Document Notice of Determination - Phase 2 Polar Icebreaker dredge Project - Vancouver Fraser Port Authority

  • Project Phase 2 Polar Icebreaker Dredge Project
  • Document Category: Additional Information
  • Reference Number: 3
  • Document Date: 2026-09-30
  • Document: 168178E.html
  • Relevance: 396.19
  • Notice of Determination North Vancouver, B.C. – October 1, 2026 – The Vancouver Fraser Port Authority has determined that the proposed Phase 2 Polar Icebreaker dredge Project located at 10 Pemberton is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: Impacts on rights of Indigenous peoples Indigenous knowledge Community knowledge Comments received from the public Technically ...
1 alternate format found
French HTML
  • Relevance: 345.19
  • Avis de détermination North Vancouver (BC). –  1 octobre 2026 – L'Administration portuaire Vancouver-Fraser a déterminé que la proposition de projet de dragage du brise-glace polaire de phase 2, 10 Pemberton, n'est pas susceptible d'avoir des effets négatifs importants sur l'environnement. Cette détermination a été obtenue en considérant les facteurs suivants : Conséquences sur les droits des peuples autochtones Savoirs autochtones Savoirs communautaires Commentaires ...

Document Update from Fisheries and Oceans Canada

  • Project Phase 2 Polar Icebreaker Dredge Project
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2026-08-24
  • Document: 167695E.html
  • Relevance: 392.2
  • Update from Fisheries and Oceans Canada Fisheries and Oceans Canada (DFO) has determined that it no longer has responsibilities under section 82 of the Impact Assessment Act with respect to the proposed Phase 2 Outfitting Pier Polar Dredge Project. As a result, DFO will not be conducting an assessment or making a determination as to whether the project is likely to result in significant adverse environmental effects.   The review and determination of the proposed project will proceed ...
1 alternate format found
French HTML
  • Relevance: 341.2
  • Mise à jour de Pêches et Océans Canada Pêches et Océans Canada (MPO) a déterminé qu'il n'a plus de responsabilités en vertu de l'article 82 de la Loi sur l'évaluation d'impact relativement au projet proposé de dragage pour l'aménagement du quai de la phase 2 de Polar. Par conséquent, le MPO ne procédera pas à une évaluation et ne déterminera pas si le projet est susceptible d'entraîner des effets environnementaux négatifs importants. L'examen et la décision concernant le projet se ...