Document Metro Vancouver - Conveyance for North Shore Wastewater Treatment Plant Amendment No. 4
- Project Conveyance for North Shore Wastewater Treatment Plant - Project Permit No. 17-090-1 - Amendment (Condition 51 - Extended Hours)
- Document Category: Additional Information
- Reference Number: 4
- Updated: 2021-12-15
- Document: 142761E.html
- Relevance: 308.39
- Notice of Determination West Vancouver, B.C. –December 15, 2021– The Vancouver Fraser Port Authority has determined that the proposed Metro Vancouver – Conveyance for North Shore Wastewater Treatment Plant Amendment No. 4 located approximately 150 metres northeast of the northern tower of the Lions Gate Bridge is not likely to cause significant adverse environmental effects. This ...
1 alternate format found
French HTML
- Relevance: 257.39
- Avis de détermination Metro Vancouver, C.-B. – 15 décembre 2021 – L'Administration portuaire Vancouver-Fraser a déterminé que la proposition de modification nº 4 du projet de convoyeur de Metro Vancouver pour l'usine de traitement des eaux usées de la rive nord, situé à environ 150 mètres au nord-est de la tour nord du pont Lions Gate, à West Vancouver ...