Ksi Lisims LNG - Natural Gas Liquefaction and Marine Terminal Project

Registry Search Mobile

Registry Search

Skip to Filters

23 results

Document Minister's Decision Statement

  • Project Ksi Lisims LNG - Natural Gas Liquefaction and Marine Terminal Project
  • Document Category: Additional Information
  • Reference Number: 42
  • Document Date: 2025-09-15
  • Document: 163208E.pdf
  • Relevance: 365.66
  • 1 Decision Statement Issued under Section 65 of the Impact Assessment Act to Ksi Lisims LNG Tolling GP ULC, on behalf of Ksi Lisims LNG Tolling Limited Partnership c/o Sandra Webster, Vice President Suite 1600, 925 West Georgia Street Vancouver, British Columbia V6C 3L2 for the Ksi Lisims LNG - Natural Gas Liquefaction and Marine Terminal Project The Nisg̱a'a Nation, Rockies LNG LP, and Western LNG LLC are proposing the construction, operation and ...
3 alternate formats found
English HTML
  • Relevance: 365.66
  • Decision Statement Issued under Section 65 of the Impact Assessment Act to Ksi Lisims LNG Tolling GP ULC, on behalf of Ksi Lisims LNG Tolling Limited Partnership c/o Sandra Webster, Vice President Suite 1600, 925 West Georgia Street Vancouver, British Columbia V6C 3L2 for the Ksi Lisims LNG - Natural Gas Liquefaction and Marine Terminal Project The Nisg̱a'a Nation, Rockies LNG LP, and Western LNG LLC are proposing the construction, operation and decommissioning of a ...
French PDF
  • Relevance: 314.66
  • 1 Déclaration de décision Émise aux termes de l’article 65 de la Loi sur l’évaluation d’impact à Ksi Lisims LNG Tolling GP ULC, au nom du Ksi Lisims LNG Tolling Limited Partnership a/s de Sandra Webster, vice-présidente 925, West Georgia Street, bureau 1600 Vancouver, Colombie-Britannique V6C 3L2 pour le Projet de liquéfaction de gaz naturel et de terminal maritime – Ksi Lisims LNG La Nation Nisg̱a’a, Rockies LNG LP et Western LNG LLC proposent ...
French HTML
  • Relevance: 314.66
  • Déclaration de décision Émise aux termes de l'article 65 de la Loi sur l'évaluation d'impact à Ksi Lisims LNG Tolling GP ULC, au nom du Ksi Lisims LNG Tolling Limited Partnership a/s de Sandra Webster, vice-présidente 925, West Georgia Street, bureau 1600 Vancouver, Colombie-Britannique V6C 3L2 pour le Projet de liquéfaction de gaz naturel et de terminal maritime – Ksi Lisims LNG La Nation Nisg̱a'a, Rockies LNG LP et Western LNG LLC proposent la construction, ...

Document Notice of Substitution Approval under the Impact Assessment Act

  • Project Ksi Lisims LNG - Natural Gas Liquefaction and Marine Terminal Project
  • Document Category: Additional Information
  • Reference Number: 38
  • Document Date: 2024-08-14
  • Document: 158452E.html
  • Relevance: 328.55
  • August 14, 2024: The Impact Assessment Agency of Canada is reposting this Notice of Substitution Approval under the Impact Assessment Act in accordance with the Notice of Transition. Notice of Substitution Approval under the Impact Assessment Act Ottawa — August 14, 2024 — On April 6, 2023, the Impact Assessment Agency of Canada (IAAC) determined that an impact assessment pursuant to the Impact Assessment Act (the IAA) is required for the Ksi Lisims LNG – Natural Gas Liquefaction ...
1 alternate format found
French HTML
  • Relevance: 277.55
  • Le 14 août 2024 : L'Agence d'évaluation d'impact du Canada a réaffiché la décision concernant la substitution conformément à l'avis de transition. Avis d'approbation de la substitution en vertu de la Loi sur l'évaluation d'impact Ottawa — Le 14 août 2024 — Le 6 avril 2023, l'Agence d'évaluation d'impact du Canada (l'AEIC) a déterminé qu'une évaluation d'impact conformément à la Loi sur l'évaluation d'impact (la LEI) est requise pour le projet de liquéfaction de gaz naturel et de ...

Document Notice of Substitution Decision under the Impact Assessment Act

  • Project Ksi Lisims LNG - Natural Gas Liquefaction and Marine Terminal Project
  • Document Category: Additional Information
  • Reference Number: 36
  • Document Date: 2023-04-06
  • Document: 147281E.html
  • Relevance: 288.84
  • Notice of Substitution Approval under the Impact Assessment Act The Impact Assessment Agency of Canada (the Agency) has determined that an impact assessment pursuant to the Impact Assessment Act (IAA) is required for the Ksi Lisims LNG – Natural Gas Liquefaction and Marine Terminal Project (the Project), located at Wil Milit on Pearse Island in British Columbia (B.C.). For this Project, the Honourable Steven Guilbeault, Minister of Environment and Climate Change, has approved the ...
1 alternate format found
French HTML
  • Relevance: 237.84
  • Avis d'approbation de la substitution en vertu de la Loi sur l'évaluation d'impact L'Agence d'évaluation d'impact du Canada (l'Agence) a déterminé qu'une évaluation d'impact conformément à la Loi sur l'évaluation d'impact (LEI) est requise pour le projet de liquéfaction de gaz naturel et de terminal maritime Ksi Lisims LNG (le projet), situés à Wil Milit sur l'île Pearse, en Colombie-Britannique. Pour ce projet, l'honorable Steven Guilbeault, ministre de l'Environnement et du Changement ...

Document Notice of Time Limit Resumption

  • Project Ksi Lisims LNG - Natural Gas Liquefaction and Marine Terminal Project
  • Document Category: Additional Information
  • Reference Number: 29
  • Document Date: 2023-03-27
  • Document: 147089E.html
  • Relevance: 288.11
  • Notice of Time Limit Resumption Ottawa — March 27, 2023 — On March 17, 2023, the Nisga'a Nation, Rockies LNG LP, and Western LNG LLC (the proponents) provided their response to the Joint Summary of Issues and Engagement and Detailed Project Description for the Ksi Lisims LNG - Natural Gas Liquefaction and Marine Terminal Project to the Impact Assessment Agency of Canada (the Agency). On March 27, 2023, the Agency accepted these documents as it determined that they contained the information ...
1 alternate format found
French HTML
  • Relevance: 237.11
  • Avis de reprise du délai Ottawa — 27 mars 2023 — Le 17 mars 2023, la Nation Nisga'a, Rockies LNG LP et Western LNG LLC (les promoteurs) ont fourni leur réponse au résumé conjoint des enjeux et de la mobilisation (en anglais seulement) et une description détaillée du projet (en anglais seulement) pour le projet de liquéfaction de gaz naturel et de terminal maritime Ksi Lisims LNG à l'Agence d'évaluation d'impact du Canada (l'Agence). Le 27 mars 2023, l'Agence a accepté ces documents, car ...

Document Notice of Impact Assessment Decision with Reasons

  • Project Ksi Lisims LNG - Natural Gas Liquefaction and Marine Terminal Project
  • Document Category: Additional Information
  • Reference Number: 34
  • Document Date: 2023-03-27
  • Document: 147095E.html
  • Relevance: 288.11
  • Notice of Impact Assessment Decision with Reasons Ottawa — March 27, 2023 — The Impact Assessment Agency of Canada (the Agency) has decided that an impact assessment is required for the Ksi Lisims LNG - Natural Gas Liquefaction and Marine Terminal Project (the Project), located at Wil Milit on Pearse Island, British Columbia. The Project is proposed by the Nisga'a Nation, Rockies LNG LP, and Western LNG LLC (the proponents). In accordance with subsection 16(2) of the Impact Assessment ...
1 alternate format found
French HTML
  • Relevance: 237.11
  • Avis de décision d'évaluation d'impact avec motifs Ottawa — le 27 mars 2023 — L'Agence d'évaluation d'impact du Canada (l'Agence) a décidé qu'une évaluation d'impact est requise pour le projet de liquéfaction de gaz naturel et de terminal maritime Ksi Lisims LNG (le projet), situé à Wil Milit sur l'île Pearse, en Colombie-Britannique (C.-B.). Le projet est proposé par la Nation Nisga'a, Rockies LNG LP et Western LNG LLC (le promoteur). Conformément au paragraphe 16(2) de la Loi sur ...

Document Notice of Time Limit Suspension with Reasons

  • Project Ksi Lisims LNG - Natural Gas Liquefaction and Marine Terminal Project
  • Document Category: Additional Information
  • Reference Number: 26
  • Document Date: 2021-10-28
  • Document: 141709E.html
  • Relevance: 254.85
  • Notice of Time Limit Suspension with Reasons Ottawa — October 28, 2021 — On October 25, 2021, the Impact Assessment Agency of Canada (the Agency) suspended the 180-day time limit for the Planning Phase under the Impact Assessment Act for the Nisga'a Nation, Rockies LNG LP, and Western LNG LLC's (the proponents) Ksi Lisims LNG - Natural Gas Liquefaction and Marine Terminal Project. The Agency has taken this action further to a written request from the proponents that the time limit be ...
1 alternate format found
French HTML
  • Relevance: 203.85
  • Avis de suspension du délai avec motifs Ottawa — le 28 octobre 2021 — Le 25 octobre 2021, l'Agence d'évaluation d'impact du Canada (l'Agence) a suspendu le délai de 180 jours prévu pour l'étape préparatoire, en vertu de la Loi sur l'évaluation d'impact, pour le projet de liquéfaction de gaz naturel et de terminal maritime Ksi Lisims LNG de la Nation Nisga'a, Rockies LNG LP et Western LNG LLC (les promoteurs). L'Agence a pris cette mesure à la suite d'une demande écrite des promoteurs ...

Document Joint Summary of Issues and Engagement

  • Project Ksi Lisims LNG - Natural Gas Liquefaction and Marine Terminal Project
  • Document Category: Additional Information
  • Reference Number: 25
  • Document Date: 2021-10-14
  • Document: 141589E.pdf
  • Relevance: 254.05
  • Pacific and Yukon Region Région du Pacifique et du Yukon PO Box 9426 Stn Prov Govt 757 West Hastings Street 757 rue Hastings Ouest Victoria BC V8W 9V1 Suite 201A bureau 210 A Vancouver BC V6C 3M2 Vancouver (C-B) V6C 3M2 October 14, 2021 Sent by Email Only Mike Lambert Director, Environmental and Regulatory Affairs Rockies LNG Limited Partnership mlambert@rockieslng.com Agency File No: 005806 EAO File No: 30020-04/OGI-21 Dear Mike Lambert: Subject: Joint Summary of ...
1 alternate format found
French PDF
  • Relevance: 203.05
  • Région du Pacifique et du Yukon Pacific and Yukon Region C.P. 9426 Stn Prov Govt 757 rue Hastings Ouest 757 West Hastings Street Victoria (C.-B.) V8W 9V1 Suite 201A bureau 201A Vancouver (C.-B.) V6C 3M2 Vancouver BC V6C 3M2 14 octobre 2021 Envoi par courriel seulement Mike Lambert Directeur, Affaires environnementales et réglementaires Rockies LNG Limited Partnership mlambert@rockieslng.com Numéro de dossier de l’Agence : 005806 Numéro de dossier du BEE : ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Key Document Display Filters

Date modified: