Document Analysis of Nemaska Lithium Inc. proposed changes to the Whabouchi Mining Project

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 123
  • Document Date: 2026-08-31
  • Document: 167849E.html
  • Relevance: 398.48
  • Analysis of Nemaska Lithium's Proposed Changes to the Whabouchi Mining Project Final Report July 2026 Table of contents 1. Introduction 2. Proposed project changes 3. Analysis in accordance with the Physical Activities Regulations 4. Consultation and engagement 4.1 Proponent engagement with Indigenous groups 4.2 IAAC consultation with Indigenous groups and the public 5. Assessment of potential adverse environmental effects 5.1 Fish ...
3 alternate formats found
English PDF
  • Relevance: 398.48
  • Analysis of Nemaska Lithium’s Proposed Changes to the Whabouchi Mining Project FINAL REPORT July 2026 IMPACT ASSESSMENT AGENCY OF CANADA FINAL REPORT i Table of contents 1. Introduction ............................................................................................................... 2 2. Proposed project changes ........................................................................................ 2 ...
French PDF
  • Relevance: 347.48
  • Analyse des changements proposés par Nemaska Lithium au projet minier Whabouchi RAPPORT FINAL Juillet 2026 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA RAPPORT F INAL i Table des matières 1. Introduction ............................................................................................................... 2 2. Changements proposés au projet ............................................................................. 2 ...
French HTML
  • Relevance: 347.48
  • Analyse des changements proposés par Nemaska Lithium au projet minier Whabouchi Rapport final Juillet 2026 Table des matières 1. Introduction 2. Changements proposés au projet 3. Analyse réalisée en vertu du Règlement sur les activités concrètes 4. Consultation et mobilisation 4.1 Mobilisation des groupes autochtones par le promoteur 4.2 Consultation de l'AEIC auprès des groupes autochtones et du public 5. Évaluation des effets ...

Document Amended decision statement

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 122
  • Document Date: 2026-08-31
  • Document: 167725E.pdf
  • Relevance: 398.48
  • Page 1 of 16 Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Nemaska Lithium Inc. c/o Vincent Perron Senior Director, Environment and Stakeholder Relations 600 De Maisonneuve Blvd West, Suite 750 Montréal, Québec H3A 3J2 for the Whabouchi Mining Project Description of the Designated Project Nemaska Lithium Inc. is proposing the construction, operation and decommissioning of an open-pit and underground ...
3 alternate formats found
English HTML
  • Relevance: 398.48
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Nemaska Lithium Inc. c/o Vincent Perron Senior Director, Environment and Stakeholder Relations 600 De Maisonneuve Blvd West, Suite 750 Montréal, Québec H3A 3J2 for the Whabouchi Mining Project Description of the Designated Project Nemaska Lithium Inc. is proposing the construction, operation and decommissioning of an open-pit and underground spodumene mine for ...
French PDF
  • Relevance: 347.48
  • Déclaration de décision Émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Nemaska Lithium Inc. a/s de Vincent Perron Directeur principal, Environnement et relations avec les parties prenantes 600 boul. de Maisonneuve Ouest, bureau 750 Montréal (Québec) H3A 3J2 pour le Projet minier Whabouchi Description du projet désigné Nemaska Lithium Inc. propose la construction, l’exploitation et la désaffectation ...
French HTML
  • Relevance: 347.48
  • Déclaration de décision émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Nemaska Lithium Inc. a/s de Vincent Perron Directeur principal, Environnement et relations avec les parties prenantes 600 boul. de Maisonneuve Ouest, bureau 750 Montréal (Québec) H3A 3J2 pour le Projet minier Whabouchi Description du projet désigné Nemaska Lithium Inc. propose la construction, l'exploitation et la désaffectation d'une mine à ...

Document Public notice - Public comments invited on proposed amendments to the decision statement

  • Project Whabouchi Mining Project
  • Document Category: For Public Participation
  • Reference Number: 119
  • Document Date: 2026-06-25
  • Document: 166873E.html
  • Relevance: 391.25
  • Public notice Public comments invited on proposed amendments to the decision statement What is happening? June 25, 2026 — The Impact Assessment Agency of Canada (IAAC) is holding a public comment period on proposed amendments to the decision statement for the Whabouchi Mining Project, in Quebec. Why is IAAC holding a public comment period? When the project's assessment was completed in 2015, it became subject to legally binding conditions that the proponent, Nemaska Lithium ...
1 alternate format found
French HTML
  • Relevance: 340.25
  • Avis public Période de consultation publique sur les modifications proposées à la déclaration de décision Que se passe-t-il? Le 25 juin 2026 — L'Agence d'évaluation d'impact du Canada (AEIC) tient une période de consultation publique sur les modifications proposées à la déclaration de décision pour le projet minier Whabouchi, au Québec. Pourquoi l'AEIC tient-elle une période de consultation publique? Lorsque l'évaluation du projet a été terminée en 2015, le projet a été ...

Document Draft amended decision statement

  • Project Whabouchi Mining Project
  • Document Category: For Public Participation
  • Reference Number: 121
  • Document Date: 2026-06-24
  • Document: 166889E.pdf
  • Relevance: 391.14
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Nemaska Lithium Inc. c/o Denis Isabel Vice-President Sustainable Development 600 Boul. de Maisonneuve Ouest, Suite 750 Montréal, Québec H3A 3J2 for the Whabouchi Mineing Project Description of the Designated Project Nemaska Lithium Inc. is proposing the to construction, operatione and decommissioning of an open-pit surface and underground spodumene mine for ...
3 alternate formats found
English HTML
  • Relevance: 391.14
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Nemaska Lithium Inc. c/o Denis Isabel Vice-President Sustainable Development 600 Boul. de Maisonneuve Ouest, Suite 750 Montréal, Québec H3A 3J2 for the Whabouchi Mineing Project Description of the Designated Project Nemaska Lithium Inc. is proposing the to construction, operatione and decommissioning of an open-pit surface and underground spodumene mine ...
French HTML
  • Relevance: 340.14
  • Déclaration de décision Émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Nemaska Lithium Inc. a/s de Denis Isabel Vice-président Développement durable 600 boul. de Maisonneuve Ouest, bureau 750 Montréal (Québec) H3A 3J2 pour le Projet minier Whabouchi Description du projet désigné Nemaska Lithium Inc. propose la construction, l'exploitation et la désaffectation d'une mine à ciel ouvert et souterraine de ...
French PDF
  • Relevance: 340.14
  • Déclaration de décision Émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Nemaska Lithium Inc. a/s de Denis Isabel Vice-président Développement durable 600 boul. de Maisonneuve Ouest, bureau 750 Montréal (Québec) H3A 3J2 pour le Projet minier Whabouchi Description du projet désigné Nemaska Lithium Inc. propose la construction, l’exploitation et la désaffectation d’une mine à ciel ouvert et souterraine de ...

Document Draft analysis of Nemaska Lithium's proposed changes to the Whabouchi Mining Project

  • Project Whabouchi Mining Project
  • Document Category: For Public Participation
  • Reference Number: 120
  • Document Date: 2026-06-24
  • Document: 166888E.pdf
  • Relevance: 391.14
  • Analysis of Nemaska Lithium’s Proposed Changes to the Whabouchi Mining Project DRAFT REPORT June 2026 IMPACT ASSESSMENT AGENCY OF CANADA DRAFT REPORT i Table of contents 1. Introduction ............................................................................................................... 2 2. Proposed project changes ........................................................................................ 2 3. ...
3 alternate formats found
English HTML
  • Relevance: 391.14
  • Analysis of Nemaska Lithium's Proposed Changes to the Whabouchi Mining Project Draft Report June 2026 Table of contents 1. Introduction 2. Proposed project changes 3. Analysis in accordance with the Physical Activities Regulations 4. Consultation and engagement 4.1 Proponent engagement with Indigenous groups 4.2 IAAC consultation with Indigenous groups and the public 5. Assessment of potential adverse environmental effetcts 5.1 Fish ...
French HTML
  • Relevance: 340.14
  • Analyse des changements proposés par Nemaska Lithium au projet minier Whabouchi Version provisoire du rapport Juin 2026 Table des matières 1. Introduction 2. Changements proposés au projet 3. Analyse réalisée en vertu du Règlement sur les activités concrètes 4. Consultation et mobilisation 4.1 Mobilisation des groupes autochtones par le promoteur 4.2 Consultation de l'AEIC auprès des groupes autochtones et du public 5. Évaluation des ...
French PDF
  • Relevance: 340.14
  • Analyse des changements proposés par Nemaska Lithium au projet minier Whabouchi VERSION PROVISOIRE DU RAPPORT Juin 2026 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA RAPPORT PROVISOIRE i Table des matières 1. Introduction ............................................................................................................... 2 2. Changements proposés au projet ...

Document Responses to the July 25, 2025, request for information (updated April 15, 2026)

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 117
  • Document Date: 2025-09-17
  • Document: 165504E.pdf
  • Relevance: 362.4
  • Montreal • Québec • Varennes • Sherbrooke • Trois-Rivières • Rouyn-Noranda • Amos Regina • Calgary • Edmonton • Saint John • Rivière-du-Loup www.gcmconsultants.com Responses to the request for information on July 25, 2025 – Complementary information for the Change Notice to the Whabouchi Mining Project dated January 25, 2025 ENV0514-1525-00 Whabouchi Mine – Nemaska Lithium April 10, 2026 INSPIRED ENGINEERING Revision Issuance Date 00_EN FINAL ...
1 alternate format found
French PDF
  • Relevance: 311.4
  • Montréal • Québec • Varennes • Sherbrooke • Trois-Rivières • Rouyn-Noranda • Amos Regina • Calgary • Edmonton • Saint John • Rivière-du-Loup www.gcmconsultants.com Réponses à la demande d’information du 25 juillet 2025 - Informations complémentaires sur l’avis de changement au projet minier Whabouchi du 25 janvier 2025 ENV0514-1525-00 Mine Whabouchi – Nemaska Lithium 17 septembre 2025 L ’ I N G É N I E R I E I N SP I R ÉE Révision Émission Date ...

Document Answers to Questions and Comments - Change Notice to the Whabouchi Mining Project: Updated July 9, 2025

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 114
  • Document Date: 2025-04-29
  • Document: 161601E.pdf
  • Relevance: 348.82
  • Montréal • Québec • Varennes • Sherbrooke • Trois-Rivières • Rouyn-Noranda • Amos Regina • Calgary • Edmonton • Saint-Jean • Rivière-du-Loup www.gcmconsultants.com Answers to Questions and Comments - Change Notice to the Whabouchi Mining Project January 15, 2025 ENV0514-1519-00_EN Whabouchi Mine – Nemaska Lithium April 24, 2025 INSPIRED ENGINEERING I N SP I R ED E N G I N E E R I N G Revision Issuance Date 00 FINAL 2025.04.24 James ...
1 alternate format found
French PDF
  • Relevance: 297.82
  • Montréal • Québec • Varennes • Sherbrooke • Trois-Rivières • Rouyn-Noranda • Amos Regina • Calgary • Edmonton • Saint-Jean • Rivière-du-Loup www.gcmconsultants.com Réponses aux questions et commentaires - Avis de changement au projet minier Whabouchi 15 janvier 2025 ENV0514-1519-00 Mine Whabouchi – Nemaska Lithium 24 avril 2025 L ’ I N G É N I E R I E I N SP I R ÉE Révision Émission Date 00 FINALE 2025.04.24 Baie James (Québec) ...

Document Notice - Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 110
  • Document Date: 2024-07-18
  • Document: 158132E.html
  • Relevance: 323.18
  • Notice — Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024 July 18, 2024 The Minister of the Environment has determined, pursuant to section 306 of the Budget Implementation Act, 2024, that the Decision Statements issued for the 36 Designated Projects listed below contain conditions that could have been included in a Decision Statement issued under subsection 65(1) of the amended Impact Assessment Act (IAA). This determination was made in ...
1 alternate format found
French HTML
  • Relevance: 272.18
  • Avis — Transition des déclarations de décision au titre de l'article 306 de la Loi d'exécution du budget de 2024 18 juillet 2024 Le ministre de l'Environnement a déterminé, conformément à l'article 306 de la Loi d'exécution du budget de 2024, que les déclarations de décision émises pour les 36 projets désignés énumérés ci-dessous contiennent des conditions qui auraient pu être incluses dans une déclaration de décision publiée en vertu du paragraphe 65(1) de la Loi sur l'évaluation ...

Document Amended Decision Statement

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 108
  • Document Date: 2023-09-19
  • Document: 153137E.html
  • Relevance: 298.61
  • Decision Statement Re-issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Nemaska Lithium Inc. c/o Denis Isabel Vice-President Sustainable Development 600 Boul. de Maisonneuve Ouest, Suite 750 Montréal, Quebec H3A 3J2 for the Whabouchi Mine Project Description of the Designated Project Nemaska Lithium Inc. is proposing to construct, operate and decommission an open-pit surface and underground spodumene mine for the purpose of producing ...
3 alternate formats found
English PDF
  • Relevance: 298.61
  • Decision Statement Re-issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Nemaska Lithium Inc. c/o Denis Isabel Vice-President Sustainable Development 600 Boul. de Maisonneuve Ouest, Suite 750 Montréal, Québec H3A 3J2 for the Whabouchi Mine Project Description of the Designated Project Nemaska Lithium Inc. is proposing to construct, operate and decommission an open-pit surface and underground spodumene mine for the purpose of ...
French PDF
  • Relevance: 247.61
  • Déclaration de décision Réémise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Nemaska Lithium Inc. a/s de Denis Isabel Vice-président Développement durable 600 boul. de Maisonneuve Ouest, bureau 750 Montréal (Québec) H3A 3J2 pour le Projet minier Whabouchi Description du projet désigné Nemaska Lithium Inc. propose la construction, l’exploitation et la désaffectation d’une mine à ciel ouvert et souterraine de ...
French HTML
  • Relevance: 247.61
  • Déclaration de décision Réémise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Nemaska Lithium Inc. a/s de Denis Isabel Vice-président Développement durable 600 boul. de Maisonneuve Ouest, bureau 750 Montréal (Québec) H3A 3J2 pour le Projet minier Whabouchi Description du projet désigné Nemaska Lithium Inc. propose la construction, l'exploitation et la désaffectation d'une mine à ciel ouvert et souterraine de ...

Document Analysis of Nemaska Lithium Inc. Proposed Changes to the Whabouchi Mining Project

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 109
  • Document Date: 2023-08-01
  • Document: 153132E.html
  • Relevance: 294.89
  • Analysis of Nemaska Lithium's Changes Made to the Whabouchi Mine Project August 2023 On this page List of Figures List of Tables 1. Introduction 2. Analysis of the changes to determine whether they are subject to the Regulations 3. Analysis of the changes made and the potential adverse environmental effects 3.1 Change of proponent and change to the project description 3.2 Analysis of potential adverse environmental effects 3.2.1 Operation of ...
3 alternate formats found
English PDF
  • Relevance: 294.89
  • Analysis of Nemaska Lithium’s Changes Made to the Whabouchi Mine Project AUGUST 2023 IMPACT ASSESSMENT AGENCY OF CANADA i Table of Contents List of Figures ................................................................................................................................................... ii List of Tables ...
French HTML
  • Relevance: 243.89
  • Analyse des changements apportés par Nemaska Lithium au projet minier Whabouchi Août 2023 Sur cette page Liste des figures Liste des tableaux 1. Introduction 2. Analyse d'assujettissement des modifications au Règlement 3. Analyse des modifications apportées et des effets environnementaux négatifs potentiels 3.1 Changement de promoteur et modification à la description de projet 3.2 Analyse des effets environnementaux négatifs potentiels 3.2.1 ...
French PDF
  • Relevance: 243.89
  • Analyse des changements apportés par Nemaska Lithium au projet minier Whabouchi AOÛT 2023 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA i Table des matières Liste des figures ............................................................................................................................................... ii Liste des tableaux ...

Document Draft Amended Decision Statement

  • Project Whabouchi Mining Project
  • Document Category: For Public Participation
  • Reference Number: 97
  • Document Date: 2023-06-06
  • Document: 151927E.pdf
  • Relevance: 290.74
  • Decision Statement Re-issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Nemaska Lithium Inc. c/o Denis Isabel Vice-President Sustainable Development 600 Boul. de Maisonneuve Ouest, Suite 750 Montréal, Québec H3A 3J2 for the Whabouchi Mine Project Description of the Designated Project Nemaska Lithium Inc. is proposing to construct, operate and decommission an open-pit surface and underground spodumene mine for the purpose of ...
1 alternate format found
French PDF
  • Relevance: 239.74
  • Déclaration de décision Réémise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Nemaska Lithium Inc. a/s de Denis Isabel Vice-président Développement durable 600 boul. de Maisonneuve Ouest, bureau 750 Montréal (Québec) H3A 3J2 pour le Projet minier Whabouchi Description du projet désigné Nemaska Lithium Inc. propose la construction, l’exploitation et la désaffectation d’une mine à ciel ouvert et souterraine de ...

Document Public Notice - Public comments invited on proposed changes to the project

  • Project Whabouchi Mining Project
  • Document Category: For Public Participation
  • Reference Number: 95
  • Document Date: 2023-06-06
  • Document: 151917E.html
  • Relevance: 290.74
  • Public Notice Whabouchi Mining Project Public Comments Invited on the Proposed Amendments to the Decision Statement What is happening? June 6, 2023 — The Impact Assessment Agency of Canada (the Agency) is holding a public comment period as part of the post-decision phase for the Whabouchi Mining Project, an open-pit and underground spodumene mine located 30 kilometres from Nemaska and 280 kilometres northwest of Chibougamau, Quebec. Why is the Agency holding a public comment ...
1 alternate format found
French HTML
  • Relevance: 239.74
  • Avis public Projet minier Whabouchi Période de consultation publique sur les modifications proposées à la déclaration de décision De quoi s'agit-il? Le 6 juin 2023 — L'Agence d'évaluation d'impact du Canada (l'Agence) tient une période de consultation dans le cadre de la phase suivant la décision pour le projet minier Whabouchi, une mine à ciel ouvert et souterraine de spodumène située à 30 kilomètres de Nemaska et à 280 kilomètres au nord-ouest de Chibougamau, au ...

Document Draft Analysis of Nemaska Lithium Inc.'s Proposed Changes to the Whabouchi Mining Project

  • Project Whabouchi Mining Project
  • Document Category: For Public Participation
  • Reference Number: 96
  • Document Date: 2023-06-06
  • Document: 151926E.pdf
  • Relevance: 290.74
  • Analysis of Nemaska Lithium’s Changes Made to the Whabouchi Mine Project DRAFT REPORT MAY 2023 IMPACT ASSESSMENT AGENCY OF CANADA DR AFT REP ORT i Table of Contents List of Figures ................................................................................................................................................... ii List of Tables ...
2 alternate formats found
English HTML
  • Relevance: 290.74
  • Analysis of Nemaska Lithium's Changes Made to the Whabouchi Mine Project Draft Report May 2023 On this page List of Figures List of Tables 1. Introduction 2. Analysis of the changes to determine whether they are subject to the Regulations 3. Analysis of the changes made and their potential adverse environmental effects 3.1 Change of proponent and change to the project description 3.2 Analysis of potential adverse environmental effects 3.2.1 ...
French PDF
  • Relevance: 239.74
  • Analyse des changements apportés par Nemaska Lithium au projet minier Whabouchi RAPPORT PROVISOIRE MAI 2023 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA RAPPORT PROVISOIRE i Table des matières Liste des figures ............................................................................................................................................... ii Liste des tableaux ...

Document Résumé d'inspection

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 112
  • Document Date: 2023-09-26
  • Document: 158947F.html
  • Relevance: 248.15
  • Sommaire d'inspection Nom du projet : Mine Whabouchi Promoteur : Nemaska Lilthium Date de l'inspection : 26 septembre 2023 Description du projet : Nemaska Lithium Inc. propose la construction, l'exploitation et la désaffectation d'une mine à ciel ouvert et souterraine de spodumène pour la production du lithium. Le projet désigné serait localisé à 30 kilomètres de Nemiscau et à 280 kilomètres au nord-nord-ouest de Chibougamau. Tel que proposé, le projet désigné comprend ...
1 alternate format found
French PDF
  • Relevance: 248.15
  • 160 Elgin St., 24th floor 160, rue Elgin, 24e étage Ottawa ON K1A 0H3 Ottawa ON K1A 0H3 www.canada.ca/iaac www.canada.ca/aeic SOMMAIRE D’INSPECTION Nom du projet: Mine Whabouchi Promoteur: Nemaska Lilthium Date de l’inspection: 26 septembre 2023 Description du projet: Nemaska Lithium Inc. propose la construction, l’exploitation et la désaffectation d’une mine à ciel ouvert et souterraine de ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Key Document Display Filters

Date modified: