Josephine Cone Mine Project

Registry Search Mobile

Registry Search

Skip to Filters

21 results

Document Notice of Termination

  • Project Josephine Cone Mine Project
  • Document Category: Additional Information
  • Reference Number: 10
  • Updated: 2019-02-13
  • Document: 126798E.html
  • Relevance: 247.35
  • Notice of Termination Ottawa – February 13, 2019 – The Canadian Environmental Assessment Agency (the Agency) has terminated the comprehensive study of the Josephine Cone Mine Project (the Project) pursuant to the former Canadian Environmental Assessment Act (the former Act). Ambershaw Metallics Inc. notified the Agency that they wish to terminate the federal environmental assessment for the Project and potential responsible authorities (Fisheries and Oceans Canada and Transport Canada) have ...
1 alternate format found
French HTML
  • Relevance: 196.35
  • Avis de cessation Ottawa – 13 février 2019 – L'Agence canadienne d'évaluation environnementale (l'Agence) a mis fin à l'étude approfondie du projet minier Josephine Cone (le projet) en vertu de la Loi canadienne sur l'évaluation environnementale (la Loi antérieure). Ambershaw Metallics Inc. a informé l'Agence qu'elle souhaite mettre fin à l'évaluation environnementale fédérale du projet, et les autorités responsables potentielles (Pêches et Océans Canada et Transports Canada) ont confirmé ...

Document Notice of Environmental Impact Statement Guidelines Renewal

  • Project Josephine Cone Mine Project
  • Document Category: Additional Information
  • Reference Number: 9
  • Updated: 2015-06-26
  • Document: 101924E.html
  • Relevance: 203.76
  • Notice of Environmental Impact Statement Guidelines Renewal Ottawa — June 26, 2015 — The Canadian Environmental Assessment Agency (the Agency) has renewed the Environmental Impact Statement Guidelines for the transitional comprehensive study of the Josephine Cone Mine Project proposed by Bending Lake Iron Group (the proponent), pursuant to the former Canadian Environmental Assessment Act and the Establishing Timelines for Comprehensive Studies Regulations. The Environmental Impact Statement ...
1 alternate format found
French HTML
  • Relevance: 152.76
  • Avis de renouvellement de la période de validité des lignes directrices relatives à l'étude d'impact environnemental Ottawa — 26 juin 2015 — L'Agence canadienne d'évaluation environnementale (l'Agence) renouvelle la période de validité des lignes directrices relatives à l'étude d'impact environnemental pour l'étude approfondie transitoire du projet minier Josephine Cone proposé par le Bending Lake Iron Group (le promoteur), en vertu de la Loi canadienne sur l'évaluation environnementale ...

Document Guidelines for the Preparation of an Environmental Impact Statement Pursuant to the Canadian Environmental Assessment Act for the Proposed Josephine Cone Mine Project

  • Project Josephine Cone Mine Project
  • Document Category: Additional Information
  • Reference Number: 6
  • Updated: 2012-06-28
  • Document: 57628E.pdf
  • Relevance: 101
  • Guidelines for the Preparation of an Environmental Impact Statement Pursuant to the Canadian Environmental Assessment Act for the Proposed Josephine Cone Mine Project CANADIAN ENVIRONMENTAL ASSESSMENT AGENCY June 2012 Environmental Impact Statement Guidelines Josephine Cone Mine Project i CEAA: 005002 This page is intentionally blank. Environmental Impact Statement Guidelines Josephine Cone Mine Project ii CEAA: 005002 TABLE OF CONTENTS PART 1 – BACKGROUND ...
1 alternate format found
French PDF
  • Relevance: 50
  • Lignes directrices pour l’établissement d’une étude d’impact environnemental conformément à la Loi canadienne sur l’évaluation environnementale pour le projet minier Josephine Cone AGENCE CANADIENNE D’ÉVALUATION ENVIRONNEMENTALE Juin 2012 Lignes directrices relatives à l’étude d’impact environnemental Projet minier Josephine Cone ACEE : 005002 1 (Page blanche) Lignes directrices relatives à l’étude d’impact environnemental Projet minier Josephine Cone ACEE : 005002 2 TABLE DES ...

Document Notice of Commencement of an Environmental Assessment

  • Project Josephine Cone Mine Project
  • Document Category: Additional Information
  • Reference Number: 7
  • Updated: 2012-06-27
  • Document: 93014E.html
  • Relevance: 101
  • Notice of Commencement of an Environmental Assessment Josephine Cone Mine Project Ignace (ON) May 15, 2012 (Updated June 27, 2012) -- On February 1, 2012, the Canadian Environmental Assessment Agency (the Agency) received a project description in accordance with the Establishing Timelines for Comprehensive Study Regulations. Based on information it has received, the Agency has determined that the project is described in the comprehensive study list and that an environmental assessment ...
1 alternate format found
French HTML
  • Relevance: 50
  • Avis de lancement d'une évaluation environnementale Projet minier Josephine Cone Ignace (ON) Le 15 mai 2012 (Mis à jour le 27 juin 2012) -- Le 1 février 2012, l’Agence canadienne d’évaluation environnementale (l’Agence) a reçu une description de projet conformément au Règlement établissant les échéanciers relatifs aux études approfondies. Sur la base des renseignements qu’elle a reçus, l’Agence a déterminé que le projet fait partie de la liste d’étude approfondie et qu’une évaluation ...

Document Public Comments Invited and Federal Funding Available

  • Project Josephine Cone Mine Project
  • Document Category: For Public Participation
  • Reference Number: 5
  • Updated: 2012-05-24
  • Document: 99662E.html
  • Relevance: 101
  • Public Notice Josephine Cone Mine Project – Public Comments Invited and Federal Funding Available The Canadian Environmental Assessment Agency (the Agency) is conducting a comprehensive study type of environmental assessment of the proposed Josephine Cone Mine Project located in Ontario. The public is invited to comment on the project and the conduct of the comprehensive study. The public is also invited to comment on the draft Environmental Impact Statement (EIS) Guidelines that identify ...
1 alternate format found
French HTML
  • Relevance: 50
  • Avis public Projet minier Josephine Cone – Période de consultation publique et disponibilité d'une aide financière fédérale L'Agence canadienne d'évaluation environnementale (l'Agence) réalise, au moyen d'une étude approfondie, l'évaluation environnementale du Projet minier Josephine Cone situé en Ontario. Le public est invité à formuler des commentaires sur le projet et la réalisation de l'étude approfondie. Le public est également invité à formuler des commentaires sur les lignes ...

Document News Release - Public Comments Invited and Federal Funding Available

  • Project Josephine Cone Mine Project
  • Document Category: News Releases
  • Reference Number: 2
  • Updated: 2012-05-15
  • Document: 93774E.html
  • Relevance: 101
  • News Release Josephine Cone Mine Project – Public Comments Invited and Federal Funding Available OTTAWA – May 15, 2012 – The Canadian Environmental Assessment Agency (the Agency) is conducting a comprehensive study type of environmental assessment of the proposed Josephine Cone Mine Project located in Ontario. The public is invited to comment on the project and the conduct of the comprehensive study. The public is also invited to comment on the draft Environmental Impact Statement (EIS) ...
1 alternate format found
French HTML
  • Relevance: 50
  • Communiqué Projet minier Josephine Cone – Période de consultation publique et disponibilité d’une aide financière fédérale OTTAWA, le 15 mai 2012 – L’Agence canadienne d’évaluation environnementale (l’Agence) réalise, au moyen d’une étude approfondie, l’évaluation environnementale du Projet minier Josephine Cone situé en Ontario. Le public est invité à formuler des commentaires sur le projet et la réalisation de l’étude approfondie. Le public est également invité à formuler des ...

Document Funding Review Committee's Report - Aboriginal Funding Envelope

  • Project Josephine Cone Mine Project
  • Document Category: Additional Information
  • Reference Number: 4
  • Updated: 2012-05-15
  • Document: 93885E.html
  • Relevance: 101
  • Participant Funding Program – Aboriginal Funding Envelope Funding Review Committee's Report Allocation of Federal Funds for the Environmental Assessment of the Proposed Josephine Cone Mine Project The Participant Funding Program (PFP) is established pursuant to subsection 58(1.1) of the Canadian Environmental Assessment Act (the Act), which states: For the purposes of this Act, the Minister shall establish a participant funding program to facilitate the participation of the public in ...
1 alternate format found
French HTML
  • Relevance: 50
  • Programme d’aide financière aux participants – Enveloppe de financement autochtone Rapport du Comité d’examen de l’aide financière Attribution de fonds fédéraux pour l’évaluation environnementale du projet minier Josephine Cone Le Programme d’aide financière aux participants (PAFP) est établi conformément au paragraphe 58(1.1) de la Loi canadienne sur l’évaluation environnementale (la Loi), qui stipule que : « Le ministre crée, pour l’application de la présente loi, un programme d’aide ...

Document Draft Guidelines for the Preparation of an Environmental Impact Statement

  • Project Josephine Cone Mine Project
  • Document Category: Additional Information
  • Reference Number: 3
  • Updated: 2012-05-15
  • Document: 56192E.pdf
  • Relevance: 101
  • Draft Guidelines for the Preparation of an Environmental Impact Statement Pursuant to the Canadian Environmental Assessment Act for the Proposed Josephine Cone Mine Project CANADIAN ENVIRONMENTAL ASSESSMENT AGENCY Apr 2012 Draft Environmental Impact Statement Guidelines Josephine Cone Mine Project i CEAA: 005002 This page is intentionally blank. Draft Environmental Impact Statement Guidelines Josephine Cone Mine Project ii CEAA: 005002 ...
1 alternate format found
French PDF
  • Relevance: 50
  • Lignes directrices provisoires pour l’établissement d’une étude d’impact environnemental conformément à la Loi canadienne sur l’évaluation environnementale pour le projet minier Josephine Cone AGENCE CANADIENNE D’ÉVALUATION ENVIRONNEMENTALE Avril 2012 Lignes directrices relatives à l’étude d’impact environnemental Projet minier Josephine Cone ACEE : 005002 1 (Page blanche) Lignes directrices relatives à l’étude d’impact ...

Document Public Comments Invited and Federal Funding Available

  • Project Josephine Cone Mine Project
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2012-05-15
  • Document: 99661E.html
  • Relevance: 101
  • Public Notice Josephine Cone Mine Project – Public Comments Invited and Federal Funding Available The Canadian Environmental Assessment Agency (the Agency) is conducting a comprehensive study type of environmental assessment of the proposed Josephine Cone Mine Project located in Ontario. The public is invited to comment on the project and the conduct of the comprehensive study. The public is also invited to comment on the draft Environmental Impact Statement (EIS) Guidelines that identify ...
1 alternate format found
French HTML
  • Relevance: 50
  • Avis public Projet minier Josephine Cone – Période de consultation publique et disponibilité d'une aide financière fédérale L'Agence canadienne d'évaluation environnementale (l'Agence) réalise, au moyen d'une étude approfondie, l'évaluation environnementale du Projet minier Josephine Cone situé en Ontario. Le public est invité à formuler des commentaires sur le projet et la réalisation de l'étude approfondie. Le public est également invité à formuler des commentaires sur les lignes ...

Document Notice of Receipt of an Acceptable Project Description

  • Project Josephine Cone Mine Project
  • Document Category: Additional Information
  • Reference Number: 8
  • Updated: 2012-02-01
  • Document: 88472E.html
  • Relevance: 101
  • Josephine Cone Mine Project Ignace (ON) Status: On February 1, 2012, the Canadian Environmental Assessment Agency received an acceptable project description and is now determining if a comprehensive study should commence. About the Project: The proposed project consists of the construction, operation and decommissioning of an iron ore mine located approximately 49 kilometres southwest of Ignace, Ontario. The project will process approximately 56 000 tonnes of iron ore per day from one ...
1 alternate format found
French HTML
  • Relevance: 50
  • Projet minier Josephine Cone Ignace(ON) Statut : Le 1 février 2012, l'Agence canadienne d'évaluation environnementale a reçu une description de projet acceptable et détermine actuellement si elle doit commencer une étude approfondie. À propos du projet : Le projet comprend la construction, l'exploitation et la désaffectation d'une mine de minerai de fer située à environ 49 kilomètres au sudouest d'Ignace, en Ontario. Le projet permettra de traiter près de 56 000 tonnes de minerai de fer ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: