Document Notice of Agency's Opinion on Whether an Impact Assessment is Required

  • Project Novador Gold Mine Project
  • Document Category: Additional Information
  • Reference Number: 36
  • Updated: 2024-05-03
  • Document: 157330E.html
  • Relevance: 399.98
  • Notice of Agency's Opinion on Whether an Impact Assessment is Required Ottawa – May 6, 2024 - The Impact Assessment Agency of Canada (the Agency) is of the opinion that an impact assessment is warranted for the Novador Gold Mine Project (the project) proposed by Probe Gold Inc. (the proponent), located in Quebec. In applying the measures outlined in the Statement on the Interim Administration of the Impact Assessment Act Pending Legislative Amendments, the Agency has considered the ...
1 alternate format found
French HTML
  • Relevance: 348.98
  • Avis sur l'opinion quant à la question de savoir si une évaluation d'impact est justifiée Ottawa — 6 mai 2024 — L'Agence d'évaluation d'impact du Canada (l'Agence) est d'avis qu'une évaluation d'impact est justifiée pour le projet aurifère Novador (le projet) proposé par Probe Gold Inc. (le promoteur), situé à Val d'Or, situé au Québec. En application des mesures décrites dans la Déclaration sur les dispositions provisoires relatives à l'administration de la Loi sur l'évaluation d'impact en ...

Document Summary of the detailed project description of a designated project

  • Project Novador Gold Mine Project
  • Document Category: Additional Information
  • Reference Number: 35
  • Updated: 2024-04-01
  • Document: 157318E.pdf
  • Relevance: 396.5
  • D E T A I L E D P R O J E C T D E S C R I P T I O N S U M M A R Y A P R I L 2 0 2 4 ii SIGNATURES Prepared by: Chantal Dancose, M.Sc. Director of Community Relations and Sustainable Development Approved by: Yves Dessureault, P.Eng., M.Sc.A., Ph.D., MBA Chief Operating Officer iii TABLE OF CONTENT ...
1 alternate format found
French PDF
  • Relevance: 345.5
  • D E S C R I P T I O N D É T A I L L É E D E P R O J E T R É S U M É A V R I L 2 0 2 4 ii SIGNATURES Préparé par : Chantal Dancose, M.Sc. Directrice des Relations avec les communautés et du Développement durable Approuvé par : Yves Dessureault, P.Eng., M.Sc.A., Ph.D., MBA Chef des opérations iii TABLE DES ...

Document Summary of issues

  • Project Novador Gold Mine Project
  • Document Category: Additional Information
  • Reference Number: 31
  • Updated: 2024-01-04
  • Document: 155323E.pdf
  • Relevance: 387.08
  • 1 Summary of questions—Novador Gold Mine Project This document provides a high-level summary of issues that were submitted to the Impact Assessment Agency of Canada (the Agency) about the Novador Gold Mine Project (the Project) during the public comment period on the Summary of the Initial Project Description (IPD), submitted by Probe Gold Inc. (the Proponent). The issues highlight information that will be considered by the Agency in forming its opinion on whether an impact ...
1 alternate format found
French PDF
  • Relevance: 336.08
  • 1 Sommaire des questions — Projet minier aurifère Novador Le présent document fournit un résumé général des questions qui ont été soumises à l’Agence d’évaluation d’impact du Canada (l’Agence) au sujet du projet minier aurifère Novador (le projet) pendant la période de consultation publique sur le résumé de la description initiale du projet (DIP), présenté par Probe Gold Inc. (le promoteur). Les questions mettent en évidence l’information dont l’Agence tiendra compte pour ...

Document Public notice - Participant funding available

  • Project Novador Gold Mine Project
  • Document Category: For Public Participation
  • Reference Number: 2
  • Updated: 2023-11-30
  • Document: 153624E.html
  • Relevance: 383.4
  • Public Notice Novador Gold Mine Project Participant Funding Available   November 30, 2023 — Funding provided by the Impact Assessment Agency of Canada (the Agency) is now available to help Indigenous Peoples and the public participate in the impact assessment process for the proposed Novador Gold Mine Project, a new open-pit and underground mine located east of Val d'Or, in Quebec. Funding is available for eligible individuals and groups to support their participation throughout the ...
1 alternate format found
French HTML
  • Relevance: 332.4
  • Avis public Projet minier aurifère Novador Disponibilité d'une aide financière aux participants   Le 30 novembre 2023 — L'Agence d'évaluation d'impact du Canada (l'Agence) met à la disposition des peuples autochtones et du public une aide financière pour favoriser leur participation au processus d'évaluation d'impact du projet minier aurifère Novador, une nouvelle mine à ciel ouvert et souterraine située à l'est de Val-d'Or, au Québec. Cette aide financière est mise à la disposition ...

Document Public notice - Public comments invited on the summary of the Initial Project Description

  • Project Novador Gold Mine Project
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2023-11-27
  • Document: 154755E.html
  • Relevance: 383.09
  • Public Notice Novador Gold Mine Project Public Comments Invited on the Summary of the Initial Project Description What is happening? November 27, 2023 — Probe Gold Inc. is proposing a new gold mine located near Val-d'Or, in Quebec. The Impact Assessment Agency of Canada (the Agency) invites Indigenous Peoples and the public to review the summary of the Initial Project Description and provide comments on the proposed project. This feedback will help the Agency prepare a summary of ...
1 alternate format found
French HTML
  • Relevance: 332.09
  • Avis public Projet minier aurifère Novador Période de consultation publique sur le résumé de la description initiale du projet Que se passe-t-il? Le 27 novembre 2023 — Probe Gold Inc. (le promoteur) propose une nouvelle mine d'or située près de Val-d'Or, au Québec. L'Agence d'évaluation d'impact du Canada (l'Agence) invite les peuples autochtones et le public à examiner le résumé de la description initiale du projet et à formuler des commentaires sur le projet. Cette rétroaction ...

Document Summary of the initial project description of a designated project

  • Project Novador Gold Mine Project
  • Document Category: For Public Participation
  • Reference Number: 4
  • Updated: 2023-10-16
  • Document: 153580E.pdf
  • Relevance: 378.72
  • I N I T I A L P R O J E C T D E S C R I P T I O N - S U M M A R Y O C T O B E R 2 0 2 3 ii SIGNATURES Prepared by: Chantal Dancose, M.Sc. Director of Community Relations and Sustainable Development Approved by: Yves Dessureault, P.Eng., M.Sc.A., Ph.D., MBA Chief Operating Officer iii TABLE OF CONTENT ...
1 alternate format found
French PDF
  • Relevance: 327.72
  • D E S C R I P T I O N I N I T I A L E D E P R O J E T - R É S U M É O C T O B R E 2 0 2 3 ii SIGNATURES Préparé par : Chantal Dancose, M.Sc. Directrice des Relations avec les communautés et du Développement durable Approuvé par : Yves Dessureault, P.Eng., M.Sc.A., Ph.D., MBA Chef des opérations iii TABLE DES ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters