Moraine Power Generation Project

Registry Search Mobile

Registry Search

Skip to Filters

9 results

Document Notice of Impact Assessment Decision with Reasons

  • Project Moraine Power Generation Project
  • Document Category: Additional Information
  • Reference Number: 45
  • Document Date: 2023-10-04
  • Document: 153142E.html
  • Relevance: 303.57
  • Notice of Impact Assessment Decision with Reasons Ottawa — October 4, 2023 — The Impact Assessment Agency of Canada (the Agency) decided that an impact assessment is not required for the Moraine Power Generation Project (the project) located in Alberta, proposed by Moraine Initiatives Ltd. (the proponent). In accordance with subsection 16(2) of the Impact Assessment Act (the IAA), the Agency has taken into account each of the following factors: the Detailed Project Description, ...
1 alternate format found
French HTML
  • Relevance: 252.57
  • Avis de décision relative à une évaluation d'impact avec motifs Ottawa — 4 octobre 2023 — L'Agence d'évaluation d'impact du Canada (l'Agence) a décidé qu'une évaluation d'impact n'est pas nécessaire pour le projet de centrale électrique Moraine (le project) situé en Alberta, proposé par Moraine Initiatives Ltd. (le promoteur). Conformément au paragraphe 16 (2) de la Loi sur l'évaluation d'impact (LEI), l'Agence a pris en compte les éléments suivants : la description détaillée du ...

Document Summary of the Detailed Project Description of a Designated Project

  • Project Moraine Power Generation Project
  • Document Category: Additional Information
  • Reference Number: 43
  • Document Date: 2023-09-13
  • Document: 153067E.pdf
  • Relevance: 301.93
  • Prepared for: Moraine Initiatives Limited Project Description Summary Moraine Power Generation Project Prepared by: Stantec Consulting Ltd. 110220760 Revision 01 September 13, 2023 PROJECT DESCRIPTION SUMMARY Moraine Power Generation Project i Acronyms / Abbreviations AC Alberta Ministry of Culture (formerly Alberta Culture and Status of Women [ACSW]) AEPA Alberta Ministry of Environment and Protected Areas (formerly Alberta Environment and Parks [AEP]) ...
1 alternate format found
French PDF
  • Relevance: 250.93
  • Préparé pour : Moraine Initiatives Limited Description sommaire du projet Projet de production d’électricité de Moraine Préparé par : Stantec Consulting Ltd. 110220760 Révision 01 Le 13 septembre 2023 DESCRIPTION SOMMAIRE DU PROJET Projet de production d’électricité de Moraine i Acronymes/Abréviations AC Alberta Ministry of Culture (anciennement Alberta Culture and Status of Women [ACSW]) AEPA Alberta Ministry of Environment and Protected Areas ...

Document Notice of Time Limit Suspension with Reasons

  • Project Moraine Power Generation Project
  • Document Category: Additional Information
  • Reference Number: 39
  • Document Date: 2023-08-10
  • Document: 152706E.html
  • Relevance: 299.3
  • Notice of Time Limit Suspension with Reasons Ottawa — August 10, 2023 — On August 4, 2023, the Impact Assessment Agency of Canada (the Agency) suspended the 180-day time limit for the Planning Phase under the Impact Assessment Act for the Moraine Power Generation Project (the project) proposed by Moraine Initiatives Ltd. (the proponent). The Agency has taken this action in consideration of a written request from the proponent that the time limit be suspended in order that it may have ...
1 alternate format found
French HTML
  • Relevance: 248.3
  • Avis de suspension du délai avec motifs Ottawa — 10 août 2023 — Le 4 août 2023, l'Agence d'évaluation d'impact du Canada (l'Agence) a suspendu le délai de 180 jours pour l'étape préparatoire en vertu de la Loi sur l'évaluation d'impact pour le projet de centrale électrique Moraine (le projet), proposé par Moraine Initiatives Ltd. (le promoteur). L'Agence a pris cette mesure à la suite d'une demande écrite du promoteur (anglais seulement) de suspendre le délai afin d'avoir suffisamment ...

Document Summary of Issues

  • Project Moraine Power Generation Project
  • Document Category: Additional Information
  • Reference Number: 38
  • Document Date: 2023-07-17
  • Document: 152477E.pdf
  • Relevance: 297.46
  • Moraine Power Generation Project – Summary of Issues – PAGE 1 of 5 Summary of Issues - Moraine Power Generation Project This document provides a high-level summary of issues submitted to the Impact Assessment Agency of Canada (the Agency) about the Moraine Power Generation Project (the Project) during the comment period on the Summary of the Initial Project Description (IPD), submitted by Moraine Initiatives Ltd. (the Proponent). The issues highlight information that support decision ...
1 alternate format found
French PDF
  • Relevance: 246.46
  • Sommaire des questions – projet de centrale électrique Moraine – page 1 de 5 Sommaire des questions – projet de centrale électrique Moraine Le présent document fournit un sommaire de haut niveau des questions présentées à l’Agence d’évaluation d’impact du Canada (l’Agence) à propos du projet de centrale électrique Moraine (le projet) pendant la période de consultation sur le sommaire de la description initiale du projet (DIP), présenté par Moraine Initiatives Ltd. (le promoteur). Les ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Key Document Display Filters

Document Category Display Filters

Date modified: