Concrete structures installation for CFB Shearwater Building SH5

Registry Search Mobile

Registry Search

Skip to Filters

2 results

Document Public Comment Period on Intent to Make a Determination

  • Project Concrete structures installation for CFB Shearwater Building SH5
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2021-04-06
  • Document: 138553E.html
  • Relevance: 299.49
  • Public Comment Period on Intent to Make a Determination Concrete structures installation for CFB Shearwater Building SH5 April 6, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For ...
1 alternate format found
French HTML
  • Relevance: 248.49
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Installation de structures en béton pour le bâtiment BFC Shearwater SH5. Le 6 avril 2021 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des commentaires sur cette détermination. ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Document Category Display Filters

Date modified: