380 Dillon Consulting Limited mars 15, 2024 Bureau satellite de Terre-Neuve-et-Labrador Agence d’évaluation d’impact du Canada / Gouvernement du Canada 301-10 Barters Hill St. ...

Document Supporting geospatial data - Detailed Project Description

  • Project Cooper Cove Marine Terminal Expansion Project
  • Document Category: Geospatial data files
  • Reference Number: 22
  • Updated: 2024-02-02
  • Document: 157104E.html
  • Relevance: 384.91
  • Supporting geospatial data – Detailed Project Description Port of Argentia has provided electronic geospatial data files on February 2, 2024, related to the Cooper Cove Marine Terminal Expansion Project. The dataset contains the following 37 layers for maps provided in the Detailed Project Description. These data files are available to the public under the terms of the Open Government Licence – Canada.   Layer Name Projection (name) Page number AREA OF WORK NAD83 CSRS 3, 77 ARMOUR ...
1 alternate format found
French HTML
  • Relevance: 333.91
  • Données géospatiales connexes — Description détaillée du projet (anglais seulement) Port d'Argentia a fourni des fichiers électroniques de données géospatiales le 2 février 2024 liées au projet d'agrandissement du terminal maritime de Cooper Cove. L'ensemble de données contient 37 de couches pour les cartes fournies dans la description détaillée du projet. Ces fichiers de données sont mis à la disposition du public selon les termes de la Licence du gouvernement ouvert – Canada.   Nom de ...

Document Summary of issues

  • Project Cooper Cove Marine Terminal Expansion Project
  • Document Category: Additional Information
  • Reference Number: 18
  • Updated: 2024-01-19
  • Document: 155709E.html
  • Relevance: 383.44
  • Summary of Issues – Cooper Cove Marine Terminal Expansion Project This document provides a high-level summary of issues that were submitted to the Impact Assessment Agency of Canada (the Agency) about the Cooper Cove Marine Terminal Expansion Project (the Project) during the public comment period on the Summary of the Initial Project Description (IPD), submitted by the Port of Argentia (the Proponent). The issues highlight information that will be considered by the Agency in forming its ...
3 alternate formats found
English PDF
  • Relevance: 383.44
  • JANUARY 19, 2024 – COOPER COVE MARINE TERMINAL EXPANSION PROJECT – SUMMARY OF ISSUES – Page 1 of 11 SUMMARY OF ISSUES – Cooper Cove Marine Terminal Expansion Project This document provides a high-level summary of issues that were submitted to the Impact Assessment Agency of Canada (the Agency) about the Cooper Cove Marine Terminal Expansion Project (the Project) during the public comment period on the Summary of the Initial Project Description (IPD), submitted by the Port of ...
French HTML
  • Relevance: 332.44
  • Sommaire des questions – Projet d'agrandissement du terminal maritime de Cooper Cove Le présent document fournit un résumé général des questions présentées à l'Agence d'évaluation d'impact du Canada (l'Agence) à propos du projet d'agrandissement du terminal maritime de Cooper Cove pendant la période de consultation sur le résumé de la description initiale du projet (DIP), présenté par le port d'Argentia (le promoteur). Ces questions mettent en évidence les renseignements qui seront pris en ...
French PDF
  • Relevance: 332.44
  • 19 JANVIER 2024 – PROJET D’AGRANDISSEMENT DU TERMINAL MARITIME DE COOPER COVE — SOMMAIRE DES QUESTIONS – Page 1 of 12 SOMMAIRE DES QUESTIONS – Projet d’agrandissement du terminal maritime de Cooper Cove Le présent document fournit un résumé général des questions présentées à l’Agence d’évaluation d’impact du Canada (l’Agence) à propos du projet d’agrandissement du terminal maritime de Cooper Cove pendant la période de consultation sur le résumé de la description initiale du projet ...

Document Public notice - Participant funding available

  • Project Cooper Cove Marine Terminal Expansion Project
  • Document Category: For Public Participation
  • Reference Number: 4
  • Updated: 2023-12-12
  • Document: 154775E.html
  • Relevance: 379.48
  • Public Notice Cooper Cove Marine Terminal Expansion Project Participant Funding Available   December 12, 2023 — Funding provided by the Impact Assessment Agency of Canada (the Agency) is now available to help Indigenous Peoples and the public participate in the impact assessment process for the proposed Cooper Cove Marine Terminal Expansion Project, which would expand the existing Argentia Marine Terminal located in Placentia Bay, on the southeast coast of the island of ...
1 alternate format found
French HTML
  • Relevance: 328.48
  • Avis public Projet d'agrandissement du terminal maritime de Cooper Cove Disponibilité d'une aide financière aux participants   Le 12 décembre 2023 — L'Agence d'évaluation d'impact du Canada (l'Agence) met à la disposition des peuples autochtones et du public une aide financière pour favoriser leur participation au processus d'évaluation d'impact du projet d'agrandissement du terminal maritime de Cooper Cove, qui permettrait d'agrandir le terminal maritime d'Argentia existant situé dans ...

Document Public notice - Public comments invited on the summary of the Initial Project Description

  • Project Cooper Cove Marine Terminal Expansion Project
  • Document Category: For Public Participation
  • Reference Number: 3
  • Updated: 2023-12-06
  • Document: 154745E.html
  • Relevance: 378.86
  • Public Notice Cooper Cove Marine Terminal Expansion Project Public Comments Invited on the Summary of the Initial Project Description What is happening? December 6, 2023 — Port of Argentia is proposing the Cooper Cove Marine Terminal Expansion Project, which would expand the existing Argentia Marine Terminal located in Placentia Bay on the southeast coast of the island of Newfoundland. The Impact Assessment Agency of Canada (the Agency) invites Indigenous Peoples and the public to ...
1 alternate format found
French HTML
  • Relevance: 327.86
  • Avis public Projet d'agrandissement du terminal maritime de Cooper Cove Période de consultation publique sur le résumé de la description initiale du projet Que se passe-t-il? Le 6 décembre 2023 – Le port d'Argentia propose le projet d'agrandissement du terminal maritime de Cooper Cove, qui permettrait d'agrandir le terminal maritime d'Argentia existant situé dans la baie de Plaisance, sur la côte sud-est de l'île de Terre-Neuve. L'Agence d'évaluation d'impact du Canada (l'Agence) invite ...

Document Summary of the Initial Project Description of a designated project

  • Project Cooper Cove Marine Terminal Expansion Project
  • Document Category: For Public Participation
  • Reference Number: 2
  • Updated: 2023-11-29
  • Document: 154696E.pdf
  • Relevance: 378.14
  • PORT OF ARGENTIA Cooper Cove Marine Terminal Expansion Project Ini al Project Descrip on Part F – Newfoundland and Labrador November 2023 - 21-3088 45 Hebron Way Suite 202 St. John’s Newfoundland and Labrador Canada A1A 0P9 Telephone 709.754.2374 Fax 709.754.2380 Dillon Consulting Limited November 29, 2023 Newfoundland and Labrador Satellite Office Impact Assessment Agency of Canada / Government of Canada 301-10 Barters Hill St. John’s, Newfoundland and Labrador A1C 6M1 Attention: ...
1 alternate format found
French PDF
  • Relevance: 327.14
  • PORT D’ARGENTIA Projet d’agrandissement du terminal maritime de Cooper Cove Par e F – Résumé en langage simple – Descrip on ini ale du projet et évalua on environnementale – Terre-Neuve-et-Labrador novembre 2023 – 21-3088 45 Hebron Way Bureau 202 St. John’s Terre-Neuve-et- Labrador Canada A1A 0P9 Téléphone 709.754.2374 Télécopieur 709.754.2380 Dillon Consulting Limited novembre 29, 2023 Bureau satellite de Terre-Neuve-et-Labrador Agence d’évaluation d’impact du Canada / Gouvernement ...

Comment Environment and Climate Change Canada (ECCC) - Federal Authority Advice Record (FAAR)

  • Comment Cooper Cove Marine Terminal Expansion Project
  • Author: Administrator on behalf of Environment and Climate Change Canada
  • Reference Number: 10
  • Submitted: 2023-12-21 - 2:11 PM
  • Updated: 2023-12-29 10:53 AM
  • Rationale: Comment updated at the author's request
  • Project Phase: Planning
  • Participation Notice: Public notice - Public comments invited on the summary of the Initial Project Description
  • Relevance: 279.48
  • Please see the attached submission 
  • Attachment Included
  • Relevance: 279.48
  • Federal Authority Advice Record (FAAR) The FAAR must be submitted to the Registry by December 20, 2023. Cooper Cove Marine Terminal Expansion Project – Port of Argentia Registry reference no.: 86128 Department/Agen cy Environment and ...
  • Attachment Included
  • Relevance: 279.48
  • Procedures for handling and documenting stranded birds encountered on infrastructure offshore Atlantic Canada Cat. No.: xx ISBN: xx Unless otherwise specified, you may not reproduce materials in this publication, in ...
  • Attachment Included
  • Relevance: 279.48
  • Page | 1 Procedures for handling and documenting stranded birds encountered on infrastructure offshore Atlantic Canada Appendix 1 – March 2021 version Stranded Bird Search and Encounter Datasheet For ALL stranded bird searches ...
  • Attachment Included
  • Relevance: 279.48
  • WHAT TO DO WHEN YOU FIND A STRANDED BIRD Document on “Stranded Bird Encounter Datasheet” and take photograph(s) to confirm species iden�fica�on IS THE BIRD ALIVE? NO YES Are there more than 10? Is it just resting? NO Is it oiled or a SARA ...
  • Attachment Included
  • Relevance: 279.48
  • Common Seabirds of Atlantic Canada White chin Shearwaters Great Skua Jaegers and Skuas Phalaropes Photo credits: Bruce Mactavish, John Chardine, Brian Patteson, Sabina Wilhelm, Anna Calvert, Carina Gjerdrum, Dave Fifield, and Ian Jones. ...
  • Attachment Included
  • Relevance: 279.48
  • Table 1: Key issues to inform the impact assessment process The Agency asks that federal authorities guide expert advice on the Agency's approach to project specific tailoring, if the Agency is in the opinion that an impact assessment is ...