Document Notice of determination for GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
- Project GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
- Document Category: Additional Information
- Reference Number: 5
- Updated: 2022-08-29
- Document: 145002E.html
- Relevance: 342.72
- Notice of determination for GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations August 29, 2022 - Indigenous Services Canada has determined that the proposed GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations is not likely to cause significant adverse environmental effects. The determination was based on a consideration of the following factors: -SaskPower is working with Saulteaux and ...
1 alternate format found
French HTML
- Relevance: 291.72
- Avis de détermination pour la phase 1 du projet de reconstruction du réseau de transport GL7 (L007) / Premières nations de Saulteaux et de Moosomin Le 29 août 2022 - Services aux Autochtones Canada a déterminé que le projet de reconstruction de la ligne de transport d'électricité GL7 Phase 1 (L007) / Premières nations de Saulteaux et de Moosomin n'est pas susceptible d'entraîner des effets ...