Document Notice of Determination
- Project 8-5-18-6 Pipeline Installation - Canadian Forces Base (CFB) Suffield
- Document Category: Additional Information
- Reference Number: 2
- Updated: 2022-03-28
- Document: 143375E.html
- Relevance: 327.06
- Notice of Determination March 28, 2022 – Canadian Forces Base Suffield The Department of National Defence has determined that the proposed ‘8-5-18-6 Pipeline Installation' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: technically and economically feasible mitigation measures The Department of National Defence is satisfied that that the carrying out of the project is not likely to ...
1 alternate format found
French HTML
- Relevance: 276.06
- Avis de détermination Le 28 mars 2022 – Base des Forces canadiennes Suffield Le Ministère de la Défense nationale a déterminé que le projet proposé ‘8-5-18-6 Installation d'un pipeline' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : les mesures d'atténuation réalisables, sur les plans technique et économique Le Ministère de la Défense nationale est convaincu que le projet est peu ...