Hydrogen Ready Power Plant Project

Registry Search Mobile

Registry Search

Skip to Filters

11 results

Document Notice of Transition to the Amended Impact Assessment Act

  • Project Hydrogen Ready Power Plant Project
  • Document Category: Additional Information
  • Reference Number: 49
  • Document Date: 2024-10-10
  • Document: 159293E.html
  • Relevance: 335.3
  • Notice of Transition to the Amended Impact Assessment Act   Ottawa — October 10, 2024 — On June 20, 2024, the Budget Implementation Act, 2024, No. 1 received Royal Assent and brought into force amendments to the Impact Assessment Act (the IAA). Transitional provision 305 of the Budget Implementation Act, 2024, No. 1 states that, in order to bring a designated project under the IAA, the Minister of Environment and Climate Change or the Impact Assessment Agency of Canada (IAAC) must take ...
1 alternate format found
French HTML
  • Relevance: 284.3
  • Avis de transition à la Loi sur l'évaluation d'impact modifiée   Ottawa — 10 octobre 2024 — Le 20 juin 2024, la Loi no 1 d'exécution du budget de 2024 a reçu la sanction royale entraînant ainsi l'entrée en vigueur des modifications apportées à la Loi sur l'évaluation d'impact (la LEI). La disposition transitoire 305 de la Loi no 1 d'exécution du budget de 2024 stipule que, pour qu'un projet soit désigné en vertu de la LEI, le ministre de l'Environnement et du Changement climatique ou ...

Document Notice of Impact Assessment Decision with Reasons

  • Project Hydrogen Ready Power Plant Project
  • Document Category: Additional Information
  • Reference Number: 51
  • Document Date: 2024-10-10
  • Document: 159319E.html
  • Relevance: 335.3
  • Notice of Impact Assessment Decision with Reasons   Ottawa — October 10, 2024 — The Impact Assessment Agency of Canada (IAAC) decided that an impact assessment is not required for the Hydrogen Ready Power Plant Project (the project) proposed by Eastern Power Inc. (the proponent), located in Ontario. In accordance with subsection 16(2) of the Impact Assessment Act (the IAA), IAAC has considered each of the following factors: the Initial Project Description, and Response to ...
1 alternate format found
French HTML
  • Relevance: 284.3
  • Avis de décision relative à une évaluation d'impact avec motifs   Ottawa — 10 octobre 2024 — L'Agence d'évaluation d'impact du Canada (l'AEIC) a décidé qu'une évaluation d'impact n'est pas nécessaire pour le projet de centrale électrique prête pour l'hydrogène (le projet) proposé par Eastern Power Inc. (le promoteur), situé en Ontario. Conformément au paragraphe 16(2) de la Loi sur l'évaluation d'impact (la LEI), l'AEIC a pris en considération chacun des éléments ...

Document Summary of Issues

  • Project Hydrogen Ready Power Plant Project
  • Document Category: Additional Information
  • Reference Number: 33
  • Document Date: 2022-07-25
  • Document: 144559E.pdf
  • Relevance: 272.54
  • JULY 25, 2022 – HYDROGEN READY POWER PLANT PROJECT – SUMMARY OF ISSUES – PAGE 1 OF 3 Hydrogen Ready Power Plant Project – Summary of Issues This document provides a high-level summary of the issues submitted to the Impact Assessment Agency of Canada (the Agency) on the Hydrogen Ready Power Plant Project (the Project) during the comment period on the Initial Project Description submitted by the Eastern Power Inc. (the Proponent). The issues highlight the information needed to support ...
1 alternate format found
French PDF
  • Relevance: 221.54
  • 25 JUILLET 2022 – PROJET DE CENTRALE ÉLECTRIQUE PRÊTE POUR L'HYDROGÈNE – RÉSUMÉ DES ENJEUX – PAGE 1 DE 3 Projet de centrale électrique prête pour l’hydrogène – Résumé des enjeux Ce document présente un résumé de haut niveau des enjeux présentées à l’Agence d’évaluation d’impact du Canada (l’Agence) sur le projet de centrale électrique prête pour l’hydrogène (le projet) pendant la période de consultation sur la description initiale du projet soumise par Eastern Power Inc. (le ...

Document Summary of an Initial Project Description of a Designated Project

  • Project Hydrogen Ready Power Plant Project
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2022-05-24
  • Document: 144095E.pdf
  • Relevance: 268.53
  • Hydrogen Ready Power Project IAAC Initial Project Description Summary Eastern Power Inc. Hydrogen Ready Power Plant Project Summary of Initial Project Description for a Designated Project under the Impact Assessment Act May 24, 2022 Prepared by: Bruce E. Holbein Ph.D. Reviewed by: Francis Itliong P.Eng. Approved by: Raman Raghavan P.Eng. Hydrogen Ready Power Project IAAC Initial Project Description Summary 1 GENERAL INFORMATION ...
1 alternate format found
French PDF
  • Relevance: 217.53
  • Eastern Power Inc. Projet de centrale électrique prête pour l'hydrogène Résumé de la Description Initiale du Projet pour un projet désigné en vertu de la Loi sur l'évaluation d'impact 24 mai 2022 Préparé par: Bruce E. Holbein Ph.D. Révisé par: Francis Itliong P.Eng. Approuvé par: Raman Raghavan P.Eng. Projet d'électricité prête pour l'hydrogène Résumé de la description initiale du projet IAAC 1 INFORMATIONS GÉNÉRALES CONTACTS ET ...