Single Well Battery Tie-in Project - Canadian Forces Base (CFB) Suffield

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Single Well Battery Tie-in Project - Canadian Forces Base (CFB) Suffield
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2022-10-18
  • Document: 145294E.html
  • Relevance: 345.33
  • Notice of Determination October 18, 2022 – Canadian Forces Base (CFB) Suffield The Department of National Defence has determined that the proposed ‘Single Well Battery Tie-in Project' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: comments received from the public; and technically and economically feasible mitigation measures The Department of National Defence is satisfied that ...
1 alternate format found
French HTML
  • Relevance: 294.33
  • Avis de détermination Le 18 octobre 2022 – Base des Forces canadiennes (BFC) Suffield Le Ministère de la Défense nationale à déterminé que le projet proposé ‘Projet de raccordement d'installations isolées' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : commentaires reçus du public; et les mesures d'atténuation réalisables, sur les plans technique et économique Le Ministère de la ...

Document Public Comment Period on Intent to Make a Determination

  • Project Single Well Battery Tie-in Project - Canadian Forces Base (CFB) Suffield
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2022-01-12
  • Document: 142576E.html
  • Relevance: 320.52
  • Public Comment Period on Intent to Make a Determination Single Well Battery Tie-in Project – Canadian Forces Base (CFB) Suffield January 12, 2022 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered ...
1 alternate format found
French HTML
  • Relevance: 269.52
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Projet de raccordement d'installations isolées – Base des Forces canadiennes (BFC) Suffield Le 12 janvier 2022 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des commentaires ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: