Document Notice of Impact Assessment Decision with Reasons

  • Project Prairie Lights Power Project
  • Document Category: Additional Information
  • Reference Number: 29
  • Updated: 2020-04-24
  • Document: 134432E.html
  • Relevance: 105
  • Notice of Impact Assessment Decision with Reasons Ottawa — April 24, 2020 — The Impact Assessment Agency of Canada (the Agency) has decided that an impact assessment is not required for the Prairie Lights Power Project (the Project) located in Alberta. In accordance with subsection 16(2) of the Impact Assessment Act (IAA), the Agency has taken into account each of the following factors: the proponent's Detailed Project Description, and its response to the summary of relevant issues. The ...
1 alternate format found
French HTML
  • Relevance: 50
  • Avis de décision d'évaluation d'impact assortie de motifs Ottawa — 24 avril 2020 — L'Agence d'évaluation d'impact du Canada (l'Agence) a décidé qu'une évaluation d'impact n'est pas requise pour le projet énergétique de Prairie Lights (le projet), situé en Alberta. Conformément au paragraphe 1 (2) de la Loi sur l'évaluation d'impact (LEI), l'Agence a pris en compte chacun des éléments suivants : La description détaillée du projet du promoteur et sa réponse au sommaire des questions ...

Document Notice of Time Limit Resuming

  • Project Prairie Lights Power Project
  • Document Category: Additional Information
  • Reference Number: 26
  • Updated: 2020-03-10
  • Document: 134138E.html
  • Relevance: 105
  • Notice of Time Limit Resuming Ottawa — March 10, 2020 — On March 2, 2020, Prairie Lights Power GP Inc. (the proponent) provided its response to the Summary of Issues and a detailed description of the Prairie Lights Power Project to the Impact Assessment Agency of Canada (the Agency). The proponent thereby completed the activity for which the proponent requested that the time limit be suspended on December 20, 2019, and the 180-day time limit has resumed. The 180-day time limit is the period ...
1 alternate format found
French HTML
  • Relevance: 50
  • Avis de reprise du délai Ottawa — 10 mars 2020 — Le 2 mars 2020, Prairie Lights Power GPInc. (le promoteur) a fourni sa réponse au sommaire des questions et une description détaillée du projet énergétique de Prairie Lights à l'Agence d'évaluation d'impact du Canada (l'Agence). Le promoteur a ainsi terminé l'exercice de l'activité pour laquelle le promoteur avait demandé la suspension du délai le 20 décembre 2019, et le délai de 180 jours a repris son cours. Le délai de 180 jours est la ...

Document Summary of the Detailed Project Description

  • Project Prairie Lights Power Project
  • Document Category: Additional Information
  • Reference Number: 28
  • Updated: 2020-03-03
  • Document: 134140E.pdf
  • Relevance: 105
  • DETAILED PROJECT DESCRIPTION SUMMARY For the PRAIRIE LIGHTS POWER PROJECT REFERENCE NUMBER 80324 Project Location 35 km south of Grande Prairie, Alberta Proponent PRAIRIE LIGHTS POWER LIMITED PARTNERSHIP Submitted to IMPACT ASSESSMENT AGENCY OF CANADA DOCUMENT COMPLETED BY March 2, 2020 Prairie Lights Power Plant 2020 Detailed Project Description - Summary I THIS PAGE INTENTIONALLY BLANK Prairie Lights Power Plant 2020 ...
1 alternate format found
French PDF
  • Relevance: 50
  • RESUME DE LA DESCRIPTION DETAILLEE DU PROJECT Pour le PROJET ÉNERGÉTIQUE PRAIRIE LIGHTS (‘PRAIRIE LIGHTS POWER PROJECT’) NUMÉRO de RÉFERENCE 80324 Localisation de projet 35 km au sud de Grande Prairie, Alberta Promoteur PRAIRIE LIGHTS POWER GP INC. Soumis à L’AGENCE D’ÉVALUATION D’IMPACT DU CANADA (AEIC) RÉDIGÉ PAR TRADUIT DE LA VERSION ANGLAISE ORIGINALE PAR SNC-Lavalin Inc. et McCallum Environmental Ltd. 2 Mars 2020 Projet Énergétique Prairie Lights ...

Document Notice of Time Limit Suspension with Reasons

  • Project Prairie Lights Power Project
  • Document Category: Additional Information
  • Reference Number: 25
  • Updated: 2020-01-16
  • Document: 133623E.html
  • Relevance: 105
  • Notice of Time Limit Suspension with Reasons Ottawa — January 16, 2020 — On December 20, 2019, the Impact Assessment Agency of Canada (the Agency) suspended the 180-day time limit within which it must provide Prairie Lights Power GP Inc. (the proponent) with a notice of the commencement of the impact assessment of the Prairie Lights Power Project, if the Agency decides that an impact assessment of the project is required. The Agency has taken this action further to a written request from ...
1 alternate format found
French HTML
  • Relevance: 50
  • Avis de suspension du délai avec motifs Ottawa — 16 janvier 2020 — Le 20 décembre 2019, l'Agence d'évaluation d'impact du Canada (l'Agence) a suspendu le délai de 180 jours au cours duquel elle doit fournir à Prairie Lights Power GP Inc. (le promoteur) un avis de début de l'évaluation d'impact du projet énergétique de Prairie Lights, si l'Agence décide qu'une évaluation d'impact du projet est requise. Cet avis fait suite à la présentation par le promoteur d'une demande écrite pour faire ...

Document Summary of Issues

  • Project Prairie Lights Power Project
  • Document Category: Additional Information
  • Reference Number: 8
  • Updated: 2019-12-20
  • Document: 133501E.pdf
  • Relevance: 105
  • DECEMBER 20, 2019 – PRAIRIE LIGHTS POWER PROJECT – SUMMARY OF ISSUES – PAGE 1 OF 4 Prairie Lights Power Project - Summary of Issues This document provides a high-level summary of the issues raised through comments received by the Impact Assessment Agency of Canada on the Prairie Lights Power Project (the Project) during the comment period on the Initial Project Description submitted by Prairie Lights Power GP Inc. (the proponent). Original submissions are posted on the Canadian ...
3 alternate formats found
English HTML
  • Relevance: 105
  • Prairie Lights Power Project - Summary of Issues This document provides a high-level summary of the issues raised through comments received by the Impact Assessment Agency of Canada on the Prairie Lights Power Project (the Project) during the comment period on the Initial Project Description submitted by Prairie Lights Power GP Inc. (the proponent). Original submissions are posted on the Canadian Impact Assessment Registry (Registry Project #80324). Categories are listed in alphabetical ...
French PDF
  • Relevance: 50
  • 20 DÉCEMBRE 2019 – PROJET ÉNERGÉTIQUE PRAIRIE LIGHTS – SOMMAIRE DES QUESTIONS – PAGE 1 DE 4 Projet énergétique Prairie Lights – sommaire des questions Le présent document fournit un résumé global des questions soulevées par l’entremise des commentaires transmis à l’Agence d’évaluation d’impact du Canada sur le projet énergétique Prairie Lights (le projet) au cours de la période de consultation publique sur la description initiale du projet présentée par Prairie Lights Power GP ...
French HTML
  • Relevance: 50
  • Projet énergétique Prairie Lights – sommaire des questions  Le présent document fournit un résumé global des questions soulevées par l'entremise des commentaires transmis à l'Agence d'évaluation d'impact du Canada sur le projet énergétique Prairie Lights (le projet) au cours de la période de consultation publique sur la description initiale du projet présentée par Prairie Lights Power GP Inc. (le promoteur). Les présentations originales sont publiées dans le Registre canadien d'évaluation ...