Document Notice of Impact Assessment Decision with Reasons

  • Project Sussex Region Flood Diversion Project
  • Document Category: Additional Information
  • Reference Number: 35
  • Document Date: 2025-05-06
  • Document: 161172E.html
  • Relevance: 354.54
  • Notice of Impact Assessment Decision with Reasons Ottawa — May 6, 2025 — The Impact Assessment Agency of Canada (IAAC) has decided that an impact assessment is not required for the Sussex Region Flood Diversion Project (the project) proposed by the Town of Sussex (the proponent), located in New Brunswick. In accordance with subsection 16(2) of the Impact Assessment Act (IAA), IAAC considered each of the following factors: the Initial Project Description and the Response to the ...
1 alternate format found
French HTML
  • Relevance: 303.54
  • Avis de décision relative à une évaluation d'impact avec motifs Ottawa — le 6 mai 2025 — L'Agence d'évaluation d'impact du Canada (AEIC) a décidé qu'une évaluation d'impact n'est pas requise pour le projet de dérivation des crues dans la région de Sussex (projet) proposé par la ville de Sussex (promoteur), situé au Nouveau-Brunswick. Conformément au paragraphe 16(2) de la Loi sur l'évaluation d'impact (LEI), l'AEIC a pris en considération chacun des éléments suivants ...

Document Summary of Issues

  • Project Sussex Region Flood Diversion Project
  • Document Category: Additional Information
  • Reference Number: 34
  • Document Date: 2025-02-20
  • Document: 160928E.pdf
  • Relevance: 347.42
  • 1 Summary of Issues Sussex Region Flood Diversion Project Table 1 – Issues to Inform Impact Assessment Agency of Canada’s Decision on Whether an Impact Assessment is Required The following table provides a high-level summary of key issues within areas of federal jurisdiction that were submitted to the Impact Assessment Agency of Canada (IAAC) about the Sussex Region Flood Diversion Project (the Project) during the public comment period on the Summary of the Initial Project ...
1 alternate format found
French PDF
  • Relevance: 296.42
  • 1 Sommaire des questions Projet de dérivation des crues dans la région de Sussex Tableau I – Questions pour éclairer la décision de l’Agence d’évaluation d’impact du Canada sur la nécessité d’une évaluation d’impact Le tableau suivant présente un résumé de haut niveau des principales questions dans les domaines de compétence fédérale, qui ont été soumises à l’Agence d’évaluation d’impact du Canada (AEIC) au sujet du projet de dérivation des crues dans la région de Sussex (le ...