Document Notice of Impact Assessment Decision with Reasons

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: Additional Information
  • Reference Number: 32
  • Document Date: 2025-01-16
  • Document: 160493E.html
  • Relevance: 343.84
  • Notice of Impact Assessment Decision with Reasons Ottawa — January 16, 2025 — The Impact Assessment Agency of Canada (IAAC) decided that an impact assessment is not required for the Marguerite Lake Compressed Air Energy Storage Project (the project) proposed by Federation Group Inc. (the proponent), located in Alberta. In accordance with subsection 16(2) of the Impact Assessment Act (the IAA), IAAC considered each of the following factors: the Initial Project Description and ...
1 alternate format found
French HTML
  • Relevance: 292.84
  • Avis de décision relative à une évaluation d'impact avec motifs Ottawa — le 16 janvier 2025 — L'Agence d'évaluation d'impact du Canada (l'AEIC) a décidé qu'une évaluation d'impact n'est pas requise pour le projet de stockage d'énergie à air comprimé de Marguerite Lake (le projet) proposé par Federation Group Inc. (le promoteur), situé en Alberta. Conformément au paragraphe 16(2) de la Loi sur l'évaluation d'impact (la LEI), l'AEIC a pris en considération chacun des éléments ...

Document Notice of Time Limit Resumption

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: Additional Information
  • Reference Number: 28
  • Document Date: 2025-01-10
  • Document: 160416E.html
  • Relevance: 343.28
  • Notice of Time Limit Resumption Ottawa — January 10, 2025 — On January 6, 2025, Federation Group Inc. (the proponent) provided its response to the Summary of Issues for the Marguerite Lake Compressed Air Energy Storage Project to the Impact Assessment Agency of Canada (IAAC). On January 10, 2025, IAAC determined that this document contains sufficient information to inform its section 16 decision regarding whether an impact assessment is required. The proponent thereby completed the activity ...
1 alternate format found
French HTML
  • Relevance: 292.28
  • Avis de reprise du délai Ottawa — 10 janvier 2025 — Le 6 janvier 2025, Federation Group Inc. (le promoteur) a fourni sa réponse au sommaire des questions (en anglais seulement) pour le projet de stockage d'énergie à air comprimé de Marguerite Lake à l'Agence d'évaluation d'impact du Canada (l'AEIC). Le 10 janvier 2025, l'AEIC a déterminé que ce document contenait suffisamment de renseignements pour éclairer sa décision en vertu de l'article 16 quant à savoir si une évaluation d'impact est ...

Document Plain English Summary of the Summary of Issues Response

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: Additional Information
  • Reference Number: 30
  • Document Date: 2025-01-10
  • Document: 160418E.pdf
  • Relevance: 343.28
  • 21R-04370 Plain English Summary of the Summary of Issues Response Marguerite Lake Compressed Air Energy Storage Project Prepared for: Federation Group Inc. Prepared by: Vertex Professional Services Ltd. Date: January 2025 Federation Group Inc. Marguerite Lake CAES Project (NW-35-064-06 W4M) Summary of Issues January 2025 ii Plain English Summary Marguerite Lake Compressed Air Energy Storage Project ...
1 alternate format found
French PDF
  • Relevance: 292.28
  • 21R-04370 Réponse au sommaire des questions résumé en langage clair Projet de stockage d'énergie par air comprimé de Marguerite Lake NW-35-064-06 W4M Préparé pour: Federation Group Inc. Préparé par: Vertex Professional Services Ltd. Date: Janvier 2025 Federation Group Inc. Projet de stockage d'énergie par air comprimé de Marguerite Lake (NW-35-064-06 W4M) Réponse au sommaire ...

Document Notice of time limit suspension with reasons

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: Additional Information
  • Reference Number: 26
  • Document Date: 2024-11-15
  • Document: 159610E.html
  • Relevance: 338.15
  • Notice of Time Limit Suspension with Reasons   Ottawa — November 15, 2024 — On November 1, 2024, the Impact Assessment Agency of Canada (IAAC) suspended the 180-day time limit for the Planning Phase under the Impact Assessment Act for the Marguerite Lake Compressed Air Energy Storage Project proposed by Federation Group Inc. (the proponent). IAAC has taken this action in consideration of a written request from the proponent that the time limit be suspended in order that it may have ...
1 alternate format found
French HTML
  • Relevance: 287.15
  • Avis de suspension du délai avec motifs   Ottawa — 15 novembre 2024 — Le 1 novembre 2024, l'Agence d'évaluation d'impact du Canada (l'AEIC) a suspendu le délai de 180 jours pour l'étape préparatoire en vertu de la Loi sur l'évaluation d'impact pour le projet de stockage d'énergie à air comprimé de Marguerite Lake, proposé par Federation Group Inc. (le promoteur). L'AEIC a pris cette mesure à la suite d'une demande écrite du promoteur (disponible seulement en anglais) de suspendre le ...

Document Summary of issues

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: Additional Information
  • Reference Number: 23
  • Document Date: 2024-02-07
  • Document: 155500E.pdf
  • Relevance: 313.75
  • February 7, 2024 — MARGUERITE LAKE COMPRESSED AIR ENERGY STORAGE PROJECT — SUMMARY OF ISSUES – PAGE 1 OF 4 SUMMARY OF ISSUES – Marguerite Lake Compressed Air Energy Storage Project This document provides a high-level summary of issues that were submitted to the Impact Assessment Agency of Canada (the Agency) about the Marguerite Lake Compressed Air Energy Storage Project (the Project) during the public comment period on the Summary of the Initial Project Description (IPD), submitted ...
1 alternate format found
French PDF
  • Relevance: 262.75
  • 7 février 2024 – PROJET DE STOCKAGE D’ÉNERGIE À AIR COMPRIMÉ DE MARGUERITE LAKE – RÉSUMÉ DES ENJEUX – PAGE 1 DE 5 UNCLASSIFIED - NON CLASSIFIÉ SOMMAIRE DES QUESTIONS – Projet de stockage d’énergie à air comprimé de Marguerite Lake Le présent document fournit un résumé général des questions qui ont été soumises à l’Agence d’évaluation d’impact du Canada (l’Agence) au sujet du Projet de stockage d'énergie à air comprimé de Marguerite Lake (le projet) pendant la période de ...

Document Summary of the initial project description of a designated project

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: For Public Participation
  • Reference Number: 2
  • Document Date: 2023-11-23
  • Document: 154764E.pdf
  • Relevance: 307.59
  • 21R-04370 Initial Project Description – Plain Language Summary Marguerite Lake Compressed Air Energy Storage NW-35-064-06 W4M Prepared for: Federation Group Inc. Prepared by: Vertex Professional Services Ltd. Date: November 23, 2023 Federation Group Inc. Marguerite Lake Compressed Air Energy Storage NW-35-064-06 W4M Initial Project Description – Plain Language Summary November ...
1 alternate format found
French PDF
  • Relevance: 256.59
  • 21R-04370 Description initiale du Projet - Résumé en langage clair Lac Marguerite Stockage d'énergie par air comprimé NW-35-064-06 W4M Préparé pour: Federation Group Inc. Préparé par: Vertex Professional Services Ltd. Date: 23 novembre 2023 Federation Group Inc. Lac Marguerite SEAC NW-35-064-06 W4M Description initiale du Projet - Résumé en langage clair Novembre 2023 Polyvalence. Compétence. ii 23 novembre, 2023 ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Key Document Display Filters

Date modified: