Tent Mountain Mine Redevelopment Project

Registry Search Mobile

Registry Search

Skip to Filters

13 results

Document Notice of Termination

  • Project Tent Mountain Mine Redevelopment Project
  • Document Category: Additional Information
  • Reference Number: 330
  • Document Date: 2023-05-11
  • Document: 147603E.html
  • Relevance: 285.9
  • Notice of Termination Ottawa — May 12, 2023 — The Impact Assessment Agency of Canada terminated the impact assessment for the Tent Mountain Mine Redevelopment Project (the project) pursuant to section 73 of the Impact Assessment Act. On April 25, 2023, Montem Resources Alberta Operations Ltd. notified the Agency that they would no longer be carrying out the project.
1 alternate format found
French HTML
  • Relevance: 234.9
  • Avis de résiliation Ottawa — 12 mai 2023 — L'Agence d'évaluation d'impact du Canada a mis fin à l'évaluation d'impact du projet de réaménagement de la mine de Tent Mountain (le projet) en vertu de l'article 73 de la Loi sur l'évaluation d'impact. Le 25 avril 2023, Montem Resources Alberta Operations Ltd. a avisé l'Agence qu'elle ne réalisera pas le projet.

Document Notice of Time Limit Suspension with Reasons

  • Project Tent Mountain Mine Redevelopment Project
  • Document Category: Additional Information
  • Reference Number: 318
  • Document Date: 2022-01-17
  • Document: 142624E.html
  • Relevance: 255.14
  • Notice of Time Limit Suspension with Reasons Ottawa — January 18, 2022 — On January 13, 2022, the Impact Assessment Agency of Canada (the Agency) suspended the 180-day time limit within which it must provide Montem Resources Alberta Operations Ltd. (the Proponent) with a notice of the commencement of the impact assessment of the Tent Mountain Mine Redevelopment Project, if the Agency decides that an impact assessment of the project is required. The Agency has taken this action further ...
1 alternate format found
French HTML
  • Relevance: 204.14
  • Avis de suspension du délai avec motifs Ottawa — 18 janvier 2022 — Le 13 janvier 2022, l'Agence d'évaluation d'impact du Canada (l'Agence) a suspendu le délai de 180 jours au cours duquel elle doit fournir à Montem Resources Alberta Operations Ltd. (le promoteur) un avis de début de l'évaluation d'impact du projet de réaménagement de la mine de Tent Mountain, si l'Agence décide qu'une évaluation d'impact du projet est requise. Cet avis fait suite à la présentation par le promoteur d'une ...

Document Summary of Issues

  • Project Tent Mountain Mine Redevelopment Project
  • Document Category: Additional Information
  • Reference Number: 311
  • Document Date: 2021-12-28
  • Document: 142485E.pdf
  • Relevance: 254.01
  • December 2021 – Tent Mountain Mine Redevelopment Project – Summary of Issues – PAGE 1 of 9 Tent Mountain Mine Redevelopment Project - Summary of Issues This document provides a high-level summary of the issues submitted to the Impact Assessment Agency of Canada (the Agency) on the Tent Mountain Mine Redevelopment Project (the Project) during the comment period on the Initial Project Description submitted by Montem Resources Alberta Operations Ltd. (the Proponent). The issues submitted ...
1 alternate format found
French PDF
  • Relevance: 203.01
  • Décembre 2021 – Projet de réaménagement de la mine de Tent Mountain – Sommaire des questions – PAGE 1 de 11 Projet de réaménagement de la mine de Tent Mountain – Sommaire des questions Le présent document fournit un résumé global des enjeux présentés à l’Agence d’évaluation d’impact du Canada (l’Agence) à propos du projet de réaménagement de la mine de Tent Mountain (le projet) pendant la période de consultation publique sur la description initiale du projet présentée par Montem ...

Document Summary of an Initial Project Description of a Designated Project

  • Project Tent Mountain Mine Redevelopment Project
  • Document Category: For Public Participation
  • Reference Number: 47
  • Document Date: 2021-11-24
  • Document: 142155E.pdf
  • Relevance: 252.11
  • Montem Resources Alberta Operations Limited Tent Mountain Mine Redevelopment Project Initial Project Description Plain Language Summary November 2021 Submitted to: Impact Assessment Agency of Canada Submitted by: Montem Resources Alberta Operations Limited This page left intentionally blank Table of Contents PLAIN LANGUAGE SUMMARY ...
1 alternate format found
French PDF
  • Relevance: 201.11
  • Montem Resources Alberta Operations Limitée Projet de réaménagement de la Mine de Tent Mountain Description initiale de projet Résumé en langage clair Novembre 2021 Présenté à : Agence d’évaluation d’impact du Canada Présenté par : Montem Resources Alberta Operations limitée Cette page est volontairement vierge. Table des matières RÉSUMÉ EN LANGAGE CLAIR ...

Document Minister's Order

  • Project Tent Mountain Mine Redevelopment Project
  • Document Category: Additional Information
  • Reference Number: 40
  • Document Date: 2021-06-27
  • Document: 139460E.html
  • Relevance: 244.13
  • Order Designating Physical Activities I, the undersigned Minister of the Environment, pursuant to subsection 9(1) of the Impact Assessment Act, do hereby designate the physical activity known as the Tent Mountain Mine Redevelopment Project proposed by Montem Resources Alberta Operations Ltd., which is the restart and expansion of coal mining operations at the Tent Mountain Mine, an open-pit coal mine located 16 kilometres west of Coleman, Alberta. Signed at Ottawa on ...
1 alternate format found
French HTML
  • Relevance: 193.13
  • Arrêté désignant des activités concrètes Je soussigné, ministre de l'Environnement, en vertu du paragraphe 9(1) de la Loi sur l'évaluation d'impact, désigne, par la présente, l'activité concrète connue sous le nom de projet de réaménagement de la mine de Tent Mountain proposé par Montem Resources Alberta Operations Ltd., qui comprend le redémarrage et l'extension des opérations minières de la mine de Tent Mountain, une mine de charbon à ciel ouvert située à 16 kilomètres à l'ouest de ...

Document Minister's Response

  • Project Tent Mountain Mine Redevelopment Project
  • Document Category: Additional Information
  • Reference Number: 41
  • Document Date: 2021-06-27
  • Document: 139461E.html
  • Relevance: 244.13
  • Minister's Response Project Montem Resources Alberta Operation Ltd. is proposing the Tent Mountain Mine Redevelopment Project, the restart and expansion of open-pit coal mining for the extraction and export of metallurgical (steelmaking) coal. The Project would extract 4,925 tonnes per day of raw coal over a 14-year mine life, with subsequent reclamation and monitoring. The Project would be located approximately 16 kilometres west of the town of Coleman, Alberta and physical activities ...
1 alternate format found
French HTML
  • Relevance: 193.13
  • Réponse du ministre Projet Montem Resources Alberta Operation Ltd. propose le projet de réaménagement de la mine de Tent Mountain, soit le redémarrage et l'extension d'une mine de charbon à ciel ouvert aux fins d'extraction et d'exportation de charbon métallurgique (sidérurgie). Le projet permettrait d'extraire 4 925 tonnes de charbon brut par jour sur la durée de vie de 14 ans de la mine, avec une remise en état et une surveillance ultérieures. Le projet serait situé à environ 16 ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Key Document Display Filters

Date modified: