Port of Botwood Wharf Rehabilitation Project

Registry Search Mobile

Registry Search

Skip to Filters

9 results

Document Notice of early decision with reasons

  • Project Port of Botwood Wharf Rehabilitation Project
  • Document Category: Additional Information
  • Reference Number: 25
  • Document Date: 2026-07-23
  • Document: 167312E.html
  • Relevance: 399.6
  • Notice of early decision with reasons Ottawa — July 23, 2026 — The Impact Assessment Agency of Canada (IAAC) has conducted an assessment of the Port of Botwood Wharf Rehabilitation Project and on July 20, 2026, decided at an early stage that no further assessment is required for the project proposed by Exploits Valley Port Corporation (the proponent), located in Newfoundland and Labrador. In accordance with subsection 16(2) of the Impact Assessment Act (IAA), IAAC considered each of the ...
1 alternate format found
French HTML
  • Relevance: 348.6
  • Avis de décision avec motifs tôt dans le processus Ottawa — 23 juillet 2026 — L'Agence d'évaluation d'impact du Canada (AEIC) a réalisé une évaluation du projet de modernisation du quai du port de Botwood et le 20 juillet 2026 a décidé, tôt dans le processus, qu'aucune évaluation supplémentaire n'est requise pour le projet proposé par Exploits Valley Port Corporation (le promoteur) situé à Terre-Neuve-et-Labrador. Conformément au paragraphe 16(2) de la Loi sur l'évaluation d'impact ...

Document Summary of issues

  • Project Port of Botwood Wharf Rehabilitation Project
  • Document Category: Additional Information
  • Reference Number: 20
  • Document Date: 2026-06-17
  • Document: 166857E.pdf
  • Relevance: 395.68
  • 1 Summary of Issues Port of Botwood Wharf Rehabilitation Project The Summary of Issues outlines the key issues that the Impact Assessment Agency of Canada (IAAC) considers relevant for the federal impact assessment process for the Port of Botwood Wharf Rehabilitation Project (the project). The proponent’s response to the Summary of Issues will support decision-making by IAAC on whether further assessment is required under section 16 of the Impact Assessment Act. If an assessment is ...
1 alternate format found
French PDF
  • Relevance: 344.68
  • 1 Sommaire des questions Projet de modernisation du quai du port de Botwood Le Sommaire des questions décrit les principales questions que l’Agence d’évaluation d’impact du Canada (AEIC) juge pertinentes pour le processus fédéral d’évaluation d’impact du projet de modernisation du quai du port de Botwood (le projet). La réponse du promoteur au Sommaire des questions appuiera la prise de décisions de l’AEIC quant à la nécessité d’une évaluation approfondie au titre de l’article 16 de ...

Document Summary of the initial project description of a designated project

  • Project Port of Botwood Wharf Rehabilitation Project
  • Document Category: For Public Participation
  • Reference Number: 3
  • Document Date: 2026-05-13
  • Document: 166585E.pdf
  • Relevance: 391.92
  • THE IMPACT ASSESSMENT AGENCY OF CANADA Part F: Initial Project Description Summary Submitted by: Exploits Valley Port Corporation (EVPC) May 2026 Table of Contents i The Impact Assessment Agency of Canada Part F: Initial Project Description Summary Submitted by: Exploits Valley Port Corporation (EVPC) Table of Contents Acronyms 1.0 Introduction 1 1.1 Project Location and Setting ...
1 alternate format found
French PDF
  • Relevance: 340.92
  • AGENCE D’ÉVALUATION D’IMPACT DU CANADA Partie F: Description Initiale Du Projet Sommaire Soumis par : Exploits Valley Port Corporation (EVPC) Mai 2026 Table des matières i Agence d’évaluation d’impact du Canada Partie F: Description Initiale Du Projet Sommaire Soumis par : Exploits Valley Port Corporation (EVPC) Mai 2026 Table des matières Acronymes 1.0 Introduction 1 1.1 Emplacement et cadre du projet ...