About the results
Information provided by external sources may not be subject to the Official Languages Act and is made available in the language(s) provided. This may result in content being displayed in a language different than that of the web page display.
The result count may differ from the number of unique comments. Similar comments by various authors may be grouped as a single comment; while each comment and attachment count as distinct results. Where applicable, please click on the alternate formats link to view additional versions available.
Jeanne D'Arc Basin Exploration Drilling Project
Skip to Filters
Document Environmental Assessment Decision Statement - ExxonMobil Canada Ltd.
- Project Husky Energy Exploration Drilling Project
- Document Category: Additional Information
- Reference Number: 62
- Updated: 2020-03-16
- Document: 134171E.pdf
- Relevance: 272.05
- Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to ExxonMobil Canada Ltd. c/o Steve Edwards, SSHE and External Affairs Manager 100 New Gower Street, Suite 1000 St. John’s, NL A1C 6K3 for the Jeanne D'Arc Basin Exploration Drilling Project Description of the Designated Project ExxonMobil Canada Limited (ExxonMobil) is proposing to conduct an exploration drilling project within offshore exploration licenses on the Grand ...
3 alternate formats found
English HTML
- Relevance: 272.05
- Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to ExxonMobil Canada Ltd. c/o Steve Edwards, SSHE and External Affairs Manager 100 New Gower Street, Suite 1000 St. John's, NL A1C 6K3 for the Jeanne D'Arc Basin Exploration Drilling Project Description of the Designated Project ExxonMobil Canada Limited (ExxonMobil) is proposing to conduct an exploration drilling project within offshore exploration licenses on the Grand Banks, ...
French PDF
- Relevance: 221.05
- Déclaration de décision Émise aux termes de l’article 54 de la Loi canadienne sur l’évaluation environnementale (2012) à ExxonMobil Canada Ltd. a/s de Steve Edwards, Gestionnaire, sûreté, sécurité, santé, environnement et affaires externes Salle 1000, Place Cabot 100 rue New Gower St. John’s (Terre-Neuve et Labrador) A1C 6K3 pour le Projet de forage d’exploration dans le bassin Jeanne D’Arc Description du projet désigné ExxonMobil Canada Limited (ExxonMobil) propose ...
French HTML
- Relevance: 221.05
- Déclaration de décision Émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à ExxonMobil Canada Ltd. a/s de Steve Edwards, Gestionnaire, sûreté, sécurité, santé, environnement et affaires externes Salle 1000, Place Cabot 100 rue New Gower St. John's (Terre-Neuve et Labrador) A1C 6K3 pour le Projet de forage d'exploration dans le bassin Jeanne D'Arc Description du projet désigné ExxonMobil Canada Limited (ExxonMobil) propose de ...
Document Environmental Assessment Report
- Project Husky Energy Exploration Drilling Project
- Document Category: Additional Information
- Reference Number: 60
- Updated: 2020-03-16
- Document: 134157E.pdf
- Relevance: 272.05
- JEANNE D’ARC BASIN EXPLORATION DRILLING PROJECT Environmental Assessment Report March 2020 IMPACT ASSESSMENT AGENCY OF CANADA JEANNE D’ARC BASIN EXPLORAT ION DRILL ING P ROJECT © Her Majesty the Queen in Right of Canada, represented by the Minister of Environment and Climate Change. Catalogue No: En106-227/2020E-PDF ISBN: 978-0-660-33453-0 This publication may be reproduced in whole or in part for non-commercial purposes, and ...
1 alternate format found
English HTML
- Relevance: 272.05
- Jeanne D'Arc Basin Exploration Drilling Project Environmental Assessment Report March 2020 © Her Majesty the Queen in Right of Canada, represented by the Minister of Environment and Climate Change. Catalogue No: En106-227/2020E-PDF ISBN: 978-0-660-33453-0 This publication may be reproduced in whole or in part for non-commercial purposes, and in any format, without charge or further permission. Unless otherwise specified, you may not reproduce materials, in whole or in part, for the ...
Document Environmental Assessment Decision Statement - Husky Oil Operations Ltd.
- Project Husky Energy Exploration Drilling Project
- Document Category: Additional Information
- Reference Number: 61
- Updated: 2020-03-16
- Document: 134170E.pdf
- Relevance: 272.05
- Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Husky Oil Operations Limited c/o Gareth Igloliorte, Senior Manager, Safety, Operational Integrity and Environment 351 Water Street, suite 107 St. John’s, NL A1C 1C2 for the Jeanne D'Arc Basin Exploration Drilling Project Description of the Designated Project Husky Oil Operations Limited (Husky) is proposing to conduct an exploration drilling project within offshore ...
3 alternate formats found
English HTML
- Relevance: 272.05
- Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Husky Oil Operations Limited c/o Gareth Igloliorte, Senior Manager, Safety, Operational Integrity and Environment 351 Water Street, suite 107 St. John's, NL A1C 1C2 for the Jeanne D'Arc Basin Exploration Drilling Project Description of the Designated Project Husky Oil Operations Limited (Husky) is proposing to conduct an exploration drilling project within offshore exploration ...
French HTML
- Relevance: 221.05
- Déclaration de décision Émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Husky Oil Operations Ltd. a/s de Gareth Igloliorte, Gestionnaire principal, sûreté, intégrité opérationnelle et environnement Salle 107, 352 rue Water St. John's (Terre-Neuve et Labrador) A1C IC2 pour le Projet de forage d'exploration dans le bassin Jeanne D'Arc Description du projet désigné Husky Oil Operations Ltd. (Husky) propose de réaliser un projet de ...
French PDF
- Relevance: 221.05
- Déclaration de décision Émise aux termes de l’article 54 de la Loi canadienne sur l’évaluation environnementale (2012) à Husky Oil Operations Ltd. a/s de Gareth Igloliorte, Gestionnaire principal, sûreté, intégrité opérationnelle et environnement Salle 107, 352 rue Water St. John’s (Terre-Neuve et Labrador) A1C IC2 pour le Projet de forage d’exploration dans le bassin Jeanne D’Arc Description du projet désigné Husky Oil Operations Ltd. (Husky) propose de réaliser un ...
Document From the Impact Assessment Agency of Canada to Husky Oil Operations Ltd. and ExxonMobil Canada Ltd. re: Response to transfer of share in exploration licence 1151
- Project Husky Energy Exploration Drilling Project
- Document Category: Additional Information
- Reference Number: 39
- Updated: 2019-10-15
- Document: 132914E.html
- Relevance: 262.41
- October 15, 2019 Sent by E-mail Steve Edwards SSHE and External Affairs Manager ExxonMobil Canada Ltd. Suite 1000, 100 New Gower Street St. John's, NL Canada, A1C 6K3 Gareth Igloliorte Husky Oil Operations Ltd. 351 Water Street St. John's, NL Canada, A1C 1C2 RE: Information Requirements for Inclusion of ExxonMobil Canada Ltd in the Environmental ...
1 alternate format found
English PDF
- Relevance: 262.41
- Suite 200 Bureau 200 1801 Hollis Street 1801, rue Hollis Halifax NS B3J 3N4 Halifax, NÉ B3J 3N4 www.canada.ca/iaac www.canada.ca/aeic October 15, 2019 Sent by E-mail Steve Edwards SSHE and External Affairs Manager ExxonMobil Canada Ltd. Suite 1000, 100 New Gower Street St. John's, NL Canada, A1C 6K3 Gareth Igloliorte Husky Oil Operations Ltd. 351 ...
Document From the Canadian Environmental Assessment Agency to Husky Oil Operations Ltd. re: Conformity of Responses to Information Requests Related to the Environmental Impact Statement Round 2 (see reference document #36)
- Project Husky Energy Exploration Drilling Project
- Document Category: Additional Information
- Reference Number: 37
- Updated: 2019-08-14
- Document: 132186E.html
- Relevance: 258.7
- From the Canadian Environmental Assessment Agency to Husky Oil Operations Ltd. re: Conformity of Responses to Information Requests Related to the Environmental Impact Statement Round 2 Canadian Environmental Assessment Agency Suite 200 1801 Hollis Street Halifax NS B3J 3N4 Agence canadienne d'évaluation environnementale Bureau 200 1801 rue Hollis Halifax, NE B3J 3N4 August 14, 2019 Sent by E-mail Steve Bettles Manager, Corporate Responsibility Husky Energy 351 Water Street, ...
1 alternate format found
English PDF
- Relevance: 258.7
- www.acee-ceaa.gc.ca www.ceaa-acee.gc.ca Suite 200 Bureau 200 1801 Hollis Street 1801 rue Hollis Halifax NS B3J 3N4 Halifax, NE B3J 3N4 August 14, 2019 Sent by E-mail Steve Bettles Manager, Corporate Responsibility Husky Energy 351 Water Street, Suite 107 St. John’s, NL A1C 1C2 Steve.Bettles@huskyenergy.com ...
Document From the Canadian Environmental Assessment Agency to Husky Oil Operations Ltd. re: Information Requests Related to the Environmental Impact Statement Round 2
- Project Husky Energy Exploration Drilling Project
- Document Category: Additional Information
- Reference Number: 35
- Updated: 2019-07-12
- Document: 130885E.pdf
- Relevance: 256.78
- l*l Canadian Environmental Assessment Agency Agence canadienne d'évaluation environnementale Suite 200 1801 Hollis Street Halifax NS B3J 3N4 Bureau 200 1801rue Hollis Halifax, NE B3J 3N4 July t2,2Ot9 Sent by E-mail Steve Bettles Husky Oil Operations Ltd. 35L Water Street, Suite 1.05 St. John's, Canada AICtC,z Steve. Bettles@ h uskvene rgv.com Dear Mr. Bettles, SUBJECT: Husky Energy Exploration Drilling Project - Round ll lnformation Requirements On December 2I,20L8, the ...
1 alternate format found
English HTML
- Relevance: 256.78
- Canadian Environmental Assessment Agency Suite 200 1801 Hollis Street Halifax NS B3J 3N4 Agence canadienne d'évaluation environnementale Bureau 200 1801 rue Hollis Halifax, NE B3J 3N4 July ...
Document From the Canadian Environmental Assessment Agency to Husky Oil Operations Ltd. re: Conformity of Responses to Information Requests Related to the Environmental Impact Statement Round 1
- Project Husky Energy Exploration Drilling Project
- Document Category: Additional Information
- Reference Number: 32
- Updated: 2019-04-25
- Document: 129413E.html
- Relevance: 252.35
- From the Canadian Environmental Assessment Agency to Husky Oil Operations Ltd. re: Conformity of Responses to Information Requests Related to the Environmental Impact Statement Round 1 Canadian Environmental Assessment Agency Suite 200 1801 Hollis Street Halifax NS B3J 3N4 Agence canadienne d'évaluation environnementale Bureau 200 1801 rue Hollis Halifax, NE B3J 3N4 April 25, 2019 Sent by E-mail David Pinsent Senior Environmental Advisor Husky Energy 351 Water Street, ...
1 alternate format found
English PDF
- Relevance: 252.35
- l*l Canadian Environmental Assessment Agency Agence canadienne d'évaluation environnementale Suite 200 1801 Hollis Street Halifax NS B3J 3N4 Bureau 200 1801 rue Hollis Halifax, NE B3J 3N4 April25,2019 Sent by E-mail David Pinsent Senior Environmental Advisor Husky Energy 351 Water Street, Suite 105 St. John's, NL A1C 1C2 David. Pi nse nt (ô h us kve n e rgv. co m Dear Mr. Pinsent, SUBJECT: Outcome of conformity review of responses to Round I lnformation Requirements for the ...
Document From the Canadian Environmental Assessment Agency to Husky Oil Operations Ltd. re: Information Requests Related to the Environmental Impact Statement Round 1
- Project Husky Energy Exploration Drilling Project
- Document Category: Additional Information
- Reference Number: 30
- Updated: 2018-12-21
- Document: 126434E.pdf
- Relevance: 245.65
- ...
1 alternate format found
English HTML
- Relevance: 245.65
- From the Canadian Environmental Assessment Agency to Husky Oil Operations Ltd. re: Information Requests Related to the Environmental Impact Statement Round 1 Transmittal Letter Information Requirements
Document From the Canadian Environmental Assessment Agency to Husky Oil Operations Ltd. re: Conformity of the Environmental Impact Statement
- Project Husky Energy Exploration Drilling Project
- Document Category: Additional Information
- Reference Number: 29
- Updated: 2018-10-11
- Document: 125753E.html
- Relevance: 242.05
- From the Canadian Environmental Assessment Agency to Husky Oil Operations Ltd. re: Conformity of the Environmental Impact Statement Canadian Environmental Assessment Agency Suite 200 1801 Hollis Street Halifax NS B3J 3N4 Agence canadienne d'évaluation environnementale Bureau 200 1801 rue Hollis Halifax, NE B3J 3N4 October 11, 2018 Sent by E-mail Dave Pinsent Senior Environmental Advisor Husky Energy Atlantic Region 351 Water St. Suite 105 St. John's, NL A1C 1C2 Dear Mr. ...
1 alternate format found
English PDF
- Relevance: 242.05
- 1+1 Canadian Environmental Assessment Agency Suite 200 1801 Hollis Street Halifax NS B3J 3N4 October 11, 2018 Sent by E-mail Dave Pinsent Agence canadienne d 'evaluation environnementale Bureau 200 1801 rue Hollis Halifax, NE B3J 3N4 Senior Environmental Advisor Husky Energy Atlantic Region 351 Water St. Suite 105 St. John's, NL A1C 1C2 Dear Mr. Pinsent, SUBJECT: Outcome of conformity review of the Environmental Impact Statement On September 7, 2018, the ...
Document Updated Final Environmental Impact Statement Guidelines
- Project Husky Energy Exploration Drilling Project
- Document Category: Additional Information
- Reference Number: 23
- Updated: 2018-05-31
- Document: 132303E.html
- Relevance: 235.71
- Guidelines for the Preparation of an Environmental Impact Statement pursuant to the Canadian Environmental Assessment Act, 2012 Husky Energy Exploration Drilling Project Husky Oil Operations Ltd. May 31, 2018 Table of Contents Disclaimer Abbreviations and Short Forms Part 1 - Key Considerations 1. Introduction 2. Guiding Principles 2.1. Environmental assessment as a planning and decision making tool 2.2. Public participation 2.3. Engagement with Indigenous groups 2.4. ...
1 alternate format found
English PDF
- Relevance: 235.71
- GUIDELINES FOR THE PREPARATION OF AN ENVIRONMENTAL IMPACT STATEMENT pursuant to the Canadian Environmental Assessment Act, 2012 Husky Energy Exploration Drilling Project Husky Oil Operations Ltd. May 31, 2018 Husky Energy Exploration Drilling Project: Guidelines for the Preparation of the Environmental Impact Statement ii TABLE OF CONTENTS GUIDELINES FOR THE PREPARATION OF AN ENVIRONMENTAL IMPACT STATEMENT ...
Document From the Canadian Environmental Assessment Agency to Husky Energy re: Response to Changes to Husky Energy's Designated Project (see reference document # 21 and 22)
- Project Husky Energy Exploration Drilling Project
- Document Category: Additional Information
- Reference Number: 24
- Updated: 2018-05-31
- Document: 122874E.html
- Relevance: 235.71
- From the Canadian Environmental Assessment Agency to Husky Energy re: Response to Changes to Husky Energy's Designated Project (see reference document # 21 and 22) Canadian Environmental Assessment Agency Suite 200 1801 Hollis Street Halifax, NS B3J 3N4 Agence canadienne d'évaluation environnementale Bureau 200 1801 rue Hollis Halifax, NE B3J 3N4 May 31, 2018 Agency File No.: 80130 Gareth Igoliorte Husky Energy 351 Water Street St. John's NL A1C ...
1 alternate format found
English PDF
- Relevance: 235.71
- 1+1 Canadian Environmental ~essment Agency SUite 200 1801 Hollis Street Halifax, NS B3J 3N4 May 31,2018 Gareth lgoliorte Husky Energy 351 Water Street Agence canadienne d'evaluation ertvironnementale Bureau 200 1 801 rue Hollis Halifax, NE B3J 3N4 St. John's NL A 1 C 1 C2 Gareth .iqloliorte@ huskyenerqy.com Dear Mr. lgoliorte: Agency File No.: 80130 SUBJECT: Inclusion of Exploration Licence 1155 in the Husky Energy Exploration Drilling Project subject to ...
Document From the Canadian Environmental Assessment Agency to Husky Energy re: Exploration Licences 1121 and 1155
- Project Husky Energy Exploration Drilling Project
- Document Category: Additional Information
- Reference Number: 22
- Updated: 2018-04-30
- Document: 122448E.pdf
- Relevance: 234.31
1 alternate format found
English HTML
- Relevance: 234.31
- From the Canadian Environmental Assessment Agency to Husky Energy re: Exploration Licences 1121 and 1155 Canadian Environmental Assessment Agency Suite 200 1801 Hollis Street Halifax NS B3J 3N4 Agence canadienne d'évaluation environnementale Bureau 200 1801 rue Hollis Halifax, N.-É. B3J 3N4 April 30, 2018 Sent by E-mail Gareth Igloliorte Husky Energy Atlantic Region 351 Water Street Suite 105 St. John's NL Gareth.Igloliorte@huskyenergy.com Mr. Igloliorte: SUBJECT: ...
Document From the Canadian Environmental Assessment Agency to ExxonMobil Canada Ltd. re: Transfer of Ownership of Exploration Licence 1134
- Project Husky Energy Exploration Drilling Project
- Document Category: Additional Information
- Reference Number: 20
- Updated: 2018-03-23
- Document: 122414E.pdf
- Relevance: 232.63
1 alternate format found
English HTML
- Relevance: 232.63
- From the Canadian Environmental Assessment Agency to ExxonMobil Canada Ltd. re: Transfer of Ownership of Exploration Licence 1134 Canadian Environmental Assessment Agency Suite 200 1801 Hollis Street Halifax NS B3J 3N4 Agence canadienne d'évaluation environnementale Bureau 200 1801 rue Hollis Halifax, N.-É. B3J 3N4 March 23, 2018 Sent by E-mail Dave Pinsent Husky Energy Atlantic Region 351 Water Street Suite 105 St. John's NL David.Pinsent@huskyenergy.com Dear Mr. ...
Document From the Canadian Environmental Assessment Agency to Husky Oil Operations Ltd. re: Additional Information Requirements Regarding Engagement with Indigenous Groups
- Project Husky Energy Exploration Drilling Project
- Document Category: Additional Information
- Reference Number: 18
- Updated: 2017-07-27
- Document: 119744E.pdf
- Relevance: 223.07
1 alternate format found
English HTML
- Relevance: 223.07
- From the Canadian Environmental Assessment Agency to Husky Oil Operations Ltd. re: Additional Information Requirements Regarding Engagement with Indigenous Groups Canadian Environmental Assessment Agency Suite 200 1801 Hollis Street Halifax NS B3J 3N4 Agence canadienne d'évaluation environnementale Bureau 200 1801 rue Hollis Halifax, NE B3J 3N4 July 27, 2017 Agency File No.: 005580 David Pinsent Husky Energy Atlantic Region 351 Water St. Suite 105 St. John's, NL A1C ...