Document Draft impact assessment report

  • Project Marten Falls Community Access Road Project
  • Document Category: For Public Participation
  • Reference Number: 259
  • Document Date: 2026-06-03
  • Document: 166705E.pdf
  • Relevance: 394.7
  • UNCLASSIFIED - NON CLASSIFIÉ Marten Falls Community Access Road DRAFT IMPACT ASSESSMENT REPORT May 2026 IMPACT ASSESSMENT AGENCY OF CANADA DRAFT IMPACT ASSESSMENT REPORT – MARTEN FALLS COMMUNITY ACCESS ROAD i UNCLASSIFIED - NON CLASSIFIÉ © His Majesty the King in Right of Canada, as represented by the Minister of the Environment, Climate Change and Nature, 2026. This ...
1 alternate format found
French PDF
  • Relevance: 343.7
  • UNCLASSIFIED - NON CLASSIFIÉ Route d’accès à la communauté de Marten Falls VERSION PROVISOIRE DU RAPPORT D’ÉVALUATION D’IMPACT Mai 2026 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA VERSION PROVISOIRE DU RAPPORT D’ÉVALUATION D ’ IMPACT – ROUTE D’ACCÈS À LA COMMUNAUTÉ DE MARTEN FALLS i UNCLASSIFIED - NON CLASSIFIÉ © Sa Majesté le Roi du chef du Canada représenté par la ...

Document Draft potential conditions

  • Project Marten Falls Community Access Road Project
  • Document Category: For Public Participation
  • Reference Number: 258
  • Document Date: 2026-06-03
  • Document: 166703E.pdf
  • Relevance: 394.7
  • Page 1 of 19 Potential conditions established under section 64 of the Impact Assessment Act The Impact Assessment Agency of Canada is contemplating the following potential conditions in relation to the Marten Falls Community Access Road Project (the Designated Project) located in Ontario for recommendation to the Minister of Environment (the Minister) for inclusion in a Decision Statement issued under the Impact Assessment Act. If the Designated Project is allowed to proceed, ...
1 alternate format found
French PDF
  • Relevance: 343.7
  • Page 1 de 20 Conditions potentielles en vertu de l’article 64 de la Loi sur l’évaluation d’impact L’Agence d’évaluation d’impact du Canada envisage les conditions potentielles suivantes en ce qui concerne le projet de route d'accès à la collectivité de Marten Falls (le projet désigné) situé en Ontario, afin de les recommander au ministre de l’Environnement (le ministre) pour qu’elles soient incluses dans une déclaration de décision émise en vertu de la Loi sur l’évaluation ...

Document Summary of the Impact Statement

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 247
  • Document Date: 2026-02-20
  • Document: 165197E.html
  • Relevance: 383.75
  • Summary of the Impact Statement Executive Summary (PDF – 2.1 MB) Message from the Chief (PDF – 260 KB) Aboriginal Treaty Rights and Interests (PDF – 3.4 MB) Archaeology and Cultural Heritage (PDF – 2.5 MB) Climate Change Adaptation (PDF – 1.1 MB) Community Well Being (PDF – 1.7 MB) Fish and Fish Habitat (PDF – 3.9 MB) Groundwater and Surface Water (PDF – 1.8 MB) Land and Resource Use and Visual Environment (PDF – 3.7 MB) Noise and Vibration (PDF – ...
1 alternate format found
French HTML
  • Relevance: 332.75
  • Résumé de l'étude d'impact Resumé (PDF – 2.0 MB) Message du Chef (PDF – 328 KB) Droits et intérêts ancestraux et/ou issus de traités (PDF – 3.8 MB) Archéologie et patrimoire culturel (PDF – 2.5 MB) Adaptation aux changements climatiques (PDF – 1.1 MB) Bien-être communautaire (PDF – 1.7 MB) Poissons et habitat des poissons (PDF – 3.9 MB) Eaux souterraines et eaux de surface (PDF – 1.8 MB) Environnement visuel et utilisation du territoire et des ...

Document Impact Statement

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 246
  • Document Date: 2026-02-20
  • Document: 166655E.html
  • Relevance: 383.75
  • Impact Statement Impact Statement (PDF – 199 MB) Appendices Appendix A Metrics Tables (PDF – 1.5 MB) Appendix AA Summary and Recommendations Tables (PDF – 2.4 MB) Appendix AB Preliminary Biodiversity Offset Plan.pdf (PDF – 5.2 MB) Appendix B Route Selection Method.pdf (PDF – 9.5 MB) Appendix C Concordance Tables (PDF – 1.2 MB) Appendix D Qualifications of Individuals (PDF – 660 KB) Appendix E Project Inclusions List (PDF – 560 KB) Appendix F ...
1 alternate format found
French HTML
  • Relevance: 332.75
  • Étude d'impact (anglais seulement) Impact Statement (PDF – 199 MB) Annexes Appendix A Metrics Tables (PDF – 1.5 MB) Appendix AA Summary and Recommendations Tables (PDF – 2.4 MB) Appendix AB Preliminary Biodiversity Offset Plan.pdf (PDF – 5.2 MB) Appendix B Route Selection Method.pdf (PDF – 9.5 MB) Appendix C Concordance Tables (PDF – 1.2 MB) Appendix D Qualifications of Individuals (PDF – 660 KB) Appendix E Project Inclusions List (PDF – ...

Document Notice of Time Limit Extension

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 230
  • Document Date: 2024-10-08
  • Document: 159296E.html
  • Relevance: 335.13
  • October 8, 2024 — The Impact Assessment Agency of Canada is re-posting this Notice of Time Limit Extension with Reasons in accordance with the Notice of Transition. Notice of Time Limit Extension Ottawa — October 8, 2024 — On January 13, 2023, the Impact Assessment Agency of Canada (IAAC) granted an extension to the three-year time limit for Marten Falls First Nation (the proponent) to provide the required information or studies set out in the Notice of Commencement of the impact ...
1 alternate format found
French HTML
  • Relevance: 284.13
  • 8 octobre 2024 — L'AEIC d'évaluation d'impact réaffiche cet avis de prolongation de délai avec motifs conformément à l'avis de transition. Avis de prolongation de délai Ottawa — 8 octobre 2024 — Le 13 janvier 2023, l'Agence d'évaluation d'impact du Canada (l'AEIC) a accordé une prolongation du délai de trois ans dont disposait la Première Nation de Marten Falls (le promoteur) pour fournir les études ou renseignements mentionnés dans l'avis de lancement de l'évaluation d'impact du ...

Document Indigenous Engagement and Partnership Plan

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 100
  • Document Date: 2021-04-30
  • Document: 140988E.html
  • Relevance: 246.04
  • Indigenous Engagement and Partnership Plan April 30, 2021 (Latest version) – Indigenous Engagement and Partnership Plan for the Marten Falls Community Access Road Project (PDF – 862 KB) February 24, 2020 (Previous version) - Indigenous Engagement and Partnership Plan for the Marten Falls Community Access Road Project (PDF – 275 KB)
1 alternate format found
French HTML
  • Relevance: 195.04
  • Plan de mobilisation et de partenariat avec les Autochtones 30 avril 2021 (dernière version) – Plan de mobilisation et de partenariat avec les Autochtones pour l'évaluation d'impact du project de route d'accès à la collectivité de Marten Falls. (PDF – 970 KB) 24 février 2020 (version précédente) – Plan de mobilisation et de partenariat avec les Autochtones pour l'évaluation d'impact du project de route d'accès à la collectivité de Marten Falls (PDF – 239 KB)

Document Cooperation Plan

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 98
  • Document Date: 2020-02-24
  • Document: 133931E.pdf
  • Relevance: 226.41
  • Cooperation Plan – Marten Falls Community Access Road Project Page 1 of 3 IMPACT ASSESSMENT AGENCY OF CANADA – ONTARIO MINISTRY OF THE ENVIRONMENT, CONSERVATION AND PARKS COOPERATION PLAN FOR THE MARTEN FALLS COMMUNITY ACCESS ROAD PROJECT IMPACT ASSESSMENT February 24, 2020 1. Introduction On November 29, 2019, the Impact Assessment Agency of Canada (the Agency) determined that an impact assessment is required for the Marten Falls Community Access Road Project, pursuant ...
1 alternate format found
French PDF
  • Relevance: 175.41
  • Plan de collaboration – Projet de route d’accès à la collectivité de Marten Falls Page 1 de 3 AGENCE D’ÉVALUATION D’IMPACT DU CANADA– MINISTÈRE DE L’ENVIRONNEMENT, DE LA PROTECTION DE LA NATURE ET DES PARCS DE L’ONTARIO PLAN DE COLLABORATION DE L’ÉVALUATION D’IMPACT POUR LE PROJET DE ROUTE D’ACCÈS À LA COLLECTIVITÉ DE MARTEN FALLS 24 février 2020 1. Introduction Le 29 novembre 2019, l’Agence d’évaluation d’impact du Canada (l’Agence) a déterminé qu’une évaluation ...

Document Permitting Plan

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 97
  • Document Date: 2020-02-24
  • Document: 133930E.pdf
  • Relevance: 226.41
  • Permitting Plan – Marten Falls Community Access Road Project Page 1 of 14 PERMITTING PLAN FOR THE MARTEN FALLS COMMUNITY ACCESS ROAD PROJECT IMPACT ASSESSMENT February 24, 2020 1. Introduction On November 29, 2019, the Impact Assessment Agency of Canada (the Agency) determined that an impact assessment is required for the Marten Falls Community Access Road Project pursuant to subsection 16(1) of the Impact Assessment Act. This Permitting Plan was developed by the Agency to ...
1 alternate format found
French PDF
  • Relevance: 175.41
  • Plan de deliverance de permis – Projet de route d’accès à la collectivité de Marten Falls Page 1 de 16 PLAN DE DÉLIVRANCE DE PERMIS POUR L’ÉVALUATION D’IMPACT DU PROJET DE ROUTE D’ACCÈS À LA COLLECTIVITÉ DE MARTEN FALLS 24 février 2020 1. Introduction Le 29 novembre 2019, l’Agence d’évaluation d’impact du Canada (l’Agence) a déterminé qu’une évaluation d’impact est requise pour le projet de route d’accès à la collectivité de Marten Falls conformément au paragraphe 16(1) de la ...

Document Tailored Impact Statement Guidelines

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 101
  • Document Date: 2020-02-24
  • Document: 133937E.pdf
  • Relevance: 226.41
  • Marten Falls Community Access Road Project TAILORED IMPACT STATEMENT GUIDELINES February 24, 2020 IMPACT ASSESSMENT AGENCY OF CANADA TAILOR ED IM PACT ST AT EMENT GUIDELINES i Contents Marten Falls Community Access Road Project ........................................... 1 List of Abbreviations and Acronyms ..................................................................... 1 1. Introduction ...
1 alternate format found
French PDF
  • Relevance: 175.41
  • Projet de route d’accès à la collectivité de Marten Falls LIGNES DIRECTRICES INDIVIDUALISÉES RELATIVES À L’ÉTUDE D’IMPACT 24 février 2020 AGENCE D’ÉVALUATION D’IMPACT DU CANADA LIGNES DIRECTRICES INDIVIDUALISÉES RELATIVES À L ’ÉTUDE D ’ IMPACT i Contenu Projet de route d’accès à la collectivité de Marten Falls ........................................ 1 Abréviations et formes abrégées ...

Document Indigenous Engagement and Partnership Plan

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 100
  • Document Date: 2020-02-24
  • Document: 133936E.pdf
  • Relevance: 226.41
  • Indigenous Engagement and Partnership Plan – Marten Falls Community Access Road Project Page 1 of 12 INDIGENOUS ENGAGEMENT AND PARTNERSHIP PLAN FOR THE MARTEN FALLS COMMUNITY ACCESS ROAD PROJECT IMPACT ASSESSMENT February 24, 2020 1. Introduction On November 29, 2019, the Impact Assessment Agency of Canada (the Agency) determined that an impact assessment is required for the Marten Falls Community Access Road Project. This Indigenous Engagement and Partnership Plan outlines ...
1 alternate format found
French PDF
  • Relevance: 175.41
  • Plan de mobilisation et de partenariat avec les Autochtones – Projet de route d’accès à la collectivité de Marten Falls Page 1 de 18 PLAN DE MOBILISATION ET DE PARTENARIAT AVEC LES AUTOCHTONES POUR L’ÉVALUATION D’IMPACT DU PROJET DE ROUTE D’ACCÈS À LA COLLECTIVITÉ DE MARTEN FALLS 24 février 2020 1. Introduction Le 29 novembre 2019, l’Agence d’évaluation d’impact du Canada (l’Agence) a déterminé qu’une évaluation d’impact est requise pour le projet de route d’accès à la collectivité ...

Document Notice of Commencement

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 102
  • Document Date: 2020-02-24
  • Document: 133939E.html
  • Relevance: 226.41
  • Notice of Commencement of an Impact Assessment Ottawa — On February 24, 2020 - The Impact Assessment Agency of Canada (the Agency) has commenced an impact assessment pursuant to the Impact Assessment Act (IAA) for the Marten Falls Community Access Road Project. On November 29, 2019, the Agency decided that a federal impact assessment was required. The Agency has issued the following documents to the proponent to guide the development of the Impact Statement and the conduct of the impact ...
1 alternate format found
French HTML
  • Relevance: 175.41
  • Avis de lancement d'une évaluation d'impact Ottawa — Le 24 février 2020 - L'Agence canadienne d'évaluation d'impact (l'Agence) a entamé une évaluation d'impact en vertu de la Loi sur l'évaluation d'impact (LEI) pour le Projet de route d'accès à la collectivité de Marten Falls. L'Agence a décidé le novembre 29 2019, qu'une évaluation d'impact fédérale était requise. L'Agence a fourni les documents suivants au promoteur pour guider la préparation de l'étude d'impact et la réalisation de ...

Document Public Participation Plan

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 99
  • Document Date: 2020-02-24
  • Document: 133934E.pdf
  • Relevance: 226.41
  • Public Participation Plan – Marten Falls Community Access Road Project Page 1 of 8 PUBLIC PARTICIPATION PLAN FOR THE MARTEN FALLS COMMUNITY ACCESS ROAD PROJECT IMPACT ASSESSMENT February 24, 2020 1. Introduction On November 29, 2019, the Impact Assessment Agency of Canada (the Agency) determined that an impact assessment is required for the Marten Falls Community Access Road Project. This Public Participation Plan was developed by the Agency to set out proposed ...
1 alternate format found
French PDF
  • Relevance: 175.41
  • Plan de participation du public – Projet de route d’accès à la collectivité de Marten Falls Page 1 de 10 PLAN DE PARTICIPATION DU PUBLIC POUR L’ÉVALUATION D’IMPACT DU PROJET DE ROUTE D’ACCÈS À LA COLLECTIVITÉ DE MARTEN FALLS 24 février 2020 1. Introduction Le 29 novembre 2019, l’Agence d’évaluation d’impact du Canada (l’Agence) a déterminé qu’une évaluation d’impact était nécessaire pour le projet de route d’accès à la collectivité de Marten Falls. L’Agence a élaboré ce ...

Document Public Participation Comment Card

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 21
  • Document Date: 2019-12-19
  • Document: 133359E.pdf
  • Relevance: 223.86
  • Participant Comment Card Opportunity for public participation The Impact Assessment Agency of Canada (the Agency) is a federal body accountable to the Minister of Environment and Climate Change that delivers high quality impact assessments which contribute to informed decision-making on major projects in support of sustainable development. The Agency is conducting an impact assessment process for this project and would like to hear comments from the public ...
1 alternate format found
French PDF
  • Relevance: 172.86
  • Carte de commentaires pour participants Occasion de participation du public L’Agence d’évaluation d’impact du Canada (l’Agence) est une institution fédérale qui relève du ministre de l’Environnement et Changement climatique et qui founit des évaluations d’impact de grande qualité qui contribuent à une prise de décision éclairées sur les grands projets en faveur du développement durable. L’Agence effectue un processus d’évaluation d’impact pour ce projet et invite le public à ...

Document Draft Tailored Impact Statement Guidelines

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 16
  • Document Date: 2019-12-19
  • Document: 133326E.pdf
  • Relevance: 223.86
  • Impact Assessment Agency of Canada DRAFT TAILORED IMPACT STATEMENT GUIDELINES: MARTEN FALLS COMMUNITY ACCESS ROAD PROJECT DECEMBER 2019 Draft Tailored Impact Statement Guidelines – Marten Falls Community Access Road Project Table of Contents DRAFT TAILORED IMPACT STATEMENT GUIDELINES FOR DESIGNATED PROJECTS SUBJECT TO THE IMPACT ASSESSMENT ACT ............................................ ERROR! BOOKMARK ...
3 alternate formats found
English HTML
  • Relevance: 223.86
  • Draft Tailored Impact Statement Guidelines: Marten Falls Community Access Road Project December 2019 Table of Contents Abbreviations and Short Forms 1. Introduction 1.1 Factors to be considered in the Impact Assessment 2. Overview 2.1 The proponent 2.2 Project overview 2.3 Project location 2.4 Regulatory framework and the role of government 2.5 Qualifications of individuals preparing the Impact Statement 3. Project ...
French HTML
  • Relevance: 172.86
  • Lignes directrices provisoires adaptées : Projet de route d'accès à la collectivité de Marten Falls Décembre 2019 Table des matières Abréviations et formes abrégées 1. Introduction 1.1 Éléments à examiner dans l'évaluation d'impact 2. Aperçu 2.1 Promoteur 2.2 Aperçu du projet 2.3 Emplacement du projet 2.4 Cadre de réglementation et rôle du gouvernement 2.5 Qualifications des personnes qui préparent l'étude d'impact 3. ...
French PDF
  • Relevance: 172.86
  • AGENCE D’ÉVALUATION D’IMPACT DU CANADA LIGNES DIRECTRICES PROVISOIRES ADAPTÉES POUR DES PROJETS DÉSIGNÉS ASSUJETTIS À LA LOI SUR L’ÉVALUATION D’IMPACT: PROJET DE ROUTE D’ACCÈS À LA COLLECTIVITÉ DE MARTEN FALLS DÉCEMBRE 2019 i Lignes directrices provisoires adaptées relatives à l’étude d’impact – Projet de route d’accès à la collectivité de Marten Falls Table des matières LIGNES DIRECTRICES ...

Document Draft Public Participation Plan

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 17
  • Document Date: 2019-12-19
  • Document: 133327E.pdf
  • Relevance: 223.86
  • Draft Public Participation Plan – Marten Falls Community Access Road Project Page 1 of 8 DRAFT PUBLIC PARTICIPATION PLAN FOR THE MARTEN FALLS COMMUNITY ACCESS ROAD PROJECT IMPACT ASSESSMENT December 19, 2019 1. Introduction On November 29, 2019, the Impact Assessment Agency of Canada (the Agency) determined that an impact assessment is required for the Marten Falls Community Access Road Project. This draft Public Participation Plan was developed by the Agency to set out ...
1 alternate format found
French PDF
  • Relevance: 172.86
  • Version provisoire du plan de participation du public – Projet de route d’accès à la collectivité de Marten Falls Page 1 de 10 VERSION PROVISOIRE DU PLAN DE PARTICIPATION DU PUBLIC POUR L’ÉVALUATION D’IMPACT DU PROJET DE ROUTE D’ACCÈS À LA COLLECTIVITÉ DE MARTEN FALLS 19 décembre 2019 1. Introduction Le 29 novembre 2019, l’Agence d’évaluation d’impact du Canada (l’Agence) a déterminé qu’une évaluation d’impact était nécessaire pour le projet de route d’accès à la ...

Document Notice of Impact Assessment Decision with Reasons

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 13
  • Document Date: 2019-11-29
  • Document: 133156E.html
  • Relevance: 223.13
  • Notice of Impact Assessment Decision with Reasons Ottawa — November 29, 2019 — The Impact Assessment Agency of Canada (the Agency) has decided that an impact assessment is required for the Marten Falls Community Access Road Project (the Project) located in northern Ontario. In accordance with subsection 16(2) of the Impact Assessment Act (IAA), the Agency has taken into account each of the following factors: the proponent's Detailed Project Description and its response to the ...
1 alternate format found
French HTML
  • Relevance: 172.13
  • Motifs et décision concernant l'évaluation d'impact Ottawa — le 29 novembre 2019 — L'Agence d'évaluation d'impact du Canada (l'Agence) a décidé qu'une évaluation d'impact est requise pour le projet de route d'accès à la collectivité de Marten Falls (le projet), situé dans le Nord de l'Ontario. Conformément aux éléments prescrits au paragraphe 16(2) de la Loi sur l'évaluation d'impact (LEI), l'Agence a pris en compte les éléments suivants : la description de projet détaillée du ...

Document Summary of the Detailed Project Description of a Designated Project

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 11
  • Document Date: 2019-11-09
  • Document: 133149E.pdf
  • Relevance: 222.41
  • Marten Falls First Nation Detailed Project Description Summary Marten Falls All-Season Community Access Road Prepared by: Prepared for: AECOM Canada Ltd. 105 Commerce Valley Drive West, 7th Floor Markham, ON L3T 7W3 Canada T: 905.886.7022 F: 905.886.9494 www.aecom.com Marten Falls First Nation Submitted to: Impact Assessment Agency of Canada Date: November, 2019 Project #: 60593122 AECOM Marten Falls First Nation Detailed Project Description ...
1 alternate format found
French PDF
  • Relevance: 171.41
  • Communauté autochtone de Marten Falls Description de projet détaillée – Résumé Route d’accès toutes saisons à la communauté autochtone de Marten Falls Préparé par : Préparé pour: AECOM Canada Ltd. 105 Commerce Valley Drive West, 7th Floor Markham, ON L3T 7W3 Canada T: 905.886.7022 F: 905.886.9494 www.aecom.com Communauté autochtone de Marten Falls Soumis à: Agence d'évaluation d'impact du Canada Date : Novembre 2019 Projet #: 60593122 AECOM ...

Document Summary of Issues

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 9
  • Document Date: 2019-10-11
  • Document: 133229E.html
  • Relevance: 221.38
  • Summary of Issues Cover letter (PDF – 383 KB) Summary of Issues (PDF – 610 KB) Impact Assessment Agency of Canada Ontario Region 600-55 York Street Toronto ON M5J 1R7 Agence d'évaluation d'impact du Canada Région de I'Ontario 600-55 rue York Toronto ON M5J 1R7 Sent by Email October 11, 2019 Chief Bruce Achneepineskum Marten Falls First Nation General Delivery Ogoki Post ON P0T 3A0 info@martenfallsaccessroad.ca Agency File No: ...
1 alternate format found
French HTML
  • Relevance: 170.38
  • Sommaire des questions Cover letter (PDF – 383 Ko) - Anglais seulement Sommaire des questions (PDF – 622 Ko) RÉSUMÉ DES ENJEUX – Route d'accès à la collectivité de Marten Falls Le présent document est un résumé général des engagements pris par l'Agence canadienne d'évaluation d'impact (l'Agence) concernant la route d'accès à la collectivité de Marten Falls (le projet) pendant la période de commentaires sur la description initiale de projet présentée par le promoteur, la ...

Document Summary of an Initial Project Description of a Designated Project

  • Project Marten Falls Community Access Road Project
  • Document Category: For Public Participation
  • Reference Number: 3
  • Document Date: 2019-08-06
  • Document: 132151E.pdf
  • Relevance: 219.13
  • Marten Falls First Nation Project Description - Summary Marten Falls All-Season Community Access Road Prepared by: Prepared for: AECOM Canada Ltd. 105 Commerce Valley Drive West, 7th Floor Markham, ON L3T 7W3 Canada T: 905.886.7022 F: 905.886.9494 www.aecom.com Marten Falls First Nation Date: August, 2019 Project #: 60593122 Submitted to: Canadian Environmental Assessment Agency Distribution List # Hard Copies PDF ...
1 alternate format found
French PDF
  • Relevance: 168.13
  • Communauté autochtone de Marten Falls Description de projet - Résumé Route d’accès toutes saisons à la communauté autochtone de Marten Falls Préparé par: Présenté à: AECOM Canada Ltd. 105 Commerce Valley Drive West, 7th Floor Markham, ON L3T 7W3 Canada T: 905.886.7022 F: 905.886.9494 www.aecom.com Marten Falls First Nation Date: Août 2019 Projet #: 60593122 Soumis à l’Agence canadienne d’évaluation environnementale AECOM Communauté autochtone de Marten ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Key Document Display Filters

Date modified: