Douglas Lake Ranch Transmission 3 - Phase Line Relocation

Registry Search Mobile

Registry Search

Skip to Filters

6 results

Document Notice of Determination

  • Project Douglas Lake Ranch Transmission 3 - Phase Line Relocation
  • Document Category: Additional Information
  • Reference Number: 3
  • Updated: 2023-06-12
  • Document: 152017E.html
  • Relevance: 368.25
  • June 9, 2023 – Environment and Climate Change Canada (ECCC) has determined that the proposed Douglas Lake Ranch Transmission 3 – Phase Line Relocation Project, located in Upper Nicola Band Reserve lands, is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous ...
1 alternate format found
French HTML
  • Relevance: 317.25
  • 9 Juin 2023 – Environnement et changement climatique Canada (ECCC) a déterminé que le projet de déplacement de la Douglas Lake Ranch alimentation triphasée ligne de transmission , situé dans les terres de la réserve de la Bande d'Haut Nicola n'est pas susceptible de causer des effets négatifs importants sur l'environnement. Cette détermination reposait sur les facteurs ...

Document Mitigation Measures List

  • Project Douglas Lake Ranch Transmission 3 - Phase Line Relocation
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2023-06-12
  • Document: 152016E.pdf
  • Relevance: 368.25
  • EMP – Mitigation Measures MITIGATION MEASURES Heritage Resources BC Hydro has identified some pole removals for Phase 2 will require archaeological monitoring during the work. The Contractor and all on-site personnel will be familiar with BC Hydro’s Heritage Resources Field Guide and implement ‘stop work procedures’ if evidence of past human occupation is observed during work. Key mitigation measures are:  Conduct of archaeological screening work to designate heritage ...
1 alternate format found
French PDF
  • Relevance: 317.25
  • EMP – Mitigation Measures MITIGATION MEASURES Heritage Resources BC Hydro has identified some pole removals for Phase 2 will require archaeological monitoring during the work. The Contractor and all on-site personnel will be familiar with BC Hydro’s Heritage Resources Field Guide and implement ‘stop work procedures’ if evidence of past human occupation is observed during work. Key mitigation measures are:  Conduct of archaeological screening work to designate heritage ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: