Construction of Rocky Point Fenced Laydown Area - Canadian Forces Base (CFB) Esquimalt

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Construction of Rocky Point Fenced Laydown Area - Canadian Forces Base (CFB) Esquimalt
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2026-09-10
  • Document: 167878E.html
  • Relevance: 400.23
  • Notice of Determination September 10, 2026 The authorities have determined that the proposed ‘Construction of Rocky Point Fenced Laydown Area - Canadian Forces Base (CFB) Esquimalt' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the public; ...
1 alternate format found
French HTML
  • Relevance: 349.23
  • Avis de détermination Le 10 septembre 2026 Les autorités ont déterminé que le projet proposé ‘Construction d'une aire de dépôt clôturée à Rocky Point - Base des Forces canadiennes (BFC) Esquimalt' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances communautaires; commentaires ...

Document Public Comment Period on Intent to Make a Determination

  • Project Construction of Rocky Point Fenced Laydown Area - Canadian Forces Base (CFB) Esquimalt
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2021-11-01
  • Document: 141734E.html
  • Relevance: 253.44
  • Public Comment Period on Intent to Make a Determination Construction of Rocky Point Fenced Laydown Area – Canadian Forces Base (CFB) Esquimalt November 1, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will ...
1 alternate format found
French HTML
  • Relevance: 202.44
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Construction d'une aire de dépôt clôturée à Rocky Point – Base des Forces canadiennes (BFC) Esquimalt Le 1 novembre 2021 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des ...