Document Analysis of Woodfibre LNG Limited Partnership's Proposed Addition of a Floating Worker Accommodation Facility to the Woodfibre LNG Project

  • Project Woodfibre LNG Project
  • Document Category: Additional Information
  • Reference Number: 1005
  • Updated: 2023-11-29
  • Document: 153604E.pdf
  • Relevance: 387.96
  • Analysis of Proposed Changes: Woodfibre LNG Project FINAL REPORT November 2023 IMPACT ASSESSMENT AGENCY OF CANADA FINAL REPORT i Table of Contents Table of Contents ............................................................................................................... i 1. Introduction ............................................................................................................... 1 2. Proposed Project Design Changes ...
1 alternate format found
French PDF
  • Relevance: 336.96
  • Analyse des changements proposés : Projet de gaz naturel liquéfié Woodfibre RAPPORT FINAL Novembre 2023 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA RAPPORT FINAL i Table des matières Table des matières ............................................................................................................. i 1. Introduction ............................................................................................................... 1 2. ...

Document Analysis of Woodfibre LNG Limited Partnership's Proposed Changes to the Woodfibre LNG Project

  • Project Woodfibre LNG Project
  • Document Category: Additional Information
  • Reference Number: 1004
  • Updated: 2023-08-04
  • Document: 152688E.pdf
  • Relevance: 375.77
  • Impact Assessment Agency of Canada Agence d’évaluation d’impact du Canada Impact Assessment Agency of Canada ANALYSIS OF PROPOSED CHANGES TO THE WOODFIBRE LNG PROJECT DECISION STATEMENT CONDITIONS AUGUST 2023 2 Table of Contents 1. Introduction ................................................................................................................................................ 3 1.1. Impact Assessment Act ...
1 alternate format found
French PDF
  • Relevance: 324.77
  • Agence d’évaluation d’impact du Canada Impact Assessment Agency of Canada Agence d’évaluation d’impact du Canada ANALYSE DES CHANGEMENTS PROPOSÉS À LA DÉCLARATION DE DÉCISION DU PROJET DE GNL WOODFIBRE AOÛT 2023 2 Table des matières Agence d’évaluation d’impact du Canada ............................................................................................................ 1 Table des matières ...

Document Amended Decision Statement

  • Project Woodfibre LNG Project
  • Document Category: Additional Information
  • Reference Number: 1003
  • Updated: 2023-08-04
  • Document: 152687E.pdf
  • Relevance: 375.77
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Woodfibre LNG Limited Partnership c/o Christine Kennedy, President of Woodfibre Management Limited Manager on behalf of the Woodfibre LNG Limited Partnership #1020 – 1075 W. Georgia Street Vancouver, British Columbia V6E 3C9 for the Woodfibre LNG Project Description of the Designated Project Woodfibre LNG Limited Partnership is proposing the construction ...
1 alternate format found
French PDF
  • Relevance: 324.77
  • Déclaration de décision Republiée aux termes de l’article 54 de la Loi canadienne sur l’évaluation environnementale (2012) à Woodfibre LNG Limited Partnership c/o Christine Kennedy, Présidente de Woodfibre Management Limited Gestionnaire au nom de Woodfibre LNG Limited Partnership 1020 – 1075, rue Georgia Ouest Vancouver (Colombie-Britannique) V6E 3C9 pour le Projet de gaz naturel liquéfié Woodfibre Description du projet désigné Woodfibre LNG limitée propose ...

Document Draft Analysis of Woodfibre LNG Limited Proposed Changes to the Woodfibre LNG Project

  • Project Woodfibre LNG Project
  • Document Category: For Public Participation
  • Reference Number: 449
  • Updated: 2022-11-17
  • Document: 145527E.pdf
  • Relevance: 350.15
  • Impact Assessment Agency of Canada Agence d’évaluation d’impact du Canada Impact Assessment Agency of Canada DRAFT ANALYSIS OF PROPOSED CHANGES TO THE WOODFIBRE LNG PROJECT DECISION STATEMENT CONDITIONS NOVEMBER 2022 2 Table of Contents Impact Assessment Agency of Canada ............................................................................................................... 1 Table of Contents ...
1 alternate format found
French PDF
  • Relevance: 299.15
  • Agence d’évaluation d’impact du Canada Impact Assessment Agency of Canada 1 Agence d’évaluation d’impact du Canada ANALYSE PROVISOIRE DES CHANGEMENTS PROPOSÉS AUX CONDITIONS DE LA DÉCLARATION DE DÉCISION DU PROJET DE GNL WOODFIBRE NOVEMBRE 2022 Table des matières Agence d’évaluation d’impact du Canada ............................................................................................................ 1 Table des matières ...

Document Public Notice - Public Comments Invited on Proposed Changes to the Project

  • Project Woodfibre LNG Project
  • Document Category: For Public Participation
  • Reference Number: 447
  • Updated: 2022-11-17
  • Document: 145821E.html
  • Relevance: 350.15
  • Public Notice Woodfibre LNG Project — Public Comments Invited on Proposed Changes to Conditions What is happening? December 16, 2022 — The deadline to submit written comments has been extended from December 19, 2022, to January 30, 2023. November 17, 2022 — The Impact Assessment Agency of Canada (the Agency) is holding a public comment period as part of the post-decision phase for the Woodfibre LNG Project, a natural gas liquefaction facility and marine terminal located seven ...
1 alternate format found
French HTML
  • Relevance: 299.15
  • Avis public Projet de gaz naturel liquéfié Woodfibre — Période de consultation publique sur les modifications proposées aux conditions Que se passe-t-il? 16 décembre 2022 — La date limite pour présenter des commentaires écrits a été reportée du 19 décembre 2022 au 30 janvier 2023. Le 17 novembre 2022 — L'Agence d'évaluation d'impact du Canada (l'Agence) tient une période de consultation publique dans le cadre de l'étape suivant la décision du projet de gaz naturel liquéfié Woodfibre, ...

Document Public Notice - Federal Funding Allocated to Participate in the Environmental Assessment

  • Project Woodfibre LNG Project
  • Document Category: Additional Information
  • Reference Number: 444
  • Updated: 2021-03-24
  • Document: 138428E.html
  • Relevance: 298.54
  • Public Notice Woodfibre LNG Project — Participant Funding Allocated The Impact Assessment Agency of Canada allocated additional federal funds to the following recipients to assist their participation in specific activities related to the environmental assessment by substitution for this proposed project. Details of Funding Allocation for the Project Recipients Additional Funding Allocation Previous Funding Allocation Total Funding Allocation Citizens for My Sea to Sky Society $ ...
1 alternate format found
French HTML
  • Relevance: 247.54
  • Avis public Projet de gaz naturel liquéfié Woodfibre — Attribution d'une aide financière aux participants L'Agence d'évaluation d'impact du Canada a attribué de l'aide financière fédérale additionnelle aux bénéficiaires suivants pour favoriser leur participation à des activités précises liées à l'évaluation environnementale de substitution pour ce projet. Répartition de l'aide financière pour le projet Bénéficiaires Aide financière additionnelle Aide financière initiale Aide financière ...

Document Memorandum of Understanding

  • Project Woodfibre LNG Project
  • Document Category: Additional Information
  • Reference Number: 443
  • Updated: 2021-03-05
  • Document: 138201E.pdf
  • Relevance: 297.1
  • Memorandum of Understanding Between Squamish Nation And Environmental Assessment Office And Impact Assessment Agency of Canada Background Woodfibre LNG Ltd. has proposed project changes which could lead to an amendment (Amendment) to the Environmental Assessment Certificates issued to it by Squamish Nation on October 14, 2015 (#2015-001) and the Province of British Columbia on October 26, 2015 (#E1502) and to the Decision Statement issued by the Minister of the Environment ...
1 alternate format found
French PDF
  • Relevance: 246.1
  • Protocole d’entente entre la Nation des Squamish et le Bureau d’évaluation environnementale et l’Agence d’évaluation d’impact du Canada Contexte Woodfibre LNG Ltée a proposé d’apporter des changements au projet qui pourraient entraîner une modification (ci-après appelée « modification » ou « modifications ») des certificats d’évaluation environnementale fournis à cette société par la Nation des Squamish le 14 octobre 2015 (no 2015-001) et par la province de la ...

Document News Release - Participant Funding Available

  • Project Woodfibre LNG Project
  • Document Category: News Releases
  • Reference Number: 439
  • Updated: 2020-03-05
  • Document: 134103E.html
  • Relevance: 271.37
  • News Release Woodfibre LNG Project — Participant Funding Available for Post-Decision Phase March 5, 2020 — Ottawa — Impact Assessment Agency of Canada The Impact Assessment Agency of Canada (the Agency) is making funding available through its Participant Funding Program to assist the participation of the public and Indigenous peoples in the post-decision phase for the Woodfibre LNG Project, a proposed liquefied natural gas facility located seven kilometres southwest of Squamish, British ...
1 alternate format found
French HTML
  • Relevance: 220.37
  • Communiqué Projet de gaz naturel liquéfié Woodfibre — Disponibilité d'une aide financière aux participants pour la phase suivant la décision Le 5 mars 2020 — Ottawa — Agence d'évaluation d'impact du Canada L'Agence d'évaluation d'impact du Canada (l'Agence) annonce la disponibilité d'une aide financière offerte dans le cadre de son programme d'aide financière aux participants visant à favoriser la participation du public et des peuples autochtones à la phase suivant la décision concernant ...

Document Public Notice - Participant Funding Available

  • Project Woodfibre LNG Project
  • Document Category: For Public Participation
  • Reference Number: 440
  • Updated: 2020-03-05
  • Document: 134107E.html
  • Relevance: 271.37
  • Public Notice Woodfibre LNG Project — Participant Funding Available for Post-Decision Phase March 5, 2020 — The Impact Assessment Agency of Canada (the Agency) is making funding available through its Participant Funding Program to assist the participation of the public and Indigenous peoples in the post-decision phase for the Woodfibre LNG Project, a proposed liquefied natural gas facility located seven kilometres southwest of Squamish, British Columbia, on the northwestern shoreline of Howe ...
1 alternate format found
French HTML
  • Relevance: 220.37
  • Avis public Projet de gaz naturel liquéfié Woodfibre — Disponibilité d'une aide financière aux participants pour la phase suivant la décision Le 5 mars 2020 — L'Agence d'évaluation d'impact du Canada (l'Agence) annonce une aide financière offerte dans le cadre du Programme d'aide financière aux participants visant à appuyer la participation du public et des peuples autochtones à la phase suivant la décision concernant le projet de gaz naturel liquéfié Woodfibre, une installation de gaz ...

Document Updated Public Notice - Additional Federal Funding Allocated to Participate in the Environmental Assessment

  • Project Woodfibre LNG Project
  • Document Category: Additional Information
  • Reference Number: 437
  • Updated: 2018-08-30
  • Document: 137080E.html
  • Relevance: 240.01
  • Updated Public Notice Woodfibre LNG Project — Additional Participant Funding Allocated Update — December 3, 2020 — The Agency amended this notice on December 3, 2020. August 30, 2018 — The Canadian Environmental Assessment Agency (the Agency) allocated an additional $18,000 in federal funds in February 2017 to four Indigenous groups to assist their participation in reviewing and providing comments on proposed changes to the Woodfibre LNG Project, located in British Columbia. Details of ...
1 alternate format found
French HTML
  • Relevance: 189.01
  • Avis public mis à jour Projet de gaz naturel liquéfié Woodfibre — Attribution d'une aide financière additionnelle aux participants Mis à jour — 3 décembre 2020 — L'Agence a modifié cet avis public le 3 décembre 2020. Le 30 août 2018 — L'Agence canadienne d'évaluation environnementale (l'Agence) a attribué en février 2017 une aide financière additionnelle de 18 000 $ à quatre groupes autochtones pour favoriser leur participation à l'examen et à la formulation de commentaires au sujet des ...

Document Notice of the Reissuing of Environmental Assessment Decision Statement

  • Project Woodfibre LNG Project
  • Document Category: Additional Information
  • Reference Number: 436
  • Updated: 2018-03-07
  • Document: 121697E.html
  • Relevance: 231.96
  • Woodfibre LNG Project Re-issuing of Environmental Assessment Decision Statement March 7, 2018 - The Honourable Catherine McKenna, Minister of Environment and Climate Change, re-issued a Decision Statement under the Canadian Environmental Assessment Act, 2012  for the Woodfibre LNG Project (the Project). The Decision Statement is being re-issued in order to modify certain conditions included in the Decision Statement in response to potential adverse environmental effects of changes to the ...
1 alternate format found
French HTML
  • Relevance: 180.96
  • Projet de gaz naturel liquéfié Woodfibre Republication de la déclaration de décision relative à l'évaluation environnementale 7 mars 2018 – L'Honorable Catherine McKenna, ministre de l'Environnement et du Changement climatique, a émis de nouveau une déclaration de décision en vertu de la Loi canadienne d'évaluation environnementale (2012) pour le projet de gaz naturel liquéfié Woodfibre (le projet). La republication de la déclaration de décision vise à modifier certaines conditions ...

Document Environmental Assessment Decision Statement Reissued

  • Project Woodfibre LNG Project
  • Document Category: Additional Information
  • Reference Number: 434
  • Updated: 2018-03-07
  • Document: 121926E.html
  • Relevance: 231.96
  • Decision Statement Reissued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Woodfibre LNG Limited c/o Byng Giraud, Vice President, Corporate Affairs #1020 – 1075 W. Georgia Street Vancouver, British Columbia V6E 3C9 for the Woodfibre LNG Project Description of the Designated Project Woodfibre LNG Limited is proposing the construction and operation of a liquefied natural gas facility (LNG) located seven kilometres southwest of Squamish, British Columbia, ...
3 alternate formats found
English PDF
  • Relevance: 231.96
  • Decision Statement Reissued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Woodfibre LNG Limited c/o Byng Giraud, Vice President, Corporate Affairs #1020 – 1075 W. Georgia Street Vancouver, British Columbia V6E 3C9 for the Woodfibre LNG Project Description of the Designated Project Woodfibre LNG Limited is proposing the construction and operation of a liquefied natural gas facility (LNG) located seven kilometres southwest of Squamish, ...
French HTML
  • Relevance: 180.96
  • Déclaration de décision Republiée aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Woodfibre LNG limitée a/s de Byng Giraud, vice-président, Affaires générales 1020 – 1075, rue Georgia Ouest Vancouver (Colombie-Britannique) V6E 3C9 pour le Projet de gaz naturel liquéfié Woodfibre Description du projet désigné Woodfibre LNG limitée propose de construire et d'exploiter une installation de production de gaz naturel liquéfié (GNL) qui ...
French PDF
  • Relevance: 180.96
  • Déclaration de décision Republiée aux termes de l’article 54 de la Loi canadienne sur l’évaluation environnementale (2012) à Woodfibre LNG limitée a/s de Byng Giraud, vice-président, Affaires générales 1020 – 1075, rue Georgia Ouest Vancouver (Colombie-Britannique) V6E 3C9 pour le Projet de gaz naturel liquéfié Woodfibre Description du projet désigné Woodfibre LNG limitée propose de construire et d'exploiter une installation de production de gaz naturel ...

Document Analysis on Woodfibre LNG Limited's Report Pursuant to Conditions 2.10 and 2.11 of the Decision Statement

  • Project Woodfibre LNG Project
  • Document Category: Additional Information
  • Reference Number: 435
  • Updated: 2018-02-20
  • Document: 121696E.pdf
  • Relevance: 231.32
  • Analysis on Woodfibre LNG Limited’s Report Pursuant to Conditions 2.10 and 2.11 of the Decision Statement Woodfibre LNG Project February 2018 2 | P a g e Table of Contents 1 Introduction .................................................................................................................. 4 1.1 Structure of the Document ......................................................................................... 6 2 Proposed Project Design Changes ...
3 alternate formats found
English HTML
  • Relevance: 231.32
  • Analysis on Woodfibre LNG Limited's Report Pursuant to Conditions 2.10 and 2.11 of the Decision Statement Woodfibre LNG Project February 2018 Table of Contents 1 Introduction 1.1 Structure of the Document 2 Proposed Project Design Changes 2.1 Change from Seawater to Air Cooling 2.2 Mill Creek Water Intake 2.3 Water Extraction at Woodfibre Creek 2.4 Extension of Operation from 25 to 40 Years 3 Potential Adverse Environmental Effects from Proposed Project Changes 3.1 ...
French PDF
  • Relevance: 180.32
  • Analyse du rapport de Woodfibre LNG Limited concernant les conditions 2.10 et 2.11 de la déclaration de décision Projet de gaz naturel liquéfié Woodfibre Février 2018 2 | P a g e Table des matières 1 Introduction .............................................................................................................................. 4 1.1 Structure du document ............................................................................................... 6 2 ...
French HTML
  • Relevance: 180.32
  • Analyse du rapport de Woodfibre LNG Limited concernant les conditions 2.10 et 2.11 de la déclaration de décision Projet de gaz naturel liquéfié Woodfibre Février 2018 Table des matières 1 Introduction 1.1 Structure du document 2 Modifications proposées à la conception du projet 2.1 Remplacement du système de refroidissement à l'eau de mer par un système de refroidissement à l'air 2.2 Prise d'eau du ruisseau Mill 2.3 Extraction d'eau dans le ruisseau Woodfibre 2.4 ...

Document Increasing Public Access to Compliance and Monitoring Information

  • Project Woodfibre LNG Project
  • Document Category: Additional Information
  • Reference Number: 432
  • Updated: 2017-01-04
  • Document: 116675E.pdf
  • Relevance: 216.29
  • Woodfibre LNG Project Increasing Public Access to Compliance and Monitoring Information The Canadian Environmental Assessment Agency (the Agency) and the British Columbia Environmental Assessment Office (the EAO) will be posting documentation that Woodfibre LNG Limited provides to the Agency and the EAO in regards to meeting the federal and provincial environmental assessment conditions of approval that were issued for the Woodfibre LNG Project. In addition, both the Agency and the ...
1 alternate format found
English HTML
  • Relevance: 216.29
  • Woodfibre LNG Project Increasing Public Access to Compliance and Monitoring Information The Canadian Environmental Assessment Agency (the Agency) and the British Columbia Environmental Assessment Office (the EAO) will be posting documentation that Woodfibre LNG Limited provides to the Agency and the EAO in regards to meeting the federal and provincial environmental assessment conditions of approval that were issued for the Woodfibre LNG Project. In addition, both the Agency and the EAO will ...

Document Decision Statement

  • Project Woodfibre LNG Project
  • Document Category: Additional Information
  • Reference Number: 429
  • Updated: 2016-03-18
  • Document: 109540E.pdf
  • Relevance: 208.72
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Woodfibre LNG Limited c/o Byng Giraud, Vice President, Corporate Affairs #1020 – 1075 W. Georgia Street Vancouver, British Columbia V6E 3C9 for the Woodfibre LNG Project Description of the Designated Project Woodfibre LNG Limited is proposing the construction and operation of a liquefied natural gas facility (LNG) located seven kilometres southwest of Squamish, ...
1 alternate format found
English HTML
  • Relevance: 208.72
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Woodfibre LNG Limited c/o Byng Giraud, Vice President, Corporate Affairs #1020 – 1075 W. Georgia Street Vancouver, British Columbia V6E 3C9 for the Woodfibre LNG Project Description of the Designated Project Woodfibre LNG Limited is proposing the construction and operation of a liquefied natural gas facility (LNG) located seven kilometres southwest of Squamish, British Columbia, on ...

Document Summary of Comments on the Analysis of Greenhouse Gas Emissions Associated with the Woodfibre Liquefied Natural Gas (LNG) Project

  • Project Woodfibre LNG Project
  • Document Category: Additional Information
  • Reference Number: 430
  • Updated: 2016-03-18
  • Document: 109544E.html
  • Relevance: 208.72
  • Summary of Comments on the Analysis of Greenhouse Gas Emissions Associated with the Woodfibre Liquefied Natural Gas (LNG) Project Introduction The Woodfibre LNG Project (the Project) underwent a federal environmental assessment under the Canadian Environmental Assessment Act, 2012 (CEAA 2012), substituted to British Columbia (B.C.). As part of the Government of Canada's interim approach to environmental assessment, the Canadian Environmental Assessment Agency (the Agency) sought advice on ...
1 alternate format found
English PDF
  • Relevance: 208.72
  • March 17, 2016 Summary of Comments on the Analysis of Greenhouse Gas Emissions Associated with the Woodfibre Liquefied Natural Gas (LNG) Project Introduction The Woodfibre LNG Project (the Project) underwent a federal environmental assessment under the Canadian Environmental Assessment Act, 2012 (CEAA 2012), substituted to British Columbia (B.C.). As part of the Government of Canada’s interim approach to environmental assessment, the Canadian Environmental Assessment Agency ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: