Cooper Cove Marine Terminal Expansion Project

Registry Search Mobile

Registry Search

Skip to Filters

16 results

Document Notice of Transition to the Amended Impact Assessment Act

  • Project Cooper Cove Marine Terminal Expansion Project
  • Document Category: Additional Information
  • Reference Number: 25
  • Document Date: 2024-08-02
  • Document: 158340E.html
  • Relevance: 328.76
  • Notice of Transition to the Amended Impact Assessment Act   Ottawa — August 2, 2024 — On June 20, 2024, the Budget Implementation Act, 2024, No. 1 received Royal Assent and brought into force amendments to the Impact Assessment Act (the IAA). Transitional provision 305 of the Budget Implementation Act, 2024, No. 1 states that, in order to bring a designated project under the IAA, the Minister of Environment and Climate Change or the Impact Assessment Agency of Canada (IAAC) must take a ...
1 alternate format found
French HTML
  • Relevance: 277.76
  • Avis de transition à la Loi sur l'évaluation d'impact modifiée   Ottawa — Le 2 août 2024 — Le 20 juin 2024, la Loi no 1 d'exécution du budget de 2024 a reçu la sanction royale entraînant ainsi l'entrée en vigueur des modifications apportées à la Loi sur l'évaluation d'impact (la LEI). La disposition transitoire 305 de la Loi no 1 d'exécution du budget de 2024 stipule que, pour qu'un projet soit désigné en vertu de la LEI, le ministre de l'Environnement et du Changement climatique ou ...

Document Notice of Impact Assessment Decision with Reasons

  • Project Cooper Cove Marine Terminal Expansion Project
  • Document Category: Additional Information
  • Reference Number: 24
  • Document Date: 2024-08-02
  • Document: 158339E.html
  • Relevance: 328.76
  • Notice of Impact Assessment Decision with Reasons August 2, 2024: The Impact Assessment Agency of Canada is posting this Notice of Decision in accordance with the Notice of Transition. Ottawa — August 2, 2024 — The Impact Assessment Agency of Canada (IAAC) decided that an impact assessment is not required for the Cooper Cove Marine Terminal Expansion Project (the project) located in Newfoundland and Labrador, proposed by the Port of Argentia (the proponent). On April 8, 2024, ...
1 alternate format found
French HTML
  • Relevance: 277.76
  • Avis de décision relative à une évaluation d'impact avec motifs Le 2 août 2024 : L'Agence d'évaluation d'impact du Canada affiche cet avis de décision conformément à l'avis de transition. Ottawa — Le 2 août 2024 — L'Agence d'évaluation d'impact du Canada (l'AEIC) a décidé qu'une évaluation d'impact n'est pas requise pour le projet d'agrandissement du terminal maritime de Cooper Cove (le projet) situé à Terre-Neuve-et-Labrador, proposé par le port d'Argentia (le promoteur). Le ...

Document Notice of Opinion on Whether an Impact Assessment is Required

  • Project Cooper Cove Marine Terminal Expansion Project
  • Document Category: Additional Information
  • Reference Number: 19
  • Document Date: 2024-04-08
  • Document: 157615E.html
  • Relevance: 318.8
  • Notice of Opinion on Whether an Impact Assessment is Required Ottawa — April 8, 2024 — The Impact Assessment Agency of Canada (the Agency) is of the opinion that an impact assessment is not required for the Cooper Cove Marine Terminal Expansion Project (the project) proposed by the Port of Argentia (the proponent), located in Newfoundland and Labrador. In applying the measures outlined in the Statement on the Interim Administration of the Impact Assessment Act Pending Legislative ...
1 alternate format found
French HTML
  • Relevance: 267.8
  • Avis sur l'opinion quant à la question de savoir si une évaluation d'impact est justifiée Ottawa — 8 avril 2024 — L'Agence d'évaluation d'impact du Canada (l'Agence) est d'avis qu'une évaluation d'impact n'est pas justifiée pour le projet d'agrandissement du terminal maritime de Cooper Cove (le projet) proposé par le port d'Argentia (le promoteur), situé à Terre-Neuve-et-Labrador. En application des mesures décrites dans la Déclaration sur les dispositions provisoires relatives à ...

Document Summary of the Detailed Project Description of a designated project

  • Project Cooper Cove Marine Terminal Expansion Project
  • Document Category: Additional Information
  • Reference Number: 20
  • Document Date: 2024-03-15
  • Document: 157102E.pdf
  • Relevance: 316.79
  • PORT OF ARGENTIA Cooper Cove Marine Terminal Expansion Project Detailed Project DescripƟon Part G – Newfoundland and Labrador March 2024 - 21-3088 45 Hebron Way Suite 202 St. John’s Newfoundland and Labrador Canada A1A 0P9 Telephone 709.754.2374 Fax 709.754.2380 Dillon Consulting Limited March 15, 2024 Newfoundland and Labrador Satellite Office Impact Assessment Agency of Canada / Government of Canada 301-10 Barters Hill St. John’s, Newfoundland and Labrador A1C 6M1 Attention: Leslie ...
1 alternate format found
French PDF
  • Relevance: 265.79
  • PORT D’ARGENTIA Projet d’agrandissement du terminal maritime de Cooper Cove ParƟe G – Résumé en langage simple – DescripƟon détaillée du projet– Terre-Neuve-et-Labrador mars 2024 – 21-3088 45 Hebron Way Bureau 202 St. John’s Terre-Neuve-et- Labrador Canada A1A 0P9 Téléphone 709.754.2374 Télécopieur 709.754.2380 Dillon Consulting Limited mars 15, 2024 Bureau satellite de Terre-Neuve-et-Labrador Agence d’évaluation d’impact du Canada / Gouvernement du Canada 301-10 Barters Hill St. ...

Document Summary of issues

  • Project Cooper Cove Marine Terminal Expansion Project
  • Document Category: Additional Information
  • Reference Number: 18
  • Document Date: 2024-01-19
  • Document: 155709E.html
  • Relevance: 312.17
  • Summary of Issues – Cooper Cove Marine Terminal Expansion Project This document provides a high-level summary of issues that were submitted to the Impact Assessment Agency of Canada (the Agency) about the Cooper Cove Marine Terminal Expansion Project (the Project) during the public comment period on the Summary of the Initial Project Description (IPD), submitted by the Port of Argentia (the Proponent). The issues highlight information that will be considered by the Agency in forming its ...
3 alternate formats found
English PDF
  • Relevance: 312.17
  • JANUARY 19, 2024 – COOPER COVE MARINE TERMINAL EXPANSION PROJECT – SUMMARY OF ISSUES – Page 1 of 11 SUMMARY OF ISSUES – Cooper Cove Marine Terminal Expansion Project This document provides a high-level summary of issues that were submitted to the Impact Assessment Agency of Canada (the Agency) about the Cooper Cove Marine Terminal Expansion Project (the Project) during the public comment period on the Summary of the Initial Project Description (IPD), submitted by the Port of ...
French HTML
  • Relevance: 261.17
  • Sommaire des questions – Projet d'agrandissement du terminal maritime de Cooper Cove Le présent document fournit un résumé général des questions présentées à l'Agence d'évaluation d'impact du Canada (l'Agence) à propos du projet d'agrandissement du terminal maritime de Cooper Cove pendant la période de consultation sur le résumé de la description initiale du projet (DIP), présenté par le port d'Argentia (le promoteur). Ces questions mettent en évidence les renseignements qui seront pris en ...
French PDF
  • Relevance: 261.17
  • 19 JANVIER 2024 – PROJET D’AGRANDISSEMENT DU TERMINAL MARITIME DE COOPER COVE — SOMMAIRE DES QUESTIONS – Page 1 of 12 SOMMAIRE DES QUESTIONS – Projet d’agrandissement du terminal maritime de Cooper Cove Le présent document fournit un résumé général des questions présentées à l’Agence d’évaluation d’impact du Canada (l’Agence) à propos du projet d’agrandissement du terminal maritime de Cooper Cove pendant la période de consultation sur le résumé de la description initiale du projet ...

Document Summary of the Initial Project Description of a designated project

  • Project Cooper Cove Marine Terminal Expansion Project
  • Document Category: For Public Participation
  • Reference Number: 2
  • Document Date: 2023-11-29
  • Document: 154696E.pdf
  • Relevance: 308.04
  • PORT OF ARGENTIA Cooper Cove Marine Terminal Expansion Project IniƟal Project DescripƟon Part F – Newfoundland and Labrador November 2023 - 21-3088 45 Hebron Way Suite 202 St. John’s Newfoundland and Labrador Canada A1A 0P9 Telephone 709.754.2374 Fax 709.754.2380 Dillon Consulting Limited November 29, 2023 Newfoundland and Labrador Satellite Office Impact Assessment Agency of Canada / Government of Canada 301-10 Barters Hill St. John’s, Newfoundland and Labrador A1C 6M1 Attention: ...
1 alternate format found
French PDF
  • Relevance: 257.04
  • PORT D’ARGENTIA Projet d’agrandissement du terminal maritime de Cooper Cove ParƟe F – Résumé en langage simple – DescripƟon iniƟale du projet et évaluaƟon environnementale – Terre-Neuve-et-Labrador novembre 2023 – 21-3088 45 Hebron Way Bureau 202 St. John’s Terre-Neuve-et- Labrador Canada A1A 0P9 Téléphone 709.754.2374 Télécopieur 709.754.2380 Dillon Consulting Limited novembre 29, 2023 Bureau satellite de Terre-Neuve-et-Labrador Agence d’évaluation d’impact du Canada / Gouvernement ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Key Document Display Filters

Date modified: