Document Notice of Determination
- Project Construct Sidewalks on Montgomery Road Phase 1, Garrison Petawawa
- Document Category: Additional Information
- Reference Number: 2
- Updated: 2021-04-22
- Document: 138776E.html
- Relevance: 290.2
- Notice of Determination April 22, 2021 – Petawawa, Ontario The Department of National Defence has determined that the proposed ‘Construct Sidewalks on Montgomery Road Phase 1, Garrison Petawawa' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: · technically and economically feasible mitigation measures. The Department of National Defence is satisfied that that the carrying out of the ...
1 alternate format found
French HTML
- Relevance: 239.2
- Avis de détermination Le 22 avril 2021 – Petawawa (Ontario) Le Ministère de la Défense nationale a déterminé que le projet proposé « Construction de trottoirs sur le chemin Montgomery, phase 1, garnison Petawawa » n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : · les mesures d'atténuation qui sont réalisables d'un point de vue technique et économique. Le Ministère de la Défense nationale ...