Trigon Pacific LPG Project

Registry Search Mobile

Registry Search

Skip to Filters

7 results

Document Notice of decision with reasons: no impact assessment required

  • Project Trigon Pacific LPG Project
  • Document Category: Additional Information
  • Reference Number: 21
  • Document Date: 2026-11-03
  • Document: 168334E.html
  • Relevance: 400.4
  • Notice of decision with reasons: no impact assessment required Ottawa – November 4, 2026 — The Impact Assessment Agency of Canada (IAAC) has engaged the public and consulted Indigenous nations on the Trigon Pacific LPG Project (the project) located in British Columbia and on November 3, 2026, decided that an impact assessment is not required. In accordance with subsection 16(2) of the Impact Assessment Act (IAA), IAAC considered each of the following factors: the Initial Project ...
1 alternate format found
French HTML
  • Relevance: 349.4
  • Avis de décision avec motifs : aucune évaluation d'impact n'est requise Ottawa – le 4 novembre 2026 – L'Agence d'évaluation d'impact du Canada (AEIC) a mobilisé le public et consulté les nations autochtones au sujet du projet de GPL de Trigon Pacific (le projet), situé en Colombie-Britannique. L'AEIC a décidé, le 3 novembre 2026, qu'aucune évaluation d'impact n'est requise. Conformément au paragraphe 16(2) de la Loi sur l'évaluation d'impact (LEI), l'AEIC a pris en compte les éléments ...

Document Summary of issues

  • Project Trigon Pacific LPG Project
  • Document Category: Additional Information
  • Reference Number: 18
  • Document Date: 2026-08-03
  • Document: 167513E.pdf
  • Relevance: 390.46
  • 1 Summary of Issues Trigon Pacific LPG Project The Summary of Issues outlines the key issues that the Impact Assessment Agency of Canada (IAAC) considers relevant for the federal impact assessment process for the Trigon Pacific LPG Project (the project). Trigon Pacific Terminals Ltd.’s (the proponent) response to the Summary of Issues will support IAAC’s decision on whether further assessment is required under section 16 of the Impact Assessment Act. If further assessment is ...
1 alternate format found
French PDF
  • Relevance: 339.46
  • 1 Sommaire des questions Projet de GPL de Trigon Pacific Le sommaire des questions décrit les enjeux clés que l’Agence d’évaluation d’impact du Canada (AEIC) juge pertinents pour le processus fédéral d’évaluation d’impact du projet de GPL de Trigon Pacific (le projet). La réponse de Trigon Pacific Terminals Ltd. (le promoteur) au sommaire des questions permettra d’éclairer la décision de l’AIEC quant à la nécessité d’une évaluation d’impact en vertu de l’article 16 de la Loi sur ...

Document Summary of the initial project description of a designated project

  • Project Trigon Pacific LPG Project
  • Document Category: For Public Participation
  • Reference Number: 2
  • Document Date: 2026-06-15
  • Document: 166892E.pdf
  • Relevance: 385.27
  • Trigon Pacific LPG Project Plain Language Summary June 12, 2026 Trigon Pacific Terminals 2 Table of Contents 1 GENERAL INFORMATION ...................................................................................................................................... 4 1.1 PROPONENT INFORMATION ...
1 alternate format found
French PDF
  • Relevance: 334.27
  • Projet de GPL Trigon Pacific Résumé en langage clair 12 juin, 2026 Trigon Pacific Terminals 2 Table of Contents 1 INFORMATIONS GÉNÉRALES ................................................................................................................................. 4 1.1 INFORMATION SUR LE PROMOTEUR ...