Explosives Storage Area Fence Repairs at 9 Wing Gander, Canadian Forces Base Gander, Newfoundland and Labrador

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Explosives Storage Area Fence Repairs at 9 Wing Gander, Canadian Forces Base Gander, Newfoundland and Labrador
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2022-08-11
  • Document: 144811E.html
  • Relevance: 340.96
  • Notice of Determination August 11, 2022 – 9 Wing Gander, Canadian Forces Base Gander, Newfoundland and Labrador The Department of National Defence has determined that the proposed ‘Explosives Storage Area Fence Repairs' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: technically and economically feasible mitigation measures The Department of National Defence is satisfied that that ...
1 alternate format found
French HTML
  • Relevance: 289.96
  • Avis de détermination Le 11 août 2022 – 9e Escadre Gander, Base des Forces canadiennes Gander, Terre-Neuve-et-Labrador Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Réparations de la clôture de la zone d'entreposage des explosifs' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : les mesures d'atténuation réalisables, sur les plans technique et économique Le ...

Document Public Comment Period on Intent to Make a Determination

  • Project Explosives Storage Area Fence Repairs at 9 Wing Gander, Canadian Forces Base Gander, Newfoundland and Labrador
  • Document Category: Additional Information
  • Reference Number: 1
  • Updated: 2022-07-11
  • Document: 144395E.html
  • Relevance: 338.14
  • Public Comment Period on Intent to Make a Determination Explosives Storage Area Fence Repairs at 9 Wing Gander, Canadian Forces Base Gander, Newfoundland and Labrador July 11, 2022 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All ...
1 alternate format found
French HTML
  • Relevance: 287.14
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Réparations de la clôture de la zone d'entreposage des explosifs à la 9e Escadre Gander, Base des Forces canadiennes Gander, Terre-Neuve-et-Labrador Le 11 juillet 2022 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Document Category Display Filters

Date modified: