Document Amendment to the construction hours in respect to condition 45 of the approved Pattullo Bridge Replacement Project (PER No. 17-107)
- Project Amendment to the construction hours in respect to condition 45 of the approved Pattullo Bridge Replacement Project (PER No. 17-107)
- Document Category: Additional Information
- Reference Number: 2
- Updated: 2021-02-09
- Document: 138126E.html
- Relevance: 309.21
- Notice of Determination Fraser River, between Surrey and New Westminster, B.C. – February 9, 2021 – The Vancouver Fraser Port Authority has determined that the proposed amendment to the construction hours in respect to condition 45 of the approved Pattullo Bridge Replacement Project (PER No. 17-107), spanning the Fraser River between Surrey and New Westminster, is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following ...
1 alternate format found
French HTML
- Relevance: 258.21
- Avis de détermination Fleuve Fraser, entre Surrey et New Westminster, C.-B. – 9 février 2021 – L'Administration portuaire Vancouver-Fraser a déterminé que la modification proposée aux heures de construction concernant la condition du projet approuvé de remplacement du pont Pattullo (PER No 17-107), qui enjambe le fleuve Fraser entre Surrey et New Westminster, n'est pas susceptible d'entraîner des effets néfastes importants pour l'environnement. Cette détermination a été obtenue en ...