Document Notice of Determination
- Project Install Prime Power to Building 471 - Canadian Forces Base Suffield
- Document Category: Additional Information
- Reference Number: 2
- Updated: 2022-10-25
- Document: 145360E.html
- Relevance: 337.78
- Notice of Determination October 25, 2022 – Canadian Forces Base (CFB) Suffield The Department of National Defence has determined that the proposed ‘Install Prime Power to Building 471' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; and technically and economically feasible mitigation measures The Department of National Defence is satisfied ...
1 alternate format found
French HTML
- Relevance: 286.78
- Avis de détermination Le 25 octobre 2022 – Base des Forces canadiennes (BFC) Suffield Le Ministère de la Défense nationale à déterminé que le projet proposé ‘Relier l'édifice 471 au courant principale' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples autochtones; et les mesures d'atténuation réalisables, sur les plans technique et économique Le ...