Rehabilitation of 3 water supply extensions on pre-existing schemes in Northern Ethiopia

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Rehabilitation of 3 water supply extensions on pre-existing schemes in Northern Ethiopia
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2023-09-29
  • Document: 153140E.html
  • Relevance: 311.28
  • Notice of Determination Ottawa – September 29, 2023 – Global Affairs Canada has determined that the proposed rehabilitation of 3 water supply extensions on pre-existing schemes in Northern Ethiopia is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: community knowledge; comments received from the public; and technically and economically feasible mitigation measures. Mitigation measures taken into ...
1 alternate format found
French HTML
  • Relevance: 260.28
  • Avis de décision Ottawa – 29 septembre 2023 – Affaires mondiales Canada a déterminé que le projet de réhabilitation de 3 extensions d'approvisionnement en eau sur des systèmes préexistants dans le nord de l'Éthiopie n'est pas susceptible de causer des effets négatifs importants sur l'environnement. Cette détermination reposait sur les facteurs suivants : connaissances communautaires; commentaires reçus du public; et mesures d'atténuation réalisables sur les plans technique et ...

Document Notice of Intent to Make a Determination - Start of Public Comment Period

  • Project Rehabilitation of 3 water supply extensions on pre-existing schemes in Northern Ethiopia
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2023-04-24
  • Document: 147425E.html
  • Relevance: 298.8
  • Public Notice Rehabilitation of 3 water supply extensions on pre-existing schemes in Northern Ethiopia - Public Comments Invited April 24, 2023 – Global Affairs Canada must determine whether the proposed rehabilitation of 3 water supply extensions on pre-existing schemes in Northern Ethiopia (Koneba (Afar Region, Zone 2), Guba Lafto (North Wollo, Amhara Region) and Medeba Zana (Tigray Region)) is likely to cause significant adverse environmental effects. To help inform this determination, ...
1 alternate format found
French HTML
  • Relevance: 247.8
  • Public Notice Réhabilitation de 3 extensions d'approvisionnement en eau sur des systèmes préexistants dans le nord de l'Éthiopie - Période de consultation publique 24 avril 2023 – Affaires mondiales Canada doit déterminer si le projet proposé de la réhabilitation de 3 extensions d'approvisionnement en eau sur des systèmes préexistants dans le nord de l'Éthiopie (11.663240, 37.821903) est susceptible d'entraîner des effets négatifs sur l'environnement. Afin de contribuer à une prise de ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Date modified: